Loading…
Loading…
2,154 results • Best match
Construction of protection wall
VENTED CROSS BAR
NC 2019-20 Protection work
Const of protection wall , concrete lining for Vent way and Abutments , Replacement of damaged shutters with FRP shutters etc
Supplying and Laying of HDPE pipe and allied works
VCB Construction
WMM,Taring
Road concrete
29thJCBactionplanSITC of25KVADGsetand electrificationforSiruvani DamInstallationofDsetand electrificationforIntake valveatSiruvani DamGeneral Electrical Work
Annual maintenance
MAINTANANCE
Investigation work
Providing and fixing PVC pipes includings jointing of pipes and Supplying and fixing PVC storage tank of 1000 Litre capacity. Hence this estimate is prepared for the plumbing work for the new motorset
Construction of Check Dam, RWGM, CWGM, CWPM, GLSR cum Filter tank, Distribution system and Providing balance FHTCs in Maruthonkara Grama Panchayath
Several air holes inside the inspection gallery of Malampuzha Dam have been partially or fully clogged due to calcination inside them
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Plastering etc
RCC work
Repair of canal
ROAD WORK
PCC 1 2 4 ,floor Tiles,finishing works,demolishing,painting,plastering etc
Considering the monsoon time and last dualflood situvation, Which are blocked with earth and Tree falling during monsoon flowing brances.Hence an estimate is prepared The hydraulic excavator also provided
Rwmwdies for water logging and side wall
Annual maintenance
Construction of checkdam cum footbridge
The items of work include dismantling old doors and windows, providing GI roofing sheets over steel truss frame, roofing accessories like ridge/hip sheets, fixing steel doors and windows and providing enamel paint to them
CIVIL WORK
Garden maintenance work
Providing and fixing 3 layer,Providing and fixing enclosed type water meter,Providing and fixing CI dirt box,Constructing masonry chamber,Supplying and fixing of C I valve 110 mm size
tarring
Annual maintenance of IB building Annual maintenance of office building
Appendix 1 Annual maintenance of IB building annual maintenance and upkeep of building throughout the year, which is why this estimate has been prepared and proposed Appendix 2 Annual maintenance of office building
Clearing jungle and grass cutting labours included cleaning , sweeping, and washing the bed sheets and pillow cover, carpenter, plumber, electrician etc
Re-painting of power house, steel bridge near power house Re-painting of MS cover of surplus channel at Vilangad SHEP and Leak rectification of acquired building near weir to prevent collapse
Soil and water conservation works-Construction of check dam with laterite masonary side protection work for existing recharge pond and revetment works.
Constructing cable duct, extension of boundary wall, providing trussed roof above spillway gate hoisting platform, repainting gantry crane of Lower Periyar dam
Tirurangadi Block Panchayath Annual Plan 2019 2020 . Project No 33 Repair works to naduthodu construction of check dam at peruvallur grama panchayath
AUCTION OF VARIOUS TYPES 190 NOS OF TREES, FROM 75 CM TO 250 CM GIRTH LOCATED AT ARUVIKKARA DAM SITE, KOLLAMALA STORE.
SDRF 2018 Urgent rectification of side bund of upstream side of eettichuvad check dam in ward no.10 of Chittar Grama Panchayath
GENERAL-MIP/AM/7/2023-24 (Eryam Poorakkadavu)-Annual Maintenance of Weir cum Tractorway across Eriyam River at Poorakkadavu in Kadannappally - Panapuzha Panchayath in Kalliasseri Constituency, Kannur District for the year 2023-24
GENERAL-MIP/AM/7/22-23-Annual Maintenance of Weir cum Tractorway across Eriyam River at Poorakkadavu in Kadannappally - Panapuzha Panchayath,Kalliasseri Constituency, Kannur District for the year 2022-23 -General Civil Work
Construction of Diversion weir with intake Power channel Forebay Surplus channel Fabrication and erection of Penstock Pipes with specials, Construction of Power House Tail race pool and Channel Access roads Bridge Switch Yard
Auctioning various types of 190 nos of trees, from 75 cm to 250 cm girth located at aruvikkara dam site, Kollamala Store Areas.
Jungle Clearance and mace of road from Idr security check post to dam top bottom and ADIT road for the year 23-24
GENERAL Monsoon Preparedness 2025 26 Desiltation of Upstream of Vradoor Check Dam in Kaniyambetta Panchayath In Kalpetta LAC Wayanad District General Civil Work
GSB, WMM,Taring work, Masonry work
Earth work, RCC, Dr
desiltation
Construction of Temporary bund
ROAD WORK