Loading…
Loading…
173 results • Best match
Construction of road from km 113.00 to km 167.75 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Construction of road from km 19.554 to km 70.000 of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Strengthening of NH-13 from km 632.450 to km. 650.615 (18.165 Km) and protection measures at km 37.850 on NH-315 under Annual Plan for the year 2023-24 under EPC Mode
Work on road section of NH-315A at km 4.03, km 5.60, km 8.50, km 9.260 and km 9.50, km 10.920 and km 11.920 under EPC mode for the year 2023-24
Protection and mitigation of landslide and erosion of road formation from km 10.000 to km 29.500 of Holongi to Itanagar section of NH-415 on EPC mode in the state of Arunachal Pradesh.
EOI invited for association as Joint Venture and Subcontractor from Experienced Agencies for Construction of road packages invited by MORTH in the state of Arunachal Pradesh State on EPC Mode Total 10 Packages
SLOPE STABILIZATION / RESTORATION WORK (SRW) AT KM 0.300 AND KM 9.200 ON BOMDILA BYPASS ROAD UNDER 91 RCC / 14 BRTF OF PROJECT VARTAK IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE OF EXECUTION
EPC MODE FOR LAYOUT, DESIGN, DRAWING AND CONSTRUCTION OF PERMANENT ESTABLISHMENT, ADM BLOCK, OTHER THAN MARRIED ACCOMMODATION AND MARRIED ACCOMMODATION, ALLIED UNITS INCLUDING INTERNAL, EXTERNAL SERVICES AND ARBORICULTURE FOR HQ CE(P) BRAHMANK AT P
Rehabilitation of Siku bridge at km 561.200 on Pasighat-Mebo-Dambuk-Bomjir section of NH-13 (Old NH-52) on EPC mode in the state of Arunachal Pradesh under NH(O) Annual plan 2019-20.
Construction of road from km 0.00 to km 27.430 (Package-1) of Bile- Migging section (Km 0.00 at Bile) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Periodic repair from km 595.000 to km 613.500 (18.50 km) of Pasighat-Bomjir section of NH-13 (Old NH-52) in the state of Arunachal Pradesh on EPC mode under Annual Renewal Program (ARP) 2020-21.
DESIGN AND CONSTRUCTION/IMPROVEMENT OF BALIPARA - CHARDUAR - TAWANG ROAD FROM KM 173.240 TO KM 183.000 (DIRANG BY PASS) TO NH DOUBLE LANE SPECIFICATIONS IN THE STATE OF ARUNACHAL PRADESH (NET LENGTH 13.495 KM) THROUGH EPC MODE
One Time Improvement under Rehabilitation work of the Existing Road stretch from Demwe Km 718.840 to Brahmakund Km 742.400 Section of NH 13 Total Length 23.560 Km in the State of Arunachal Pradesh on EPC Mode
Periodic renewal of Pasighat to Pangin section of NH-13 from km 28.000 to 41.303 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programmme (ARP) 2021-2022.
Periodical renewal of Pasighat-Mebo-Dambuk-Bomjir road (NH 13) from Mebo (km 564.390) to Silluk (km 583.450) (19.06 km) in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2020-2021.
CONSTRUCTION OF ROAD KIBITHU KUNDAO FROM KM 0.000 TO KM 52.000 DESIGN LENGTH 0.000 TO 19.557 KMS GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER PROJECT UDAYAK IN ANJAW DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
EPC Turnkey execution of Heo Hydro Electric Project (240 MW) in Shi Yomi District, Arunachal Pradesh.
Periodic renewal of Pasighat to Pangin section of NH-13 from km 28.000 to km 41.303 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
Construction of road from km 17.812 to km 55.377 (Package-2) of Bile- Migging section (km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
CONSTRUCTION OF ROAD MALINYE-BALUA-KAPUDA FROM KM 0.000 TO KM 56.000 (DESIGN LENGTH 56.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER PROJECT UDAYAK IN UPPER DIBANG VALLEY DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
Periodical renewal of Pasighat to Singer section of NH-513 from km 0.000 to km 19.850 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
Construction of road from km 0.000 to km 17.812 (Package-3) of Bile- Migging section (Km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Periodic renewal of Roin-Koronu-Paya section of NH-13 (old NH-52) from Km 669.80 to Km 682.396 (12.596 Km) in the state of Arunachal Padesh on EPC mode uder Annual Renewal Program (ARP) 2019-20.
EXECUTION OF HILL SLOPE STABILISATION MEASURES FOR SINKING ZONE ON ROAD LGG-MUKTO - TELI BETWEEN KM 7.000 TO KM 8.000 UNDER 90 RCC/42 BRTF/PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH THROUGH EPC MODE OF EXECUTION
Construction of Damteng - Selungthi - Lungar - Chuna Road (Package-2) from Km 7.4 to Km 57.5 to NHSL Specifications (Design Chainage Km 7.45 To Km 56.29 and Length - 48.84 Km) under Project Vartak in Arunachal Pradesh through EPC Mode
RFP for Construction of MSW Plant at Karsingsa Survey Design and Drawing site development work RCC Storm Water Drainage with RCC Slab Cover RCC Protection Wall on EPC Contract mode
Consultancy Services for Preparation of Detailed Project Report (DPR) for Balance Work of Taliha-Tato Road from Km 0.00 to Km 30.00 to NHDL Specifications on EPC Mode under Phase-A of SARDP-NE in the State of Arunachal Pradesh
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 206.66 to Km 247.05 (Package-6) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Widening of existing road to 2 lane with paved shoulder from Hukanjuri to Khonsa section of NH-315A from design chainage Km 0.00 to Km 9.00 (Package-A) on EPC mode in the state of Arunachal Pradesh under NH(O).
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 314.25 to Km 351.383(Package-9) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 77.95 to Km 117.56 (Package-3) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Periodical renewal of Jonai (Ruksin Gate)-Pasighat-Raneghat Road section of NH-515 from km. 536.00 to km. 5550.150 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
Periodical renewal of Jonai (Ruksin Gate)-Pasighat-Raneghat Road section of NH-515 from km. 510.00 to km. 522.00 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 284.92 to Km 314.25 (Package-8)on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 to Km 206.66 (Package 5) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Widening of existing road to 2 lane with paved shoulder from Hukanjuri to Khonsa section of NH-315A from design chainage Km 9.00 to Km 12.24 (Package-B) on EPC mode in the state of Arunachal Pradesh under NH(O).
Widening of existing road to 2 lane with paved shoulder from Hukanjuri to Khonsa section of NH-315A from design chainage Km 26.30 to Km 27.474 (Package-D) on EPC mode in the state of Arunachal Pradesh under NH(O).
CONSTR OF FOOT TRACK INCL EARTHWORK, SURF WKS, ROAD FURNITURE, FOOT SUSPENSION BRIDGES, LOG BRIDGES, STAGING CAMPS AND ROAD PROTECTION WORKS FROM MAGO TO TSELA (NET LENGTH 27.418 KM) THROUGH EPC MODE OF EXECUTION IN THE STATE OF ARUNACHAL PRADESH
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 117.56to Km 163.59 (Package-4) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Constr Imprvt of Along - Yingkiong road between Km 40.00 to Km 65.00 Design Chainage Km 40.000 To 63.740 design length 23.740 Km for Constr and upgradation from Cl09 to NHDL Specn under 761 BRTF Project Brahmank in AP on EPC Mode
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-B, Design chainage from Km 117.560 to Km 247.050) on EPC Mode in the State of Arunachal Pradesh
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-C, Design chainage from Km 247.050 to Km 351.383) on EPC Mode in the State of Arunachal Pradesh
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-A, Design chainage from Km 0.000 to Km 117.560) on EPC Mode in the State of Arunachal Pradesh under Arunach
Consultancy Services for Authority Engineer for Supervision of 4-Laning of Itanagar to Banderdewa section of NH-415 from km 40.430 to km 51.735 (Package-B) and Km 51.700 to Km 59.199 (Package-C) on EPC Mode in the state of Arunachal Pradesh
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 85.657 TO KM 104.53 AND EXISTING CHAINAGE FROM KM 92.25 TO KM 113.65) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 104.53 TO KM 129.31 AND EXISTING CHAINAGE FROM KM 113.65 TO KM 142.0) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 129.31 TO KM 152.81 AND EXISTING CHAINAGE FROM KM 142.02 TO KM 167.1) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
construction of connecting road (24.00 km) to imb fence at bp-167 and connecting road (23.00 km) to IMB fence at BP -168 along indo-myanmar border from BP-166 to BP-168 in changlang district of arunachal pradesh state on EPC mode
Execution of rock fall protection/stabilization works for treatment of fractured hard rock near Shere Thapa bridge between Km 0.630 to Km 0.730 on road TCC Maza sector I under 128 RCC OF 23 BRTF/Project Arunank in Aunachal Pradesh EPC Mode
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 152.81 TO KM 173.34 AND EXISTING CHAINAGE FROM KM 167.10 TO KM 189.1) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE