Loading…
Loading…
586 results • Best match
Foundation, substructure, Superstructure, Protection Works, Approach Road and Retaining Wall
SPL REPAIR OF BLDG NO. T-301 (OR LIVING SHELTER), SPL REPAIR OF BLDG NO. T-473 AND T-477, SPL REPAIR OF BLDG NO. T-436, T-442 AND OWT-649, SPL REPAIR IN BLDG NO. T-238, (OR LIVING SHELTER) AND T-268 (TOILET AND BATHROOM), PROVN OF COVERED DRAINAGE AT
REPAIR AND MAINTENANCE OF CHAIN LINK FENCING, DRAIN AND OTHER CONNECTED WORKS AT 190 MTN BDE AREA, CHUJE GG, APJD ZONG AND MRATHA GROUND UNDER GE TAWANG
Jungle Clearance, embankment raising, GSB, WBM II and WBM III, CTB, MSS and cross drainage structures
Repair and Maintenance of Fsb
Repair and Maintenance of FSB
Improvement of Approach Road of Govt middle school Yari Babar SH CC pavement RCC Wall RCC wall and Storm drain with slab RCC retaining Wall at press colony
REPAIR AND MAINTENANCE INCLUDING PAINTING TO DISPERSAL LINK, TAXI TRACK, CLEANING OF DRAIN AND CERTAIN OTHER B/R WORK AT ALG WALONG AND ALONG UNDER GE (AF) MOHANBARI.
Site clearence , Embankment, Shoulders, GSB, Bituminous course, CTB, Sign and Logos, Cross Drainage Structures and Setting out
The work includes construction of new road. The scope includes formation cutting, Non Bituminous and Bituminous courses, protection wall, Culverts and Drains.
Emergent Erosion Control at Km 705.700 of NH-13 RHS Near Tezu Nallah River and Lohit River Confluence Point and River Training Works to prevent RHS Breach of NH-13
Hardstanding and Drain
Supply, Installation, Testing and Commissioning of Tower AC 2 TON Capacity along with Copper Pipe, ODU Stand, Tapping Roll, PVC Drain Pipe and other accessories . (5 Time Installation and Commissionin
REPAIR/ MAINTENANCE OF DRAIN, FENCING, RETAINING WALL, CAMOUFLAGE PAINTING, HELIPAD PAINTING AND CONNECTED WORKS, CLEANING OF SEPTIC TANK, SOAK WELL, SEWAGE LINE, MAN HOLE, AT ALG TAWANG AREA UNDER GE TAWANG
Construction of development and bulk services including RCC culvert road RCC drain etc fopr SHQ likabali Arunachal Pradesh SW Hiring of inspection vehicle for the office of EE and SM Kimin
Jungle Clearance, Formation Cutting, GSB, WBM, BT, Culverts, Protection works, CC Drain, Kutch Drain
precast box culvert, Precast lined drain for km 0.00 to 1.5., Precast lined drain for km 1.5 to 3.00, Precast lined drain for km 3.00 to 4.5., Precast lined drain for km 4.5 to 6.844
Site clearence , Embankment, Shoulders, GSB, WBM III and II, Bituminous course, Sign and Logos, Cross Drainage Structures and Setting out
SPL REPAIR OF BLDG NO T-511, T-510 AT FD HOSP AND DRAINAGE OF 1 MAHAR FOR BLDG NO P-65, P-66, P-67, P-68, P-69, P-70 AND P-72 AND PROVN OF CHEQUERED TILING FOOT PATH FROM BLDG NO. PO-7 TO PO-6 AT OR MD ACCN GACHHAM OF JAT OF UNDER GE TENGA.
Construction of Approach road from Circuit house to helipad at Lungsa under phassang Circle SH FC Site Development Side Drain Breast and Retaining Wall BT Pilot rest room with toilet security fencing
Construction of Intermediate CC Pavement Link road from NH-515 to Tabi Diking road (L-3 Kms) in East Siang District. SH - CC Pavement, RCC drain, Box culvert, protection works and embankment.
Safety Valve Kit, Auto Drain Valve sensor, auto Drain Valve Kit, welding Rod, Oil Filter
PROVN OF RETAINING WALL, HARD STANDING FOOT PATH INTERLOCKING TILE AND DRAIN WORKS AND SPL REPAIR TO BUILDING NO TOP/21/134 OF AGE B/R AND AGE E/M UNDER GE TENGA
REPAIR AND MAINTENANCE OF DRAIN, HARDSTANDING AND PCC PATH/STEP, CHAIN LINK FENCING AND OTHER CONNECTED WORK AT 190 MTN BDE AREA, CHUJE GG, APJD ZONG AND MARATHA GROUND AREA UNDER GE TAWANG.
Strip Seal Expansion Joint, Drainage Spout, Neoprene Pad with Glued (size 400 mm x 10 mm thick x 900 mm length)
Construction of approach road from Nyapin township road to Helipad at Nyapin ADC Hq in Kurung Kumey District AP SH FC Retaining and Breast wall CC Drain BT and Pilot rest room with toilet
1.C/o Various Civic Infrastructure under Ward-18(SH CC Footpath, CC Drain, Solar Streetlight, RCC Wall) at A-sector, Upper Rakap Colony, Lower Rakap Colony, Youth Hostel and Upper Police Colony, Naharlagun.
Earthwork, CD Structure, CC Drain, Pavement
1 Cleaning,desiilting and maintainance of damsite riverlast damsite to polo steel bridge 2 RCC drain near foot over bridge polo park down colony 3 RCC pillar and entrance gate at govt ME school Demsite
REPAIR / MAINTENANCE OF DRAIN, PCC PATH AND OTHER CONNECTED WORK AT 190 MTN BDE AREA, 190 MTN BDE SIGNAL COY, 725 (I) AD PL ASC, STN HQ TAWANG AND MARATHA GROUND AREA UNDER GE TAWANG
C/o Approach road from PMGSY road to Luwa Happa ta Byasi Village and Tachak Village under Nyobia in Kurung Kumey district (Ph-II)(SH R and B wall Slab Culverts CC drain Geometrical Construction BT).
REPAIR / MAINTENANCE OF DRAIN, PCC PATH, HARD STANDING AND OTHER CONNECTED WORK AT 190 MTN BDE AREA, 190 MTN BDE SIG, 725 (I) AD PL ASC, STN HQ TAWANG AND MARATHA GROUND UNDER AGE (I) TAWANG
Modernization and Renovation works with Yard light, Boundary wall, Drainage, driveway, tank farm upgradation, 2 nos new pump installation at Along AFS, Arunachal Pradesh
Gabion Structure Pucca Side Drain Earthen Drain R B Wall Sub Grade preparation Shoulder WBM III and PMC Road Furniture etc
Pucca Side Drain, Earthen Drain, R/B/Wall, Sub Grade preparation, Shoulder, GSB G-I, WBM-III PMC, Road Furniture etc.
SUPPLY AND STACKING OF PRECAST CONCRETE DRAIN AND PRECAST CONCRETE BOX CULVERT BETWEEN KM 183.00 TO KM 222.00 ON BALIPARA-CHARDUAR-TAWANG ROAD IN SECTOR OF 90 RCC UNDER 42 BRTF (P) VARTAK IN STATE OF ARUNACHAL PRADESH
SUPPLY AND STACKING OF PRECAST CONCRETE DRAIN AND PRECAST CONCRETE BOX CULVERT BETWEEN KM 0.00 TO KM 6.500 ON SHAKTI-BTK-KUMROTSAR ROAD IN SECTOR OF 127 RCC UNDER 42 BRTF (P) VARTAK IN STATE OF ARUNACHAL PRADESH
FC, Shoulder, GSB, CD, Protection Work, Drain etc
Air Conditioner, Stabilizer, wall mount, Drain pipe, Installation
REPAIR AND MAINTENANCE OF DRAIN, PCC PATH AND OTHER CONNECTED WORK AT 24 SIKH, TRANSIT CAMP, B DET, 384 COY ASC (SUP), 106 FD WKSHP, AT COY, 40 MTN BDE AREA, 305 FD HOSP AND NURANANG UNDER GE TAWANG
RCC Slab Culvert Pucca Side Drain Earthen Drain R B Wall Sub Grade preparation Shoulder GSB WBM III and PMC Road Furniture etc
RCC Slab Culvert, Pucca Side Drain, Earthen Drain, R/B/Wall, Sub Grade preparation Shoulder GSB WBM III and PMC Road Furniture etc
Pucca Side Drain, Earthen Drain, CD Works, R/B/Wall, Sub Grade preparation, Shoulder, GSB G-I, WBM-III PMC, Road Furniture etc.
Precast culvert from km 15 to 17.5, Precast culvert from km 17.50 to 20.31, Trapezoidal Lined drain from km 15.00 to 17.00, Trapezoidal Lined drain from km 17.00 to 19.00, Trapezoidal Lined drain from km 19.00 to 20.31
REPAIRS AND MAINT OF ROOFING, CEILING, FLOORINGOINERY, REPAIRS/ MAINT OF PLUMBING AND SANITARY FITTING, MISC REPAIR WORKS AND PERIODICAL SERVICES TO CERTAIN BLDGS AT ZONES I, II, III AND GARU DET OF ALONG MIL STN AND REPAIRS TO DRAIN, COMPOUND WALL,
SUPPLY AND STACKING OF STONE CHIPS 20.00 MM, STONE CHIPS 12.50 MM AND SAND AS PER MORTH SPECIFICATIONS TO BE SUPPLIED AT BRIDGE SITE KM 7.650 ON MIPI ANDRATHANG ROAD FOR CONSTRUCTION OF TACHO NALLAH BRIDGE AT KM 7.650 ON MIPI ANDRATHANG ROAD
FC, Pucca Side Drain, Earthen Drain, CD works, R/B/Wall, Sub Grade preparation, Shoulder, GSB G-I, WBM-III PMC, Road Furniture etc.
FC, Pucca Side Drain, Earthen Drain, CD Works, R/B/Wall, Sub Grade preparation, Shoulder, GSB G-I, WBM-III PMC, Road Furniture etc
FC,Pucca Side Drain, Earthen Drain, CD Works, R/B/Wall, Sub Grade preparation, Shoulder, GSB G-I, WBM-III PMC, Road Furniture etc
CC Road, Protection wall, Drain, GSB and Identification marks