Loading…
Loading…
406 results • Best match
Consultancy Services for AE(i)Improvement and Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana (ii)Highway starting from configuration-Shamli to Muzaffarnagar pkg-II in UP under NHDP Phase-VII on EPC Mode
Construction of Minor Bridges on MCW and SR at Km.115.830, FOB and Approach Road etc. from Km 115.300 to 116.300 on Panipat-Jalandhar section of NH-1 (new NH-44) in the State of Haryana on EPC mode
Complete Planning Designing Execution construction of buildings and Estate services Furniture Equipments IT Networking Commissioning including Maintenance during defect liability period etc Under EPC Contract Mode as per scope of work
Preparation of DPR, Drawings, Revised Detailed Estimate with BOQ, DNIT, Bid documents for inviting bids on EPC Mode for construction of H.L. Steel Bridge on Kaushalya River at periphery road (RD 630m) approaching peripheral road of Sector 3, 4 and 5
CONSTRUCTION OF H.L. BRIDGE ADJACENT TO EXISTING BRIDGE ON GHAGGAR RIVER FOR THE ROAD CONNECTING DIVIDING ROAD OF SECTOR-3 AND SECTOR 21 WITH SECTOR 23 AND SECTOR 25 NEAR PANCHKULA GOLF CLUB IN THE STATE OF HARYANA (EPC Mode)
CS for AE for Supervision of Development of Memmadpur Ambala Banur IT City Chowk Kharar Chandigarh Corridor under BMP Pkg-II 6 laning of IT City Chowk to Kurali Chandigarh Road Design length 31.23 Km in Punjab on EPC mode
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF 6-lane Urban Extension Road UER 2 NH 344 M From NH 1 to Karala-Kanjhawala Road Km -0.700 to 15.000 of NH-352A at Village Barwasani Sonipat in Haryana ON EPC Mode
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF FOUR LANING OF PINJORE (END OF PINJORE BYPASS)-NALLAGARH SECTION (KM 4.200 TO 35.395) ON NH-105 (OLD NH-21A) IN HARYANA AND HIMACHAL PRADESH ON EPC MODE UNDER BMP
Consultancy Services for AE for Construction of Additional Structures Improvement of Service Road and Maintenance of Six Lane Gurgaon-Jaipur Section of NH-48 (old NH-8) between km 42.700 to km 107.100 in the States of Haryana on EPC Mode
Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode
Strengthening and Improvement of existing 2 and 4 lane with paved shoulder Jind-Karnal Section of NH-709A from Design km. 68.857 to Design 82.227 in the state of Haryana on EPC basis.
Design, Supply, Installation, Testing and Commissioning DSITC of Live Bio therapeutics Laboratory and Monoclonal Antibodies Research Facilities on EPC Basis under QCBS Quality and Cost-Based Selection Mode at THSTI, NCR Biotech Science Cluster,
Construction of MSME Technology Centre at Ambala (Haryana) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 year during DLP Period
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Ranipur Barsi Saharanpur district to Sadopur Ambala district Ch.45.500-121.786 of Shamli Ambala section in Haryana on EPC Mode (PKG-II)
Engagement of user fee agency through E-Tender at Saini Majra Fee Plaza at km 28.160 from km 0.000 to km 50.860 on Ambala-Kaithal Section (Pkg.I) of NH-65 under NHDP Phase-III on EPC mode in the state of Haryana
Construction Widening of Structures i.e MJB MNB ROBs LVUP etc rectification of drainage and rain cuts and other works on Panipat Jalandhar sec of old NH1(new NH44)from Km96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode.
Construction and Site for Improvement of existing 4 Lane National Highway Old NH22 (New NH-5) on Zirakpur Parwanoo section from Km 42.350 to Km 43.850 including 2nos.VUP at Km 43.051 and Km 43.286 in the State of Haryana on EPC Mode
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli Ambala section in Uttar Pradesh on EPC Mode (Package-I)
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF 6-lane Urban Extension Road UER 2 NH 344 M From Karala-Kanjhawala Road, Km 150.000 to Dwarka Sector 24 Road, Km 38.111 till Bahadurgarh bypass of NH-10 near Bahadurgarh in Haryana ON EPC Mode
Construction of 6 lane VUP at Km 168.535 including construction of New Service Road, Exit and Entry, drain and Highway Lighting on Rectification of black spot at Hisar Cantt. Location From 167.810 to 169.445 in the state of Haryana on EPC Mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana Shamli Muzaffarnagar Miranpur Bijnor and terminating at its junction with NH-74 at Kotawali to 2-4 lane configuration in State of UP on EPC Mode Pkg-III NH-709AD
Providing services of Computer operator, MTS, security guard, etc in office of EE and SM, Faridabad Project div. Ch to contingencies of work o co separate family accommodation for SSB at Faridabad on EPC basis.
Engagement of Third Party Inspection and Monitoring agency emapnelled with Qaulity Assurance Authority QAA Haryana for Construction of Unity Mall on EPC basis and other infrastructure development works at Sector 37 HSIIDC Industrial Estate Karnal
CS for AE for Supervision of 4 laning of Jagadhri Tajewala road sec from Yamunanagar bypass (Design Ch.0.223) to Tajewala (Design Ch.32.300) of NH 907(Old NH 73A) under NH(O) (Design length 32.523 km)(Pkg 1) in Haryana on EPC Mode
Engagement of user fee collection agency on the basis of competitive bidding through for Peont Fee Plaza on Jind-Karnal section i.e. junction with Narwana road at Subhash Chowk and ends at ITI Chowk of NH-709A on EPC mode in the State of Haryana
Providing services of computer operator, MTS, Security guard, etc. in Office of Faridabad Project Division. Ch to: Contingencies of work of C/o separated family accommodation (Phase-I) on EPC basis for SSB at Faridabad Subwork/Packages: 01a
Supply, Installation and Provisioning of Pneumatic Aluminium Piping network system for Compressed Air for Main workshop Area ON TURN KEY BASIS
Authority Engineer for Supervision of balance Work for Four Laning of Rohtak Jind Section from Km 307.000 to Km 347.800 of NH71 and connecting link from Km 347.800 of NH71 to Km 9.400 of NH71A on EPC Mode under Bharatmala(left out in NHDP)in Haryana
Construction of 4 Lane VUP at Km 34.420, Flyover at Km 35.940 and 2 nos. FOB at Km 34.890 and Km 37.045 on Ambala-Chandigarh section of NH-22 (New NH-152) from Km 33.800 to Km 37.100 in the State of Punjab on EPC mode
Construction of 6 lane NH-344N Pkg 5 from Km 0.000 to 7.269 7.3km starting from NH 344 M Delhi at Km 26.135 of NH-344M or UER-II till Bahadurgarh bypass of NH-10 near Bahadurgarh in Haryana as spur of NH-344M on EPC mode
4/6 Lane of Yamunanagar-Saha- Barwala-Panchkula Section of NH73 from Km.70.830 to Km.115.400-Treatment of 2 Nos. of Potential Blackspot locations-1. Karera Khurd, at km.78.520 and 2. Thana Chapper, at km.101.228 in the State of Haryana on EPC Mode
New Construction of Damaged Major Bridge RCC T-Beam bridge and its approaches at Ch. 147.547 (LHS) on Yamuna Nagar-Saha- Barwala-Panchkula section of NH-73 (New NH-344) from Km. 115.400 to km. 157.192 (Package-2) in the State of Haryana on EPC Mode
Construction of 4 lane NH-344P Pkg 4 from Km 0.000 to 29.600 29.6 km starting from Bawana Industrial Area Delhi at Km 7.750 of NH-344M till Sonipat bypass of NH-352A at Village Barwasani Sonipat in Haryana as spur of NH-344M on EPC mode
RFP For Appointment of Safety Consultants for Under Construction Projects i.e. 4L of Solan-Kaithlighat Km 106.139 to Km 129.050 of NH-05 in HP, 4L of End of Pinjore bypass-Nalagarh Km 4.200 to km 35.397 of NH-105 in Haryana and HP on EPC Mode.
construction of 3lane new rob including widening, construction of vup and ramps at lhs rhs and merging of alignment with pap flyover on panipat jalandhar section of nh44 (old nh01) in the state of punjab on epc basis
Construction of 4 Lane LVUP at Sector-26 Panchkula Junction at Km. 170.335 of Yamunanagar - Panchkula Section of Old NH-73 (New NH-07) from Km. 169.700 to Km. 170.950 on EPC basis in the State of Haryana
Rehabilitation and upgradation for 4Lanning of Saha to Sahabad Section from Km. 14.840 to Km 31.760 of NH444A including Saha Southern Bypass connecting NH73 to NH444A (Total Length-21.05 km) under Bharatmala Pariyojna in Haryana on EPC Basis
Construction of 6 Lane LVUP for rectification of Black Spot (MORTH ID HR-(02)-022) at km. 422.114 of NH-352 (old NH-71) (Palhawas Chowk) on Rohtak-Bawal section on EPC basis in the State of Haryana
Smart Entrance System with Body Temperature and Mask Detection solution on Face and Palm Verification for Building Entrance on Turn Key basis
4 laning of Hisar to Dabwali Sec of NH-10 from Km 170.000 to Km 227.000 with paved shoulder in the State of Haryana on EPC Mode. Pkg-I-Construction of service road from Km. 217.900 to Km 218.300 BHS at Hanspur Chowk on Fatehabad bypass 2nd Call
Special repair of Bed Protection work of Major Bridge on Ghaggar River at Ch.175.854 On Yamunanagar-Panchkula section of old NH-73 (New NH-07) from Km. 157.192 to km.176.400 on EPC mode under NHDP Phase-III in the State of Haryana (Pkg-3) (2nd Call)
Consultancy Services for conducting Third Party Road Safety Audit of the project Rehabilitation and up-gradation of existing 2 lane with paved shoulder of Jhajjar-Loharu Section (Length-97.864 Km) of NH334B in the State of Haryana on EPC basis
Authoritys Engineer for Supervision of Rehabilitation and upgradation for 4-Lanning of Saha to Sahabad Section from Km.14.840 to Km 31.760 of NH-444A (Total Length-16.920 km) under Bharatmala Pariyojna in the State of Haryana on EPC Basis
Construction of 4 lane Flyover for Rectification of Black Spot at Km. 75.770 (Dahar Chowk) and Construction of FOB at Km 75.087 of NH-709 (Old NH-71A) on Rohtak-Panipat Section on EPC basis in the State of Haryana.
Micro-Irrigation Schemes in the command of 6.850 L of Nolpur Disty. EPC Mode
Providing and Fixing of Fixtures and Gas Distribution System for Academic Block-II at Chaudhary Ranbir Singh University, Jind on Turn-Key Basis.
CONSTRUCTION OF GURU RAVIDAS BHAWAN AND MUSEUM AT KURUKSHETRA, HARYANA ON DESIGN ENGINEERING PROCUREMENT AND CONSTRUCTION EPIC BASIS AS DEPOSIT WORK OF ARCHAEOLOGY AND MUSEUMS DEPTT HARYANA
Design, Construction, testing and Commissioning of office building with data centre (Uptime Institute Tier-IV Certified) for Punjab National Bank at Plot No 84, Sector 18, Gurugram, Haryana including all Civil and MEP services, horticulture and ... on EPC basis . ...
Four laning of Ambala-Kaithal section of NH-152 from Km 0.000 to Km. 50.860 in the State of Haryana under NHDP Phase-III on EPC basis (Package-1) Rectification works at the risk and cost of the Contractor at various locations.
Providing laying of Optical Fiber Cable from km 0.000-km 59.100 of DND-Faridabad bypass KMP and km 0.000-km 31.100 of GFC to Jewar IA from DND-FBD-Ballabhgarh Bypass KMP Link and km 0.000-km 697.220 of DVE on EPC mode in Delhi UP HR Raj. and MP PKG-I