124 live68 closing this weekmost from Karnataka Power Transmission Corporation Limited and Gulbarga Electricity Supply Company Limited
124 results • Best match
Construction of 110KV LILO Line to 110KV Ganadal Sub-Station by utilizing 110KV DC towers from the tapping point of existing 110KV Kushtagi-Kanakagiri Line for a distance of 1.62Kms along with construction of 1 No of Terminal bay at 110kV Ganadal ... total turnkey basis, ...
Construction of 66kV SC link line on 110kV NB DC towers with Panther conductor for a distance of 11.070kms from 66/11kV Badanaguppe sub-station to 66/11kV Jannur Sub-station and construction of 1 no. of 66kV Terminal Bay at 66/11kV Badanaguppe ... Total Turnkey basis ...
Improvement work
Improvement Work
Establishing 2x20MVA, 110/11kV Sub-station at Masuti in Kolhar Taluk, Vijayapur District, Construction of 110kV LILO line from ongoing 110kV Telagi LILO line (110kV B.Bagewadi-Telagi-Mamdapur line) for a distance of 0.906km using Lynx conductor in ... District,onPartial Turnkey basis ...
Reactive Power Compensation at 11kv Feeder Level by installing Capacitor Units in Chitradurga & Hiriyur Divisions of BESCOM
CONSTRUCTION OF 96 PC QUARTERS (24 PC AT HEBBAL IN MYSORE CITY, 12 PC AT JYOTHI NAGAR-2 IN MYSORE DISTRICT, 24 PC AT MADDURU IN MANDYA DISTRICT, 12 PC AT KUSHALANAGAR IN KODAGU DICTRICT, 12 PC AT BELURU AND 12 PC AT ARASIKERE IN HASSAN DISTRICT) AT ... LUMPSUM TURNKEY BASIS ...
Improvement work
Establishing 2x20MVA, 66/11kV Sub-station at Sasvihalli Village in Harapanagalli Taluk, Vijayanagara District, Construction of 02 Nos. of 66kV Terminal Bays at existing 66/11kV Bennihalli Sub-station in Harapanagalli Taluk, Vijayanagara District and ... Partial Turnkey basis ...
CONSTRUCTION OF 120 PC QUARTERS (12 PC QTRS AT BETAGERE IN GADAG DISTRICT, 24 PC QTRS AT VIJAYAPURA IN VIJAYAPURA DISTRICT, 24 PC QTRS AT TALIKOTE IN VIJAYAPURA DISTRICT, 12 PC QTRS AT MANAGULI (BASAVANABAGEWADI) IN VIJAYAPURA DISTRICT, 24 PC QTRS AT ... LUMPSUM, TURNKEY BASIS ...
Establishing 2X20 MVA, 66/11kV Sub-Station at Neralekere in Magadi taluk, Bengaluru South district and Construction of 66kV DC Line on DC towers from existing 220/66kV Anchepalya sub-station to the proposed 66/11kV Neralekere sub-station for a ... Partial Turnkey Basis ...
Repairs /Rectification of faults in the HT/LT Under Ground Cable in BRAZ area of BESCOM
Survey, Investigation, Preparation of Design & Drawings, Installation, Testing and commissioning of Lift Irrigation Scheme consisting Intake Canal, Jackwell Cum Pump House, Pumping Machinery, Rising Main, Bleeders and Manifolds, Pipe Distribution ... on Turnkey Basis
ESTABLISHMENT AND COMMISSIONING OF 3.00 MLD CAPACITY TERTIARY SEWAGE TREATMENT PLANT AT KSIIDC BENGALURU SIGNATURE BUSINESS PARK (BSBP) NEAR DEVANAHALLI, BENGALURU ON TURNKEY BASIS INCLUDING OPERATION AND MAINTAINANCE OF THE TREATMENT PLANT FOR A PERIOD OF 5 YEARS
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Tank Filling Scheme Head Works consisting of construction of forebay, Jack well cum pump house, Vertical Turbine Pumps coupled to Motors, Pump house electrical works, ... on Turn -Key ... Turn- Key Basis
Providing Marketing and Pre-Booking Sales Services for the Construction of 3 BHK and 2 BHK Housing Project at Sy. No. 73,76 and 2 of Kenchnapura Village in NPKL Layout on Lump Sum Turnkey Basis based on Tenderers Own Design under Two Cover System
Providing Marketing and Pre-Booking Sales Services for the Construction of 4 BHK and 3 BHK Housing Project in Sy. No. 8/2 of Kalathammanahalli Village & Sy.No.46,47/1,47/2,47/3,47/4 & 48 of Byalakere village,Hesarghatta Hobli, Yelahanka taluk in DSKL ... Sum Turnkey Basis ...
Replacement of age old 66kV Pneumatic Circuit Breaker and C&R Panel of 66KV Capacitor Bank at 220KV R/S Hoody. pertaining to Tr (Op) Circle-South, Bengaluru on Total Turnkey basis including supply of all matching materials/equipment including supply of 66kV Breakers and erection (including civil works) of all materials/ equipment, testing and commissioning- on percentage basis
Repairs of 25 Nos. faulty 5 MVA, 33/11 KV Power Transformers of various makes available at various 33/11 kV Sub-stations in GESCOM jurisdiction including transportation from site to repair bay and from repair bay to site as decided by GESCOM along ... Total Turnkey Basis
increasing vertical clearance of existing 66kV Hebbala - ITI DC line to Pottery Road S/s passing near St. Charles School between tower no. 22 & 23 in St. Thomas Town, HBR Layout Bengaluru by providing 02 No of 66kV DDplus6 NBT KPTCL design tower, ... Bengaluru-total turnkey basis ...
Establishing of 2X20 MVA, 66/11 kV Sub-Station at Mylapura along with Construction of 66kV LILO line using Drake Conductor on 110kV NBT towers from existing 66/11kV Chintamani-Talagawara DC line to the proposed 66/11kV Mylapura Sub Station for a ... Partial TurnKey basis ...
The brief scope of work under this tender is Shifting of BESCOM utilities at w-06, N-02, N-08 & N-06 Sub-Divisions which are infringing/ obstructing to construction of Viaduct and Metro Stations all along the ORR from PES College to Laggere Pipeline ... Total Turnkey basis ...
Combined Package for, Work-A Replacement of existing 1x12.5MVA and 1x8MVA, 66/11kV Power Transformers by 2x20MVA, 66/11kV Power Transformers at 66/11kV Yeldur Sub-station in Kolar Taluk & District. Work-B Replacement of existing 2x12.5MVA, 66/11kV ... Total Turnkey Basis, ...
Combined package of Work-A Establishing 2x20MVA 66/11kV substation at Karahalli in Devanahalli Taluk, Bengaluru rural district alongwith running of 1.205Rkm of 66kV 1000sqmm UG cable LILOing from proposed CTT in existing 66kV NRS-DBpura-Vijayapura SC ... Partial Turnkey Basis ...