Loading…
Loading…
2,154 results • Best match
Idamalayar HEP Round the clock monitoring, operation and periodical maintenance of the Intake gate, radial gates, DVH etc., of Idamalayar Dam for the year 2021-22.
Right bank canal (RBMC) starting from Malampuzha Dam 0/000 Km is up to 32/000 Km long and having main branch canals such as Puthupariyaram
The road safety marking in various roads has been vanished due to the weir and tier happend.Hence its very necessary to provide road road safety marking. This road is carring heavy amount of traffic during school hours
Execution of Balance Civil works of Pazhassi Sagar SHEP (3X2.5 MW)- Construction of Intake structure, Silt control weir, Tunnel Back filling, Fabrication Supply and erection of Steel liners, Construction of Power House, Tail race channel, Access road
Earth work, cement concrete, reinforcement, plastering etc
Desiltation
Kandathippalam bhagom V C B is located near Kandathippalam padasekharam in ward No .10 of Rajakumary Panchayath
Earth work, Clearing Jungle, Engaging hydraulic excavator
Pre-monsoon preparedness works
CIVIL WORKS
RR masonry,centring and shuttering,PCC 1 2 4,Steel re inforcement,clearing jungle
Desiltation
Clearing the jungles,Painting and applying lubricating oil and grease to the shutters etc. Due to the shortage of workers under this section, Provision for man mazdoor for spillway duty during emergency time for operating shutters
Earth work, clearing jungle, engaging hydraulic excavator
Earth work desiltation
Urgent repair works of Road
DRIP II- SGHEP-Providing fencing to control shaft, protective roofing to hoist structure of IC tunnel intake structure, Pressure washing at Pamba Dam and other allied works
Annual Plan-Nanniyode GP 2024-25, Project 315/25-KANNANASARIMUKKU ROAD SIDE WALL CONSTRUCTION IN WARD-4-General Civil Work DAM ROAD RECONCRETE - W-3-General Civil Work
Renovation of Panchalikulam, Construction of pathway, check dam, parking, boat jetty, supply, installation and ancillary works for Solar Street lighting, landscaping, construction of Burma Bridge, Rope cycling etc
GENERAL-Investigation work of proposed check dam across Manali river at Alpara Chorakadavu in ward no 21 of Pananchery Grama Panchayath-OL-IA/6019/2022-General Civil Work
Protection work with 2m high DRM wall for a length of 75m and desiltation for a length of 126m and depth avg 60cm and repair check dam shutter
1. Dry Laterite Retaining wall up to 1.5M Height (95 Rm) 2. Dry Laterite Retaining wall up to 1M Height (35 Rm) 3. Concrete Check Dam 2.10m wide
Earth work, cement concrete , shuttering, RCC, filling and painting etc
ring bund,bailing out .earth work,centering and shuttering,concrete work
close graded 20mm cC
Clearing jungle, demolishing CC, Demolishing brick work, Demolishing RR, Earthwork excavation,providing and laying CC,providing RR,RCC, Centering and shuttering,brick work, cement plastering, white washing,interlocking, fixing handrails,painting
Damaged portions are rectified using WMM and BM and BC is proposed. Shoulder protection work with PCC and M20 concrete is proposed for the rectification of eroded locations at RHS and LHS of the road. Road safety works are included
Existing panel board in the gallery is in damaged condition and it should be replaced with a VDB. The provision for 1 no. of three phase 4 way VDB and connected accessoaries also included in this estimate 1 No. of 7.5 HP submersible motor
Supplying and Stocking hard brocken Stone,Supplying and fixing 12mm hard blue granite ,Filling up pot holes,providing pre mix bitumin,tack coat with bitumin emulsion,laying and rolling ,thermoplastic compound ,Earth work excavation,concrete works etc
Earth work cement concrete centering plastering etc
landscaping in the garden area, providing sprinkler system and provision of pathway at damtop
Annual maintenance
Soil Investigation Work
Annual Maintanance 2024-25
Refer tender documents
GENERAL-Repairs and Maintenance of Structures-Supplying and Fixing FRP shutters at Kariyankode vented Check dam across Kariankode river in Cherupuzha in Payyannur Constituency ,Kannur District.-General Civil Work
Malampuzha Dam is one among the top tourist places in Palakkad, Kerala. There is heavy rush of people in to this place especially in holidays, vacation and festival seasons
1. Deepening of Thodu -114Rm 2.Retaining wall 1.80 m height- 208 Rm 3. Retaining wall 1.20 m height- 20 Rm 4. Retaining wall cum Check dam- 2 Nos
GENERAL-Monsoon Preparedness 2023- Meenkuzhi-Urgent works required for ensuring the smooth flow during monsoon through Vannathippuzha near Meenkuzhi dam in kadannappalli-Panapuzha Panchayath, Kalliasseri Constituency in Kannur Dist
TWSS- Mace- Removal of floating wastes and weeds accumulated in Aruvikkara reservoir near dam and the area to the north of 72MLD Raw Water Pump house during Monsoon rains
Capacity enhancement of 66 KV Substation Kochupamba- Replacing 4 MVA 66/11 KV Transformer No.02 with 66/11 KV,10 MVA Transformer.
Emergency Monsoon Preparedness
Topographic survey, Boundary stone, Boring bore holes, Mobilization , Boring rotary power, Erecting plat form , Hire charges for second class boat, Boring hard rock, Core boxes