Loading…
Loading…
406 results • Best match
Construction of Phase-III of Bhagat Phool Singh Govt. Medical College for Women, at Khanpur Kalan, Sonepat, Haryana on Design, Engineering, Procurement & Construction (EPC) basis
Hiring of Consultancy Services - Percentage based - COMPREHENSIVE ARCHITECTURAL AND ENGINEERING CONSULTANCY SERVICES FOR CONSTRUCTION OF ELEVEN POLICE INFRASTRUCTURE WORKS ON EPC MODE UNDER J&K POLICE HEADQUARTERS, SRINAGAR; DPR, RFP Preparation & Bid..
Micro-Irrigation Schemes in the command of the existing canal outlets of various distributaries at Km 11.300 R of Nolpur Disty. of Village Dhani Bhatota of District Mahendergarh EPC Mode
Construction of 6 Lane VUP at Km. 264.237 along with service road in Village Kherika on Hisar - Dabwali section of NH-09 in the State of Haryana on EPC mode
Construction of 04 no. of Additional Structures on six lane Gurgaon-Jaipur section of NH-48 between km 42.700 to km 107.100 in the State of Haryana on EPC Mode
Development of India International Horticulture Market IIHM at Ganaur District Sonepat Haryana including Civil Works Development of Area and all other related services complete in all respect on EPC mode.
RCE for the construction of Flyover along Railway Road from Khalsa Chowk to Haryana Nursing Home at Karnal and Valmiki Chow to Ambedkar Chowk under Karnal Smart City Mision through Engineering, Procurement and Construction (EPC) Contract in the Stat
Construction of Vehicular Under Pass on NH-709 (Extn.) at Km.90.400 crossing Meham-Beri road (Near College Mor Kalanaur) in Rohtak District in the State of Haryana on EPC mode.
Work of Sohna Realignment of Rewari Sohna Palwal road NH-919 (Old NH-71B) from km 47.100 to 49.350 in Sohna Hilly Portion on EPC mode in the State of Haryana.
Construction of Foot Over Bridges in Gurgaon Kotputli Jaipur section of NH8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode
Construction of Vehicular Underpass (VUP) (6-Lane) 1 No on Hisar-Dabwali section of old NH-10 (new NH-09 at Chainage-218.276 in the State of Haryana on EPC Mode
Four Laning of the Project Highway from End of Pinjore bypass Baddi Nalagarh Section Km 4.200 to 35.395 of NH21A New NH105 in Haryana and Himachal Pradesh on the EPC Mode
Widening to 2Lane with paved shoulder from Km 197.270 to Km225.610 and KM241.500 to KM243.300 of NH148B Surewala chowk to Haryana Punjab Border in the state of Haryana on EPC Mode
Work of Strengthening of road from km 24.50 to km 46.95 including improvement of service road in Sohna and Nuh city of NH-248A in the State of Haryana on EPC mode.
Micro-Irrigation Schemes in the command of the existing canal outlets of various distributaries at Km 2.900 TR of Meghot Mr. of Village Bighopur, Dholera and Khawajpur of District Mahendergarh. EPC Mode
Work of Strengthening of road from km 47.100 to km 49.350 and from km 64.00 to km 78.940 of NH-71B) (New NH-919) in the State of Haryana on EPC mode.
Construction of Foot Over Bridges on Km21.500(Design Ch21.500 PKGI) Km29.500(Design Ch29.500 PKGI) on NH148B and Km17.500(Design Ch3.100 PKGIII) Km58.600(Design Ch44.200 PKGII) on NH11 in Haryana on EPC mode.
Construction of 5 Nos. VUPs and Service Road (km 60.300 to km 66.790, BHS) on Delhi-Haryana Border to Rohtak Section on NH-09 in the State of Haryana on EPC Mode.
Construction of VUP at Km 51.300 (Baghola) of Delhi-Agra Section from Km 20.500 to 200.000 of National Highway No.2 (New NH-19) in the state of Haryana on EPC mode.
EPC CONTRACT FOR DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF SEWAGE TREATMENT PLANT (10 KLD) AND EFFLUENT TREATMENT PLANT (35 KLD) FOR ARMOUR UNITAT IMT ROHTAK
Engagement of user fee agency on the basis of EQ through etender for 8Lane Delhi Vadodara Expressway from km 0.000 to km228.748 on NH No. NE4 in Haryana and Rajasthan on EPC Mode
Upgradation of NH-703 (Newly NH declared) Sirsa to Sardulgarh road upto Punjab Border from Km. 21.50 to 25.13 ( Road ID 5795) in Sirsa Distt. in the state of Haryana on EPC Mode.
Planning design and Construction of Income Tax Office Building at Sector 29 Gurugram Haryana including all Civil and MEP services Horticulture and Development works on EPC basis
4 Laning of Jagadhri Tajewala road section from Yamunanagar bypass Design Ch. 0.223 to Tajewala Design Ch. 32.300 of NH-907 under NH(O) (Design length 32.523 km)(Pkg1) in Haryana on EPC Mode
Construction of Foot Over Bridges with Lift facility at 04 Nos of locations between Km 107.100 to Km 268.300 on Gurgaon Kotputli Jaipur section of NH 48 in state of Rajasthan on EPC Mode
Construction of 4 lane LVUP at Dhakoli Junction (on Zirakpur Parwanoo road) at Km 39.784 on Ambala-Chandigarh section of old NH-22 (New NH-152) in the State of Punjab on EPC mode
Construction of LVUP Design Ch.117.920, LVUP and other related works on Panipat-Jalandhar section of old NH-1 (new NH 44) from Km 96.000 to 387.100 in the State of Haryana on EPC Mode
Work of Strengthening of Rewari-Sohna-Palwal National Highway NH-919 (Old NH-71B) from km 4.7 to km 13.5 and from km 49.350 to km 64 in the State of Haryana on EPC mode.
Construction of Additional Structures Improvement of Service Road and Maintenance of Six Lane Gurgaon-Jaipur Section of NH48 (old NH-8) between km 42.700 to km 107.100 in the States of Haryana on EPC Mode.
Construction of 6 lane VUPs at Km. 96.570 (Madina Bypass) and Km. 106.445 (Behlba) with slip roads on both sides on Rohtak - Hisar Section of NH-9 in the State of Haryana on EPC Mode
Planning, Design, Supply, Installation, Testing, Commissioning and Operation and Maintenance for 3 Years including three years free maintenance of on farm Micro Irrigation System EPC mode under Hybrid Annuity based Model HAM 4 Nos. outlet RD
Construction of H.L. bridge on Kaushalaya River and 45m wide Periphery road from NH-22 (now 05) to circular road of Sector 3, 4 and 5, Pinjore Kalka Urban Complex, Panchkula in Haryana on EPC mode.
Engagement of user fee agency on the basis of EQ through etender for 8 Lane Delhi-Vadodara Expressway from km 0.000 to km 228.748 on National Highway No. NE 4 Haryana and Rajasthan on EPC Mode
Construction of 6-lane VUP at Km 94.909 including construction of New Service Road on Kaithal to Rajasthan /Haryana Border section of old NH-65 (new NH-152) in the state of Haryana on EPC mode.
EPC Contract as per the Tender Specifications for EPC Package for 1700 KWp Ground Mounted Grid Connected Solar Power Plant
Upgradation of 2/4 Lane with Paved Shoulders of Hansi Barwala road section of NH-148B (Existing Km 170.668 to km. 194.938 (Design length 24.27 km)) on EPC mode in the State of Haryana under NH (O).
Const. of Double loop dumbbell Interchange at the Junc. of NH52 HR n RJ Border Barwala and NH9 Delhi Sirsa at Dhandhoor in Haryana as part of Amritsar Kolkata Industrial Corridor under NH O on EPC mode
Construction of 6 lane VUP at Km. 133.200 and 6 lane LVUP at Km. 133.547 along with service road in Village Sorkhi on Rohtak-Hisar Section of NH-9 in the State of Haryana on EPC mode.
RFP for the Selection of System Integrator for Design Supply Installation Testing Commissioning and Operation and Maintenance of ATMS on Dwarka Expressway (NH248BB) and existing Delhi Gurgaon sec of NH48 as one Combined Loop on EPC mode
Construction of 4 lane VUP at Bhankarpur junction at Km 33.275 on Ambala-Chandigarh section of Old NH-22 (New NH-152) in the State of Punjab on EPC basis
Planning Design and Construction of 214 Nos. Residential Quarters for Income Tax Department at Sector 53 Gurugram including all Civil and MEP services horticulture and development works on EPC basis
Planning, Design, Supply, Installation, Testing, Commissioning and Operation and Maintenance for 3 Years including three years free maintenance of on-farm Micro irrigation System EPC mode under Hybrid Annuity based Model HAM at 5945 L New Siwana Ma
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Engagement of Safety CS during O and M of 6L Access Controlled GFH NH152D starting from Ismailabad(Gangheri) on NH152D to Narnual(0.000 to 227.20 L-227.20Km) for Pkg1 to Pkg8 on EPC mode under BMP in Haryana.
Development of Memmadpur (Ambala) - Banur (IT City Chowk) - Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana-Shamli-Muzaffarnagar Miranpur Bijnor at Kotawali to two-four lane in the State of UP on EPC Mode Pkg-IV (Bijnor to Kotawali NH-709AD)
Upgradation of existing 4lane Ismailabad-Ambala section of NH152(Km0.000 to Km42.500) (Part of Ambala-Kotputli Corridor) to 4lane access controlled stretch by providing grade separated structures and service roads under BMP-I in Haryana on EPC Mode.
COMPOSITE WORKS FOR CONSTRUCTION OF STUDENT DINING HALL - 3 AND 4, TYPE-II HOUSING BLOCK, BOYS HOSTEL AND VISITORS HOSTEL FORIIT-JODHPUR AT KARWAR, JODHPUR ON EPC BASIS
Construction of Six Laning grade separated structure at Sangteda, at Manpura Machedi and Lakher and white topping of service road at 05nos. locations on Gurgaon Kotputli Jaipur section of NH 48 in the state of Rajasthan on EPC Mode
4 Lane with PavedShoulder for Ambala-Saha Section from Km.0.000 to Km.14.800 of NH-444A intheState of Haryana Package1 Under Bharatmala Pariyojana on EPC Mode Undertaking rectification works at the riskandcost of the Contractor at various location