Loading…
Loading…
173 results • Best match
Construction of Hostel Building at Donyi Polo Vidya Niketan at Pasighat for Arunachal Siksha Vikas Samiti, Arunachal Pradesh on Engineering, Procurement and Construction EPC mode
Retrofitting of State Guest House II under Smart City Mission on EPC Mode
Eco Tourism Park ,Hollongi at Itanagar under Smart City Mission on EPC Mode
IGJGHS School Heritage Redevelopment under Smart City Mission on Engineering, Procurement and Construction (EPC) Mode Contract with one year of Defect liability.
Construction of Permanent Campus of JNV at Lohit, Arunachal Pradesh on EPC Mode-II Basis
Development of Eco Tourism Park, Hollongi at Itanagar under Smart City Mission on EPC Mode (2nd CALL)
Construction of Permanent Campus of JNV at Lower Siang, Arunachal Pradesh on EPC Mode-II Basis
Construction of Permanent Campus of JNV at Pakke Kessang, Arunachal Pradesh on EPC Mode-II Basis
Work on NH-713A from km 0.00 to km 9.660 under EPC Mode for the year 2023-24
Work on NH-713A from km 9.600 to km. 29.250 under EPC Mode for the year 2023-24
Strengthening of road from Km. 30.180 to 49.250 on NH-13 under EPC Mode under Annual Plan 2023-24
2-laning of Lalpul- Manmao- Changlang road NH-215 Length 68.30Km on EPC Mode in the State of Arunachal Pradesh
Work on km 4.984, km 8.000, km 19.760, km 21.650 and km 20.145 on NH-13 under EPC mode under NH(O) Annual Plan for 2023-24
Strengthening of NH-215 from km 0.000 to km. 42.844 under Annual Plan for the year 2023-24 under EPC Mode
2-laning of Longding - Tissa - Khonsa road (NH-215) (length 42.50 Km) on EPC Mode in the State of Arunachal Pradesh
Installation of Crash Barrier on various stretches of National Highways in the state of Arunachal Pradesh under Road safety on EPC mode.
Construction of Recreation Center (Indoor Game Set) and Integrated Rehabilitation Centre for substance abuse under Pasighat Smart City Mission on Engineering, Procurement and Construction (EPC) mode Contract with one year of Defect Liability.
Design, Build, Operate and Maintain for Five years, Fully Automated AI Base Smart Parking System at TRIHMS, Naharlagun under Smart City Mission on Engineering, Procurement and Construction (EPC) Contract mode (Project)
Construction of Migging Tutting Road from CL-9 to NHDL specification Km 0.00 to Km 19.834 Design chainage under 1448 BCC 761 BRTF P BRAHMANK in EPC Mode
Construction of Minor Bridge Over Holongi River at Km 11.800 on Holongi Itanagar Section on NH 415 in the State of Arunachal Pradesh on EPC mode.
Strengthening of road from km 10.000 to km 29.500 of Hollongi to Itanagar section of NH 415 on EPC mode in the state of Arunachal Pradesh.
4 Laning of Itanagar to Banderdewa section of NH 415 from km 40/430 to km 51/735 Package B on EPC Mode in the State of Arunachal Pradesh
4 Laning of Itanagar to Banderdewa section of NH 415 from km 51/700 to km 59/199 (Package C) on EPC Mode in the State of Arunachal Pradesh
Construction of major bridge including approaches over Dikrong river at Km 28.750 of NH-713A on EPC mode in the state of Arunachal Pradesh under NH(O).
SLOPE REHABILITATION WORKS (SRW) AT KM 96.000 ON ROAD BALIPARA-CHARDUAR-TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE
Periodic renewal of NH-315 from Km 24.00 to Km 40.00 in the state of Arunachal Padesh on EPC mode uder Annual Renewal Program (ARP) 2019-20.
Periodic repair of Pasighat to Mebo section of NH-13 (old NH-52) from Km. 550.15 to Km. 564.39 in the state of Arunachal Pradesh on EPC mode.
Construction of road from km 87.130 to km 121.541 of Taliha-Tato section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 113.25 to km 160.75 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
EXECUTION OF LAND SLIDE PROTECTION MEASURES BETWEEN KM 81.200 TO KM 84.000 ON ROING HUNLI ROAD UNDER 62 RCC/ 752 BRTF/ (P) UDAYAK IN ARUNACHAL PRADESH STATE THROUGH EPC MODE
Construction of road from km 0.000 to km 35.580 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 130.125 to km 156.095 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 168.000 to km 183.400 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 43.65 to km 85.60 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Periodic repair of Jonai-Pasighat-Raneghat section of NH-515 (old NH-52) from Km. 522.00 to Km. 536.00 (14.00 Km) in the state of Arunachal Pradesh on EPC mode.
Construction of road from km 0.000 to km 43.65 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 85.60 to km 168.00 of Lada-Sarli section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 55.725 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 0.000 to km 78.38 of Sarli-Huri section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 55.725 to km 113.25 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 160.75 to km 209.90 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction improvement of Ditte Dime Migging road Design chainage Km 0.00 to Km 29.936 from Class 9 to NHDL spcn under 105 RCC 761 BRTF P BRAHMANK in the State of Arunachal Pradesh Pkg I under EPC mode
Construction improvement of Ditte Dime Migging road Design chainage Km 29.936 to Km 51.015 from Class 9 to NHDL specification under 105 RCC 761 BRTF P Brahamank in the State of Arunachal PRadesh Pkg II under EPC mode
Strengthening work of NH-215 from Km 0.000 to Km 47.550 of total length 47.550 Km under EPC mode for the year 2023-24 under NH(O) Annual Plan 2023-24
Construction of road from km 70.000 to km 113.000 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Consultancy Services for Authority Engineer for supervision of 2-laning of Longding - Tissa - Khonsa road (NH-215) (Km 0.00 to Km 42.50) on EPC mode in the State of Arunachal Pradesh
Periodical renewal on NH 315 from km 40.000 to km 56.485 (Total length-16.485 km) on EPC mode under Annual Renewal Programme (ARP) 2020-2021 in the state of Arunachal Pradesh.
SLOPE REHABILITATION WORKS (SRW) BETWEEN KM 56.490 TO KM 56.600 ON ROAD ON BALIPARA-CHARDUAR - TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE
CONSTRUCTION OF CONNECTING ROADS TO IMB FENCE (49.00 KM) ALONG INDO-MYANMAR BORDER FROM BP-159 TO BP-162 IN LONGDING AND TIRAP DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
CONSTRUCTION OF CONNECTING ROADS TO IMB FENCE (33.00 KM) ALONG INDO-MYANMAR BORDER FROM BP-164 TO BP-166 IN TIRAP AND CHANGLANG DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE