Loading…
Loading…
1,499 results • Best match
Cons. of GPT 300x125mmx 60 mtr av. Depth complete (By Mech. rotary RigMach with mud pump mounted on Truck) with install of IM-II HP drain platform under D.W. and Div.JMT for 2023-24 on Turnkey Basis (Grp No. KOD/GPT/60MTR/13-50 Nos)
Detailed Survey Designing and Drawing Const of 200 Nos FHTC in Gidhour Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No GID SVS SUB CLTR 34B
Construction for deep tube well of 125mm x 115mm dia x 90 mtrs. Extra Deep drilled tube well complete etc. work in Garhwa district for the year 2020-21 on turnkey basis under D.W.and S. Division Garhwa (Group No-GAR/EX/DT-05) 90 Nos.
Detailed Survey Designing and Drawing Const of 317 Nos FHTC in Hunterganj Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No HNT SVS SUB CLTR 13B
Detailed Survey Designing and Drawing Const of 184 Nos FHTC in Hunterganj Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No HNT SVS SUB CLTR 13C
Construction of Intake Well Gang WTP ESR Staff Quarter, Com wall, AP Raw and Clear Water RM and Distribution Five years OM with allied works etc. all complete job for Rajabar and Adjoining villages RPWSS under D.W. and S. Div. JMT on turnkey basis
Construction of Intake Well Gang WTP ESR Staff Quarter, Raw and Clear Water RM and Distribution Five years OM with allied works etc. all complete job for Satdiha Phase-1 and 2 and Adjoin villages RPWSS under D.W. and S. Div. JMT on turnkey basis
Construction of Intake Well Gang WTP ESR Staff Quarter, Com wall, Raw and Clear Water RM and Distribution Five years OM with allied works etc. all complete job for Markacho Multi Village RPWSS under D.W. and S. Div.JMT on turnkey basis for 2021-22
Detailed Survey Designing and Drawing Const of 51483 Nos FHTC in Different Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No. SMR SVS CLTR 02 B-3
Detailed Survey Designing and Drawing Const of 51483 Nos FHTC in Different Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No. SMR SVS CLTR 02 A-3
Detailed Survey Designing and Drawing Const of 51483 Nos FHTC in Different Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No. CTR SVS CLTR 06 A-2
Detailed Survey Designing and Drawing Const of 223 Nos FHTC in Kanhachatti Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No KNC SVS SUB CLTR 41
Detailed Survey Designing and Drawing Const of 6139 Nos FHTC in different block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No SMR SVS CLTR 02 A3
Detailed Survey Designing and Drawing Const of 3378 Nos FHTC in different block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No KND SVS CLTR 04 B
Detailed Survey Designing and Drawing Const of 3378 Nos FHTC in different block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No SMR SVS CLTR 02 A2
Detailed Survey Designing and Drawing Const of 1749 Nos FHTC in Simariya Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No SMR SVS CLTR 02 B2
Detailed Survey Designing and Drawing Const of 2237 Nos FHTC in Pratappur Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No PTP SVS CLTR 03 B
Detailed Survey Designing and Drawing Const of 18826 Nos FHTC in Different Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No. SMR SVS CLTR 02 B1
Detailed Survey Designing and Drawing Const of 1593 Nos FHTC in Pratappur Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No PTP SVS CLTR21 2nd Call
Detailed Survey Designing and Drawing Const of 1923 Nos FHTC in Hunterganj Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No HNT SVS CLTR13A 2nd Cal
Detailed Survey Designing and Drawing Const of 1637 Nos FHTC in Hunterganj Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No HNT SVS CLTR17 2nd Call
Detailed Survey Designing and Drawing Const of 18826 Nos FHTC in Different Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No. SMR SVS CLTR 02 A1
Detailed Survey Designing and Drawing Const of 51483 Nos FHTC in Different Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No. CTR SVS CLTR 06 B-2
Detailed Survey Designing and Drawing Const of 2202 Nos FHTC in Kunda Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No SMR SVS CLTR 04 C
Detailed Survey Designing and Drawing Const of 6139 Nos FHTC in different block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No SMR SVS CLTR 02 B3
Detailed Survey Designing and Drawing Const of 2354 Nos FHTC in Lawalong Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No LAW SVS CLTR40 2nd Call
Detailed Survey Designing and Drawing Const of 1501 Nos FHTC in Hunterganj Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No HNT SVS CLTR32 2nd Call
Detailed Survey Designing and Drawing Const of 1593 Nos FHTC in Kunda Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No KND SVS CLTR38 2nd Call
Detailed Survey Designing and Drawing Const of 1385 Nos FHTC in Pratappur Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No PTP SVS CLTR20 2nd Call
Detailed Survey Designing and Drawing Const of 1257 Nos FHTC in Hunterganj Block of Chatra District Comprising of Suitable RCC Frame Structure ESR Distribution Lines Source as required and 05 Yrs O and M On TurnKey Basis Gr No HNT SVS CLTR16 2nd Call
Relocation of 125x115mm dia and 90 Mtr. deep drilled tube well with installation of IM-II Hand pump. 1.85m dia PCC platform and 3.0m long drain on turnkey basis in different rural habitation under D.W. and S. Division, Jamshedpur for the FY- 2026-27
Relocation of 125x115mm dia and 70 Mtr. deep drilled tube well with installation of IM-II Hand pump. 1.85m dia PCC platform and 3.0m long drain on turnkey basis in different rural habitation under D.W. and S. Division, Jamshedpur for the FY- 2026-27.
Relocation of 125x115mm dia and 70 Mtr. deep drilled tube well with installation of IM-II Hand pump. 1.85m dia PCC platform and 3.0m long drain on turnkey basis in different rural habitation under D.W. and S. Division, Jamshedpur for the FY- 2026-27.
Relocation of 125x115mm dia and 90 Mtr. deep drilled tube well with installation of IM-II Hand pump. 1.85m dia PCC platform and 3.0m long drain on turnkey basis in different rural habitation under D.W. and S. Division, Jamshedpur for the FY- 2026-27
Relocation of 125x115mm dia and 70 Mtr. deep drilled tube well with installation of IM-II Hand pump. 1.85m dia PCC platform and 3.0m long drain on turnkey basis in different rural habitation under D.W. and S. Division, Jamshedpur for the FY- 2026-27
Relocation of 125x115mm dia and 90 Mtr. deep drilled tube well with installation of IM-II Hand pump. 1.85m dia PCC platform and 3.0m long drain on turnkey basis in different rural habitation under D.W. and S. Division, Jamshedpur for the FY- 2026-27
Relocation of 125x115mm dia and 90 Mtr. deep drilled tube well with installation of IM-II Hand pump. 1.85m dia PCC platform and 3.0m long drain on turnkey basis in different rural habitation under D.W. and S. Division, Jamshedpur for the FY- 2026-27
Relocation of 125x115mm dia and 90/70Mtr deep drilled tube well with installation of IM-II Hand Pump, 1.85m dia PCC Platform and 3.0m Long drain on turnkey basis in different rural habitation under DW and S Division, Adityapur for the Year 2026-27
Relocation of 125x115mm dia and 90/70Mtr deep drilled tube well with installation of IM-II Hand Pump, 1.85m dia PCC Platform and 3.0m Long drain on turnkey basis in different rural habitation under DW and S Division, Adityapur for the Year 2026-27
Relocation of 125x115mm dia and 90/70Mtr deep drilled tube well with installation of IM-II Hand Pump, 1.85m dia PCC Platform and 3.0m Long drain on turnkey basis in different rural habitation under DW and S Division, Adityapur for the Year 2026-27
Changing of 32mm dia GI Rotten Riser Pipe Connecting Rod CI Cylinder etc all complete job in Rural Areas under DW and S Division Latehar on turnkey basis for the year 2026-27 Group No - Bariyatu and Herhanj RRP-4 80 Nos 1st Call
Relocation of Defunct T/W of 125mm dia and 40 mtrs Deep Gravel packed tube well with Installation of India Mark-II hand pump in the rural areas of Godda District under state plan head for the year 2024-25 under D W and S Division, Godda on turn key
Relocation of Defunct T/W of 125mm dia and 40 mtrs Deep Gravel packed tube well with Installation of India Mark-II hand pump in the rural areas of Godda District under state plan head for the year 2024-25 under D W And S Division, Godda on turn key b
Construction of 125/115 mm dia with 70 mtrs deep drilled tube well with installation of IM-II Hand pump on turnkey basic in different Block in Palamau district for the year 2023-24 under D.W. and S. Division, Medininagar. (Group No-MED/DT/70mtr.-04)
CHANGING OF ROTTEN RISER PIPE IN I M II DRILLED TUBE WELL WITH 32 MM MEDIUM CLASS G I RISER PIPE AND CONNECTING ROD FOR DRILLED TUBE WELL IN DIFFERENT BLOCKS OF CHATRA DISTRICT ON TURNKEY BASIS FOR THE YEAR 2024-25 GR CTR RRP 01
Construction of 125/115 mm dia with 70 mtrs deep drilled tube well with installation of IM-II Hand pump on turnkey basic in different Block in Palamau district for the year 2023-24 under D.W. and S. Division, Medininagar. (Group No-MED/DT/70mtr.-03
Construction of 02 Nos of new 33 kV Bay with bus extension on both side and required material for the restoration of existing 33 kV Bay as well as replacement of existing single bus bar with double moose main bus bar at GSS Deoghar on turnkey basis
CHANGING OF ROTTEN RISER PIPE IN I M II DRILLED TUBE WELL WITH 32 MM MEDIUM CLASS G I RISER PIPE AND CONNECTING ROD FOR DRILLED TUBE WELL IN DIFFERENT BLOCKS OF CHATRA DISTRICT ON TURNKEY BASIS FOR THE YEAR 2024-25 GR CTR RRP 04
Construction of 125/115 mm dia with 70 mtrs deep drilled tube well with installation of IM-II Hand pump on turnkey basic in different Block in Palamau district for the year 2023-24 under D.W. and S. Division, Medininagar. (Group No-MED/DT/70mtr.-02)
Upgradation of40 MT LW B in to 60 MT by way of SITC of 60 MT fully electronic computerized LWB on turnkey basis at FSD Dhanbad, along with shifting of existing working 40 MT ELWB structure and accessories to the location of non-working 40 MT LWB.