Loading…
Loading…
1,596 results • Best match
Construction of Cable Stay Bridge With Viewing Gallery on Satara Kas Bamnoli Road (MDR.26), Between Bamnoli Tal.Jawali To Dare Tal.Mahabaleshwar on Backwater of Koyna Reservoir Dist.Satara, in the State of Maharashtra on (EPC) Mode.
Design and construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk (Design Length 8.90 km) in Nagpur city on Nagpur-Umred section of NH-353D in the state of Maharashtra on EPC mode
EPC PN-II (11A C) - Improvement to SH 129 Kalas Lohgaon Wagholi Rahu Sidhatek (Nagar Dist) Bhabora Rashin Karmala Barshi Usmanabad Borfal Road SH 68, km from 8/800 to km 61/400 and Pargaon Yawat SH 119 Km 0/000 to km 20/000 on EPC mode
Construction of Cement Concrete Roads and Drains of DP Roads under Maharashtra Suvarana Jayanti Nagarotthan Mahabhiyan Yojana in Municipal Council Jamner Area Tq Jamner Dist Jalgaon 38 Roads in the State of Maharashtra on EPC mode
Rehabilitation and Upgradation of Shivaji Maharaj Chowk to Barshi Naka Ch. 47.000 to Ch.49.500 2.5 km length section of NH361F to 4 lane configuration in Beed City on EPC Mode in the state of Maharashtra
Construction of service road in the intermittent stretches from km 180.470 to km 205.780 on the Sinnar to Nashik section of NH60 in the state of Maharashtra on EPC mode Total length 12.780 including both sides
Upgradation to four lane with paved shoulder configuration of the Nashik to Peth section of NH848 from km 11.600 to 53.600 excluding 4 lane sections Length 36.371 km in the state of Maharashtra on EPC mode.
Strengthening to road connecting NH-61 - Belhe - Alkuti - Devibhoyre - Nighoj - Shirur and terminating at NH753F in Pune District. NH761, section - Belhe - Shirur, km 0/00 to 48/019, in the State of Maharashtra under EPC mode.
Strengthening to Jhallmal Purur Balod CG Border Murumgaon-Dhanora Gadchiroli - Mul Chandrapur Warora Wani - Karanji Road NH 930 in Stretches Km 163/00 to 171/00 (Lekha to Pandharsara ) in the State of Maharashtraon EPC mode
Reconstruction and Upgradation of Kopargaon to Savali Vihir Section of NH752 G from Design Ch. km 353.000 to Ch. Km 362.663 to Four lane with paved shoulder configuration in the state of Maharashtra on EPC mode.
RFP for Consultancy Services as Authority Engineer for Construction of Major Bridge across Bankot Creek between Kolmandla District Raigad to Veshvi on Revas Reddi Coastal Highway SH Special No 5 in Ratnagiri District on EPC Mode
Construction of 2 lane paved shoulder in 4.122 Km Balance Length with rigid Pavement and ROB ON Karnataka Border Km 70.682 to Akkalkot Km 106.526 on NH 150E in the State of Maharashtra on EPC Mode
Rehabilitation and Up-Gradation to 2 Lane with paved shoulder Configuration of Velapur Mahud section of NH 965G Design Chainage from Km 10/500 to Km 32/300 in the state of Maharashtra on EPC Mode.
Construction of 6 Lane Elevated corridor from KM 593.766 to KM 596.400 including construction of slip roads service roads in Kagal City. (Descoped work of Kagal Satara Package1) in the state of Maharashtra on EPC Mode.
Design and Construction of 6 lane Standalone single span Grade Separated structure at Km 532 552 on Gonde Vadape section of NH 3 New NH 848 in the state of Maharashtra balance work on EPC Mode
Consultancy services for AE for supervision of Construction of ROB with approaches in lieu of Railway crossing LC 20 on NH 161H at km 24-913 (near Nandura) in the state of Maharashtra on EPC mode.
CS for AE for Supervision of Upgradation and rehabilitation of Service Roads on both sides in urban areas of Pune City on Pune Satara sec of NH48 in Maharashtra on EPC Mode under NH(O) Projects.
CS for AE for Supervision of Cons of 4lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 of NH543(Design Length 41.210 Km)under BMP in Madhya Pradesh and Maharashtra on EPC Mode.
Consultancy Services for AE for Supervision of 4 Laning of Akola to Medshi from Km 0.000 to Km 47.700 of NH-161 including Bypasses at Patur and Medshi in the state of Maharashtra on EPC Mode.
Construction of Six lane Bhandara Bypass, Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under Bharatmala Pariyojana in the state of Maharashtra on EPC mode
Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package IX)
Rehabilitation and Up-gradation for Yedshi-Latur road Section of stretch, NH- 63, starting from Ch. 24-350 to Ch. 61-875 Km (Length-37.525 Km) to 4LPS in the State of Maharashtra on EPC Mode.
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and up-gradation of Sabalkhed to Ashti and Chinchpur to Jamkhed of NH-561 to 2PLS/Four lane configurations in the state of Maharashtra on EPC mode
Strengthening to road connecting NH-61 - Belhe - Alkuti - Devibhoyre - Nighoj - Shirur and terminating at NH753F in Pune District. NH761, section - Belhe - Shirur, km 0/00 to 48/019, in the State of Maharashtra under EPC mode
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Rehabilitation-Upgradation of Karanja-Kherda-Murtizapur Section to 4-LPS standards (Excluding overlapping portion with Samruddhi Mahamarg) section of NH 361C on EPC Mode in the state of Maharashtra.
Rehabilitation and Up-gradation to 4 lane Road with PS configuration from Undewadi Kade pathar (Ch. Deshmukh Chowk and Dhawan Patil Chowk (Baramati) Phaltan section of NH-160 in the State of Maharashtra on EPC mode.
Construction of Minor Bridge at Hangarga Khurd Village at km 84.820 on NH161A Kundral to Wazar road section including its approach road on EPC Mode in the State of Maharashtra Total Length including approach 0.361 km
Construction of Access Controlled Pune Ring Road (East) in the State of Maharashtra on EPC Mode Package PRR E6 from Km.81 900 Sonori to Km.97 900 Garade, Taluka Purandar, District Pune (Length-16.000 Km)
Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway (Jujuwa to Gandeva Section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package-VIII)
CS for AE for Supervision of 7 Nos. of NRCW projects on EPC Mode on Taloda Burhanpur section of NH 753BE Tarsod Fagne Section of NH 53 passing through Jalgaon city in the State of Maharashtra
E-65 Low Temperature H2O2 gas plasma sterilizer along with Endoscopy washer on turn Key
Tender No. E- 5126/HBPCL/PC/Turn Key Work For C T Stimulator/2023-24
E-53 (24-25) Modular burn care complex with essential equipment on turn key basis
Geo Tagging of 58000 Mangroves plants of Mira Bhayander Municipal Corporation Under Turn key Project
Supply And Installation of Digital radiography machine on turn key basis at Gorewada Project, Nagpur
Tender No. E-3513/HBPCL/PC/ Medical Pneumatic Tube system with Turn key/2021-22
Supply Installation And Commisioning Advance Ophthalmic OPD WITH Eqp. on Turn Key Basis And Equipments
PROCUREMENT OF ROAD WEIGH BRIDGE IN TURN-KEY BASIS FOR BHANDARA DISTRICT RICE MILL CLUSTER
Establishment of industrial robot training centre on turn key basis for Production and Mechanical Engineering
Procurement of Rice Processing Machinery in Turn-key Basis for Bhandara District Rice Mill Cluster.
E-61 (24-25) Upgradation Of Neurosurgical Equipment For Neurosurgical Theater On Turn Key Basis
Rectification of Black Spots in Karnala Ghat in Panvel Indapur Section of NH 66 Old NH 17 from Km 0 000 Panvel to 42 300 Kasu in the State of Maharashtra under Bharatmala Pariyojana on EPC mode
Strengthening of Jhalamal - Balod - Manpur - CG Border - Sawargaon - Murumgaon - Dhanora - Gadchiroli - Mul - Chandrapur Road NH 930 in Km. 145/00 to 150/00 (Yerkad to Japtalai )in Gadchiroli District in the State of Maharashtra on EPC Mode .
Construction of Nagpur Gondia Access Controlled Expressway in the State of Maharashtra on EPC Mode -PACKAGE NG-2A from km 58 850 Thana Tq. Bhandara to km 94 100 Jambhalpani. Tq. Mohadi Dist. Bhandara Length- 35.250 km
Strengthening to Khetia Shahada Prakasha Nandurbar Visarwadi Sakri Satana Deola Chandwad Manmad Shirdi Road, NH 752G in km 144/00 to 162/300 (part Sakri to Samode - 18.30 km length ) in the State of Maharashtraunder EPC mode.
Construction of Access Controlled Pune Ring Road (East) in the State of Maharashtra on EPC Mode Package PRR E5 from Km.72 335 Valati, Taluka Haveli to Km.81 900 Sonori, Taluka Purandar, District Pune (Length- 9.565Km)
Rehabilitation and Upgradation of Maharashtra MP Border to Tumsar section of NH 543K from km.51.000 to 69.000 to two lane with paved shoulder configuration in the State of Maharashtra on EPC mode total length 18.00 km
Consultancy Services as Authoritys Engineer for Construction Of Major Bridge Across Kundalika Creek Between Revdanda To Salav On Revas Reddi Coastal Highway SH Special No 5 in Raigad District in the State of Maharashtra on EPC Mode
Reconstruction and Upgradation of Jamkhed To Sautada Section of NH 548D from design Ch. Km 195.375 to Ch. Km 208.774 to two lane with paved shoulder Four Lane configuration in the state of Maharashtra on EPC mode.
Improvement to road Bhatambra Osmanabad Sarola Shivli Borphal Road SH-68 Km 261/660 to 314/00 (Part- Jijau Chowk to Osmanabad to Borphal NH-361) (Total Length 50.00 Km) Dist. Osmanabad on EPC mode (2nd call)