MTPS I CA RWS Extension of Automatic Sprinkler system with necessary accessories up to the apron feeder of Tunnel conveyers of 1 to 4 at CHP I area
MTPS I BM Unit III Rotating parts AOH 2021 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 120 days from the date of commencement of work Phase II
MTPS I TM Units I to IV Attending the preventive breakdown maintenance works of Valves Pipe Lines reducers by cutting and welding gasket renewing of valves flanges etc
MTPS I TM I Overhauling the existing 2 Nos dust extraction fan of Alumina blasting shed by cleaning renewal of bearing gaskets and cleaning inside Alumina blasting shed dust collecting water tank painting etc during 2024 25
MTPS I Boiler Rotating parts Units I and II Preventive Breakdown maintenance Works and other allied works as and when required basis for the period of 120 days from the date of commencement of work Phase II
MTPS I - Civil Circle - Attending rectification works in damaged RCC Column by providing micro concrete in outhaul side in Wagon Tippler of Unit I of MTPS I
MTPS I BM Unit II Capital overhauling 2024 25 Overhaul of ESP AB and CD pass Internals and related works
MTPS I TM Unit IV Removal of Insulation and providing Re Insulation to Pipe Lines Valves Gland Steam Cooler Low Pressure Heater Flash tank and its accessories and disposal of waste insulation materials for Unit IV during Annual overhaul 2023 24
MTPS I TM Unit I Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit I
MTPS I CA CWS I Reconditioning of GRP fan blades 2 set of Cooling Tower ID fans of Unit I and II
MTPS I CA CWS II Unit IV De watering complete cleaning sludge removal cleaning with bleaching powder painting the structure of Clarifier IV dismantling of damaged sun shield roofing sheets etc
MTPS I Mill Plant Unit II Hard facing of vertical coal pipe 1 mtr length after Transition piece 24 Nos in Mill 2A to 2F during Annual overhaul 2020 21
MTPS I BM Unit III Rectification of damaged and dislocated ERV silencer assembly and other related works during annual overhaul 2024
MTPS I - Civil Circle Replacing the damaged FRP sheet with new FRP sheet for Windows in Unit I, II, III and IV Bunkers at MTPS I
MTPS I M I Circle CA Fire Protection Checking of Deluge valves Cleaning of spray nozzles in Emulsifyre system of GTs UATs MOTs COTs and DOTs of Unit I to IV and ST I and II etc
MTPS I TM Unit IV Cleaning and Hydraulic Testing of Lub oil Coolers and Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs and CEPs etc
MTPS I Civil Circle Improvement works to the DM Plant Stage I by colour washing the chemical lab, toilet and bathroom and other allied various civil works at MTPS I
MTPS I BM Unit II Boiler pressure parts AOH 2022 Water Washing of boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil Overhauling of water wall soot blowers and LRSB etc
MTPS I Mill Plant Unit III Clearing the Mill rejects from Unit III Mill Feeder area weighing in departmental weigh bridge etc
MTPS I BM Unit II Boiler Pressure Parts AOH 2020 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I TM Unit IV Modification of existing Gland sealing arrangements of Condensate Extraction Pumps 4A and 4B for Assembling Testing and Commissioning of Complete Split Type Mechanical Seal Assembly for CEP 4A and 4B Model EN5J40
MTPS I TM UNIT IV Replacing the Defective MSSV L By Pass Regulation Valve Deaerator pressure control valve Changing the eroded HD 1 2 14 HD 15 control valve outlet side reducers bends and changing the defective eroded plug broken 1 2 drain
MTPS I BM Inspection Overhauling and top up of resin in Strong Acid Cation Ion Exchanger II of Stage II DM Plant
MTPS I TM UNIT II changing the eroded control valves reducers expanders pipes and bends changing the defective HD 21 isolation valve by cutting and welding changing the eroded HPT Transfer pipe drain line 2 pipes and defective 1 and 2 drain li
MTPS I TM UNIT II Overhauling Arresting of Steam passing in LP Bypass Valves LHS Model No NR 64 500 EK during Unit II AOH 2023
MTPS I BM Unit III Rotating parts Arresting of Flue gas leakages in ID fan 3A and 3B casing area and Removal of deteriorated and peeled off insulation and re insulation with new same insulation materials on the Portion
MTPS I Mill Plant Unit IV Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces and fabrication of spool piece Multiple port outlets etc
MTPS I BM Unit II Boiler Pressure parts AOH 2023 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I BM Unit IV Boiler pressure parts AOH 2021 Dismantling cleaning and rectification of defective seal trough seal plates S S woven wire mesh providing patch plate renewal of damaged insulation and skin casing sheet of bottom ring header
MTPS I Mill Plant Unit II Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
MTPS I BM Unit IV Annual maintenance 2021 22 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers
MTPS I TM Unit II Complete overhauling and painting of Instrument Air Compressors 2A 2B 2C
MTPS I BM Unit I Boiler Pressure parts AOH 2023 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I Civil Circle - Repair works to the existing damaged floor tiles and wall tiles by fixing of new antiskid floor tiles, replacement of damaged wash basin, water closet and attending other allied works in Unit II 4.50 Mtr Floor (Stage 1) Gents
MTPS I CA CWS I Overhauling of 1600 mm BFV including Actuator GB Overhauling checking and renewal of Nitril rubber seal Painting of Intake Screen of Cooling water Pumps 2A 2B and 2C etc
MTPS I Mill Plant Unit III Clearing the Mill rejects from Unit III Mill Feeder area weighing in departmental weigh bridge and transporting to rejects yard G etc
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works
MTPS I CA RWS Complete Overhauling of Auxiliary Cooling Water Pumps 6 Nos
MTPS I CA CWS I Dewatering sludge removal Complete cleaning and applying bleaching powder in the inner and outer rings andpainting of MS structures in Clarifier II during AOH of Unit II
MTPS I BM Unit I Boiler Pressure parts AOH 2024 Overhauling of HP LP valves and replacement of defective valves
MTPS I Mill Plant A C Plant Unit IV Annual overhaul 2022 23 Air Washer System Epoxy painting of blowers 4A and 4B discharge duct and spray system Overhauling the AWCW Pump 4A and 4C etc
MTPS I BM DM Plant Neutralizing pits below ground level size 9.5m X 6.5m X 3.5m Cleaning and removing of sludges of acidic alkaline and lime slurry formed during neutralization of effluent water in neutralizing pits of Stage I and II etc
MTPS I - Civil Circle Clearing the light and heavy jungles in east side of Cooling tower III, IV and Clarifier 3 and 4 etc., at MTPS I.
MTPS I Mill Plant Unit III Overhauling of tramp iron chute knife edge gate valves and laying of pneumatic line in mills 3A to 3F during AOH 2021 22
MTPS I CA CWS I De watering complete cleaning and sludge removal Cleaning with bleaching powder painting the structure of clarifier I during AOH 2023 24
MTPS I BM Unit I Rotating parts AOH 2023 24 Overhauling reconditioning of CERM EERM gear boxes and other related works etc
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS and RHS of condenser tubes in Unit II condenser during AOH of 2023 24
MTPS I BM Unit I Boiler Statutory Inspection 2022 23 Flue Gas duct B side Patch up works and other repair works between APH outlet to ESP inlet
MTPS 1 BM Unit IV Inspection Renewal of Guide bearing in Air pre Heater A and B sides and dismantling cleaning inspection and reassembling of air seal assembly etc and other related works during AOH 2023 2024