Loading…
Loading…
1,596 results • Best match
Four Lanning of NH-965G from km 83.500 (Indapur) to km 130.202 (Tondale) Design Length 46.702 km and One time improvement of selected stretches (Package-III) in the State of Maharashtra under Bharatmala Pariyojna on EPC mode
Four Lanning of NH-965G from km 41.369 (Baramati) to km 83.500 (Indapur) Design Length 42.131 km and One time improvement of selected stretches (Package-II) in the State of Maharashtra under Bharatmala Pariyojna on EPC Mode
Consultancy Services for AE for supervision of six laning of Kagal-Satara section of NH-48 (old NH-4)Package-I from km 592.240 to km 658.000 in Maharashtra to be executed on EPC mode under BMP
Construction of Minor Bridge at Km.419.285 and Construction of Box Culverts at Km.354.872 and Km.354.892 towards Flood Damage repairs on Nagpur-Hyderabad section of NH-44 in the State of Telangana on EPC Mode.
Rehabilitation and upgradation of Viaragarh (Mohadi) From Design Ch. 73.830 to Ch.76.00 (Length 2.17Km) in Chikhli Khamgaon section of NH 548CC to two lane with paved shoulder Configuration in the state of Maharashtra on EPC Mode.
Consultancy services for Authoritys Engineer for Supervision of Construction of New 2 lane Bridge over Purna River including approaches in Shegaon Deori fata section of NH548 C in the State of Maharashtra on EPC Mode.(2nd Call)
Strengthening of existing carriageway in Akkalkuwa to Gujrat State Border section of NH-753B from Km 101/00 to Km 111/200 Km 111/800 to Km 118/430 in the State of Maharashtra under EPC mode
PR in Km. 29-00 to 59-00 (Lasur Vaijapur up to Dist. Border in stretches in Km. 29-00 to 32-00, Km. NH-752I Kopargaon - Aurangabad Jalna Jintur Ardhapur Himayatnagar Fulsawangi Mahur. On EPC Mode.
PR to NH 965DD starting from its junction with NH965D near Lonand and connecting Andori to Mandangarh and terminating at Pacharal Section Shindewadi Phata - Bhor - Pune Dist. border, km 33/550 to 58/050 under EPC mode.
Construction Of Residential Quarters (Type II, III, IV and V) and 250 Bedded Hospital at Maharashtra Institute of Mental Health Pune on EPC basis with Defects Liability of 60 Months
Supply instllation andcommissioning of Advance Ophthalmic OPD with equipments on turn key basis and equipment
Supply of Evaporating Air Cooling System on turn key basis at DAGA MEMORIAL WOMEN HOSPITAL, NAGPUR
1)providing turn key for B zone ESr i.e. jawahar,shahapur,guru, and sangli naka ESR.
E- 60 (24-25) Upgradation of Medical Equipment of Neurosurgery OT-2 on Turn Key Basis
Tender No. E-2730/HBPCL/PC/ 128 Slice CT Scan Machine with Turn Key /2020-21
SUPPLY INSTALATION AND COMMISIONING OF MODULAR OPERATION THEATRE and Upgradation of Labor Room ON TURN KEY
E-Tender for Creating Sustainable Livelihoods Through Oyster Mushroom Cultivation, Marketing and Branding Turn Key Basis
Tender No. RT- 5124/HBPCL/PC/Turn Key Work For C T Scan Machine /2023-24
Tender For STP ETP Unit Project at Lady Harding, Akola, dist Akola On Turn Key Basis
Rehabilitation Upgradation of existing highway to Two Lane Four Lane of Karad Tasgaon (From KM 0/000 to Km 58/830) Section of NH-266 on EPC mode in the State of Maharashtra. Reg. Repairing of Approach Road
Construction of ROB on Dhawari - Therban - Somthana -Kini - Palaj Road MDR - 20 CH 41/0 (LC No 4) Km 40/485 to 45/100, in the State of Maharashtra on EPC mode., Tq. Bhokar, Dist.Nanded (Length 3.6 Km.)
CONSTRUCTION OF FOUR LANE RAILWAY OVER BRIDGE ON NARKHED RAIWAY LINE CHAINAGE 29/0 INCLUDING STRENGTHENING AND BLACK TOPPING TO ROAD FROM CH.28/0 TO 31/0 ON AMRAVATI WESTERN BYE-PASS ROAD SH-299.(EPC) MODE
Authoritys Engineer for Supervision of Rehabilitation and Up- gradation for Talere Gaganbawda Kolhapur Road (NH-166G) stretches start from Start of Karul Ghat to End of Gaganbawda of NH-166G in the State of Maharashtra on EPC Mode.
Consultancy services for AE for supervision of Rehabilitation and upgradation from of Kolde to Visarwadi (Near Junction with NH-6) section of NH752G (total length -4.40) to 2LPS/ four lanes in the State of Maharashtra on EPC mode.
Construction of Access Controlled Pune Ring Road East in the State of Maharashtra on EPC Mode Package PRR E7 from Km 97 900 Garade, Taluka Purandar to Km.104 140 Shiware, Taluka Bhor, District Pune Length-6.240 Km
Upgradation and Rehabilitation of Section of NH 361F Gangakhed to Loha road Package from Gangakhed 30.400 to Loha 71.400 Upgradation two Lanes with paved shoulder Four Lane Configuration on EPC Mode in state of Maharashira. Length 41.00 Km
4-Laning of existing 2-laning stretch from Dharmapuri at km.117.000 to Lonand at km.166.400 (Pkg-IV) on Mohol-Alandi section (Design length 49.400 km) of NH-965 in the state of Maharashtra on EPC Mode
Up-gradation to 4-Lane with Paved Shoulder configuration of the highway starting from km 88.400 (Savali Vihir) to km 163.400 (Ahmednagar bypass) (Design Length-75.000 km) section of NH-160 in Maharashtra under BMP on EPC Mode
CS for AE for Const. of 4L Nagpur-Katol sec of NH353J include. Mitigation Structures from Design Ch.37.000 to Ch.45.990 TC-I and from Design Ch. 50.400 to Ch63.100 TC-II in Maharashtra on EPC Mode
CS for AE for supervision of design and construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk (Design Length 8.90 km) in Nagpur city on Nagpur-Umred section of NH-353D in Maharashtra on EPC mode
Design and Construction using Thin White Topping (TWT) including routine maintenance and balance works of Khed-Sinnar section from km.42.000 to km.177.000 on NH-60 in the state of Maharashtra as Standalone project on EPC Mode.
Balance work of Upgrad to 4 Lane with Paved Shoulder config of the highway starting from km 88.400 (Savali Vihir) to Km 163.400 (Start of Ahmednagar Bypass)(L75.000km) sec of NH160 in Maharashtra under BMP on EPC Mode.
Realignment and curve improvement near Deulgaon Mahi town from design chainage Km. 105.300 to Km. 106.185 (length- 0.885 Km) near on NH 753A to Four lane with paved Shoulder configuration in the state of Maharashtra on EPC mode
Rehabilitation and Upgradation of Aurangabad Sillod Ajanta Jalgaon, NH-753F from Km. 87/700 to Km. 89/800 Km.144/750 Km.147/380 (Design Chainage) to Four lane configuration In the state of Maharashtra On EPC Mode.
Balance works of 4-laning of Fagne to Mah Guj Border section of NH-6 in the State of Maharashtra from km 510.000 to km 650.794 design length 140.794 km to be executed on EPC Mode under BMP
Rehabilitation and Up gradation of NH-222 from end of Ahmednagar Bypass to Kharwandi kasar (Pathardi) section Balance work in Km.232 000 to Km.284 000 in Maharashtra to two lane with paved shoulders on EPC Mode
Rehabilitation and Up-gradation of Section Watur to Jintur Road of NH 752 I to Two Lane with paved shoulder configuration on EPC mode in the State of Maharashtra. Package From Watur (00 000) to Charthana (27 00)
Repair and maintenance of NH 4B from Km 21 200 to Km 27 270 D to E Section and from Km 0 000 to Km 4 492 D to G Section of JNPT Pkg IV on EPC Mode
Widening with Construction of Concreat road of Ahmednagar Road to Paithan Road (four laning of link road) and Kanchanwadi Satara Devlai Road MDR -79 Km 0/000 to 33/000 Dist. Chhatrapati Sambhajinagar on EPC mode (2nd Call)
Up-gradation to Four Lane configuration with Palkhi Marg of the highway starting from Junction with NH-65 near Patas -Vasunde Phata-Baramati (NH965G) and Partly Baramati Bypass in the State of Maharashtra under BMP on EPC mode
Construction of Bhandara Gadchiroli Access Controlled Expressway in the State of Maharashtra on EPC Mode Package BG 02 from Km 0 000 Garada Bk Tq. Bhandara to Km 34 750 Sarandi Bk. Tq. Lakhandur Dist. Bhandara Length 34.750 KM
Balance work of Khed Ghat Realignment Km 46.981 Km 51.400 AND Narayangaon Bypass Km 76.300 Km 81.200 Total length 9.31 Km on Khed Sinnar section of NH 60 Old NH 50 on EPC Mode in the State of Maharashtra
Implementation of Improvement of Chhatrapati Shivaji Maharaj International Airport Junction T2 by Construction of Vehicular Underpass between Km. 6 plus 140 to Km. 6 plus 950 of Western Express Highway in Mumbai. EPC Mode Revised Proposal 2 nd Call.
Improvement to SH-57 to Tintraj Dandegaon Devgaon Gosaviwadi Khandeshwarwadi Ratnapur Anala Kandari Kumbephal Pachpimpala Paranda Mungshi Road Km.0/00 to 65/00 (Tintraj SH-57 to Paranda Kurduwadi) (Palkhi Marg) (Total Length 65.00 Km) on EPC mode
Rehabilitation and Upgradation of Two Lane road with Paved Shoulders length in Kinkheda and Linga Kotwal Village NH 461B from KM. 25.900 to 28.775 (in 5 Nos Stretch Total length 1.475 KM) in the state of Maharashtra EPC mode
Strengthening of Service Roads with rigid pavement on Wardha Butibori Section and Construction of Foot Over Bridge at km 446.085 at village Bhidi on Yavatmal to Warda Section of NH-361 in the State of Maharashtra on EPC mode
Consultancy services for Authority Engineer for Construction of Bypass for Jamb Junction at Ch. 61.100 to 64.662 and VUPs at design Ch.61.878 and 63.845 on NH-44 for Jamb Junction in the State of Maharashtra on EPC mode
Construction of 6 Lane Elevated corridor from KM 698.600 to KM 699.900 section of NH48 including construction of slip roads service roads in Umbraj City. (Descoped work of Kagal Satara Package2) in the state of Maharashtra on EPC Mode.
Construction of Foot Over Bridge at Ch. 137.570 and Ch.135.620 on Akkalkot Solapur NH150E, at Ch. 309.080 on Solapur Maharashtra Karnataka border NH65, at Ch. 71.950 on Solapur Yedeshi NH52 in the state of Maharashtra on EPC Mode
Design and Construction of Vehicular Underpass as Long term rectification work at MoRTH Blackspot Dongarbaba Temple MH 04 192 at Ch 425 510 on Pimpalgaon Nashik Gonde Section of NH 3 in the State of Maharashtra on EPC Mode