Loading…
Loading…
25,857 results • Best match
Re-Organization work of water supply scheme on turn-key basis for District Raebareli Under Jal Jeevan Mission Programme (Package 10)
Certain Civil and Sanitary works to the Govt Residential quarter No C-44 at Malakpet colony , Hyderabad (Turn key)(4th call)
WORK FOR 33 AND 11 KV LINE SHIFTING ON SEMI TURN KEY BASIS AT NEAR SHAMSHABAD CHAURAHA UNDER EDD MANJHANPUR KAUSHAMBI
Planning, Design and Construction of 150 bedded critical care Hospital Block (B plus G plus 6) Building at AIIMS Trauma Centre for AIIMS, New Delhi including all Civil and MEP Services, Hospital Services, Horticulture and Development works on EPC Mode-I...
Refer to EPC Schedule
Design and Construction of Road as Part af ICBR Works from Y Jn Sungetsar Jesmi Rock to Cheema Karpola Bet Km 0pt000 to Km 18pt590 Net Length 18pt590 Km Through EPC Mode of Execution to include Fmn Works Pmt Works and Surf Works in area of responsibi
Strengthening of pavement and widening of 1.5 m paved shoulder on either side and strengthening NH-39 under Annual Plan for the year of 2018-19 under Golaghat NH Division in the State of Assam on EPC Mode. (Job No. 039/AS/2018-19/186)(RT)
Construction Of Vehicular Underpass (VUP) including Approaches Near Peddem Junction At 502.327 Of NH-66 in the state of Goa on EPC Mode Under Road Safety Annual Plan 2024-25. Reg Hiring of Vehicle for a period of 24 months for use of AE II Mapusa
Providing Periodical Renewal on Chandigarh-Ropar-Road from km 22.600-28.600 (New NH-205, Old NH-21) and Chandigarh-Ludhiana Road (New NH-05, Old NH-21) Section Zirakpur to UT Boundary from Old km No. 0.871-1.68 and New km 236.845-237.657 on EPC Mode
Consultancy services for Authoritys Engineer(AE)/PMC for supervision of Construction of Jasra bypass with four lane paved shoulder configuration from km 379.670 of NH-76 (New NH-35) to km 18.000 of NH-27 (New NH-30) on EPC mode in the State of U P
Strengthening of existing 2 lane (Total Length-35.00 km of NH-52(New NH-15) under Annual Plan for the year of 2018-19 under Nagaon NH Division, Nagaon in the State of Assam on EPC mode, Job No 052(New NH-15)/AS/2018-19/185)
ENGAGING TECHNICAL CONSULT FOR PREP OF (FS) (DPR) ON EPC MODE FOR CONST RD SEMAI-BASKAR-KAWACHI (NEW ALIGNMENT) KM 54.873 TO KM 90.00 (NET LENGTH 35.127) GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS IN THE AOR OF 119 RCC UNDER 756 TF P ANK IN A.P
Authority Engineer bid for Up gradation to 2 lane with paved shoulder from Neechli Oden (Nathdwara) at design km 88.800 (existing km 55.95) to Bhatewar at Design km 142.028 (existing km 0.00) of NH-162E in the state of Rajasthan on EPC mode for the y
4-laning of Indore to Raghav Garh section of NH-59 (Indore-Harda package-1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Design 26.653 Km) under Bharatmala Pariyojana Phase-I (EC) in Madhya Pradeshv on EPC Mode
Rehabilitation and Up gradation of existing road to two Lane with paved shoulder configuration from Design Chainage Km. 36/400 to Km. 107/224 of NH-167BG from Duttaluru (at NH-565 Junction) to Kavali (Joining on NH-16) in the State of AP on EPC mode
STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 482.070 TO KM 482.170 KM 493.970 TO KM 494.115 KM 494.450 TO KM 494.600 KM 495.320 TO KM 495.540 KM 486.100 TO KM 486.170 ON RISHIKESH JOSHIMATH MANA ROAD NH07 ON EPC MODE IN THE STATE OF UTTA
Stage Strengthening from km 411/000 to 419/900 and from km 420.00 to 437.00(L-25.90km) of NH-52 (New NH-15) under Annual Plan for the year 2019-2020 on EPC Mode in the State of Assam, Job no 052/AS/2020-21/210
Engaging Service Provider for Providing Consultancy and Contracting Service for HQ control field staff for QATA for the works of Const. of Major Bridge over river in replacement of existing Route at km 567/00 to 572/200 of NH 56 on EPC mode in SoG
Consultancy Services for Authority Engineer for constr. of Service Road str. at specified major junc. for imp. corridor eff. of Domel Udhampur NH44 From Ch. 220.550 to 182.200 for 14.370 Km on LHS and for 10.890 Km on RHS in UT of JK on EPC Mode
Upgradation of Existing NH-115 from 2-lane Configuration to 2-lane with Paved Shoulder from km 44.369 to km 54.806 (L 10.437 km) in Tinsukia District under Dibrugarh NH Division in the state of Assam under EPC mode (Job No. 115/AS/2024-25/283)
DESIGN AND CONSTRUCTION OF CL 9 ROAD AS PART OF ICBR WORKS FROM BANGA JANGA GOMPA BJG TO NAGA GG NGG BETWEEN CHAINAGE KM 20PT00 TO KM 54PT00 NET LENGTH 36PT694 KM THROUGH EPC MODE OF EXECUTION TO INCLUDE FORMATION PERMANENT AND SURFACING WORKS IN ARE
Widening from Existing Intermediate Lane to Four Lane in Sringeri Town limits from Km.110.00 to 115.00 (Old Km.640.00 to 645.00) of NH-169 (Old No.13) on Shivamogga Mangalore Section in the state of Karnataka on EPC mode. (Job No.NH-169-KNT-2020-21-
Construction of four Lane ROB and its approaches in lieu of the existing level crossing LC No RV 168 (Presently RV172) at Km 176 of NH 201 (Presently NH 26) at Kesinga including Land Acquisition (LA) under NH (O) on EPC Mode in the State of Odisha
Engagement of user fee collection agency on the basis of CB through e-tender at Vaddupalli FP at Km. 14.500 of NH-544DD from Km 0.000 to 56.000 of Anantapur-Kalyandurg section of two lane with paved shoulders on EPC mode under NH(O) in Andhra Pradesh
CS FOR AE SERVICES FOR 4 LANING OF GAZIPUR - BALLIA - UP/BIHAR STATE BORDER (GREENFIELD) SECTION OF NH-31 (I) HRIDAIPUR (KM 0.000) TO SHAHAPUR (KM 42.500) (PKG-I) AND (II) BUXAR SPUR OF LENGTH 17.270 KM (PKG-IV) IN THE STATE OF UP ON EPC MODE
CONS OF ROAD CHUSUL DUNGTI FUKCHE DEMCHOK PACKAGEI FROM KM 0PT00 TO KM 56PT240 (INCDL MAJ BRIDGE OF 140 MTR SPAN AT KM 55PT800) FROM EX TRACK TO NHSL SPECS UNDER EPC MODE (7PT45 MTRS FMN WIDTH) UNDER PROJECT HIMANK IN UT OF LADAKH (LENGTH 56PT240 KM)
Rehabilitation and Up-gradation to 2 lane with paved shoulder from existing chainage km 102/000 to km 134/950 pkg v including constructi. of Naushera tunnel under 31 TF on Akhnoor - Poonch Road NH-144A in the UT of Jammu and Kashmir through EPC mode
Treatment of 04 nos of landslide locations (Ch. 134.315 km to 134.400 km, ch.135.848 km to ch. 135.910 km, ch. 145.390 km to 145.605 km and ch. 168.755 to ch. 168.840 km (Tyuni Mussoorie section) on NH 707A under EPC mode in the State Of Uttarakhand
STABILIZATION OF LAND SLIDE AND SLOPE PROTECTION AT KM 473.750 TO KM 473.800 KM 476.270 TO KM 476.350 KM 491.400 TO KM 491.750 AND KM 498.120 TO KM 498.700 ON RISHIKESH JOSHIMATH MANA NH58 ON EPC MODE IN THE STATE OF UTTARAKHAND NOS OF LAND SLIDE 04
C/o a 70.0-meter span RCC arch bridge, including approach roads on both sides, flood protection works, and the C/o ornamental campus main entry gate with a security check post at the South Campus of IITM. In EPC mode I (Design and Build Basis)
Consultancy service for Authority Engineer for supervision of Construction of 4 lane ROB and its approaches in lieu of existing Level Crossing No.48 E at km.66.900 on NH-50 Railway Chainage 96/6-7 Near Naubad in the state of Karnataka on EPC Mode
CS for AE for Supervision of Const of New Slip Service road on either side at various locations L25.140 Km Flyover at Borivali Junc Km.528.550 at Sherekarpada Km.528.800 on Pimpri Sado Vadape sec of NH848 Km.460.900 to Km.537.000 in MH on EPC mode
Conversion of Partially Excavated Esc to main tunnel(Length 1.80 Km) frm Km 12.732 to Km 14.568 of NH 21 including construction of cross passages and approach roads on either side of the tunnel on Kiratpur to Nerchowk sec of NH 21 in HP on EPC Mode
Strengthening of 2 lane with paved shoulder of NH-54 from 12th km to 40th km(Length-22.20 km) under Annual plan for the year 2018-19 under EPC mode under PWD, NH Division, Silchar in the state of Assam, Job.054/AS/2018-19/184
CONST/IMPRO/WIDENING OF RD TALIHA-NACHO FROM KM 0.00 TO KM 23.400 (NET LENGTH 23.40 KM) UNDER PKG-1 FROM CL-09 TO NHDL SPECIFICATIONS EPC MODE UNDER 77 RCC/ 23 TF/ P ANK IN A. P (JOB NO D-BR-I/01/ARK/2022-23)
Providing New Jersey Type Crash barrier along with Anti Glare Screen on in place of Median on NH 503Ext in km 28 450 to 31 00 35 00 to 43 300 4 lane portion excluding Municipal Committee area in the State of Himachal Pradesh on EPC mode
Widening from Two Lane Paved Shoulder to Four Lane with Paved Shoulder Km 81/300 - 110/700 of NH-81 and Strengthening from Km 81/300 - 86/500 and Km 87/600 - 96/300 of NH-81 on EPC mode in the State of Tamil Nadu
Supervision Consultant Services on following NH works being executed on EPC mode 2-Lane on NH248A and 4 Lane on Ajmer-Nasirabad, Grade separated structure VUP on NH89, Flyover/VUP on Ajmer Nagaur on NH-89 (i) Tehla at km 38/240 (ii) Junction on NH89
CONSTRUCTION OF NELYA PT 4340 RC ROAD FROM KM 0.000 (STARTING POINT MANDIR TIKRI) TO KM 16.275 (RC POST) (APPRX NET LENGTH 16.275 KMS) AND ADDITIONAL LINK TO PT 4340 OF 0.950 KM TO NHSL SPECIFICATION UNDER 42 BRTF/(P) VTK IN AP STATE IN EPC MODE
Second Call for Balance work of Rahabilitation and up-gradation Indapur to Wadpale (Design Ch. 87/100 to 91/600 and 99/100 to 110.750) section of NH66 in state of Maharashtra to four lanes with paved shoulders under NHDP- IV on EPC mode, Work on Risk
Construction of ROB and its approaches in replacement of existing level crossing at Km 843.205 of NH-17(New)/NH-31(old)under Abhayapuri Construction Division in the state of Assam under Annual plan 2021-22 under EPC mode.(Job No.-17/AS/2021-22/235).
Improvement to Paithan-Apegaon-Shahgad (District Border) road SH-26 Km 370/200 to 399/700 And Paithan-Shevgaon ( District Border) road SH-61KM 80/00 To 90/00 and Four laning in Pachod village Km 120/000 to 126/000 on EPC mode (2nd Call)
Construction Of Vehicular Underpass (VUP) including Approaches Near Peddem Junction At 502.327 Of NH-66 in the state of Goa on EPC Mode Under Road Safety Annual Plan 2024-25 Reg Hiring of Vehicle for a period of 24 months for use of AE III Colvale
CS for AE for SC of GF Road connecting North-south industrial cluster near Krishnapatnam port at Thamminapatnam-Narikellapalle Part-I Ch 0.000-14.650 and port Road on NH-67 Part-II Ch 18.000-19.300 in AP on EPC Mode under BMP P-I (2nd Call)
Construction of Flyover at Km 936.440 in Jonnada Jn, at Km 967.180 in Undrajavaram Jn, at Km 970.370 in Tetali Jn, VUP at Km 1006.525 in Kaikaram Jn for rectification of Blackspots and Flyover at Km 910.760 ofNH-216A in Morampudi Jn in AP on EPC Mode
Construction of VUP with RE Wall Approaches (Design Ch. Km 43.050 Existing Ch. Km 43.070) and Service Road (Design Ch. Km 42.650 to Km 43.450 BHS) of Bar Bilara Jodhpur Road Project of NH 25 (Old NH 112) in the State of Rajasthan on EPC mode
O and M of 4 laned Kagal Satara Km 592 240 to Km 725 section of NH 4 New NH 48 in the State of Maharashtra Design Construction of Service Road at Kashil Km 704 200 on Standalone basis on EPC mode to eliminate Black spot
CS for AE for Supervision of Const. of 4 n 6 lane GF connectivity from Talwara Jattan Vill on NH44 to Gobindsar Vill on Delhi Amritsar Katra Expressway km 0.000 to km 12.345 (Pathankot Link Road) in Punjab on EPC Mode under NH(O)2nd call
DESIGN AND CONST OF ROAD AS PART OF ICBR WKS FROM SURVANSAMBA TO KANAKSPUR FROM CH KM 0.000 TO KM 6.550 (NET LENGTH 6.550 KM) THROUGH EPC MODE TO INCLUDE FMN WKS, PMT WKS, MINOR BRIDGES AND SURF WKS IN AOR OF PROJECT VARTAK IN ARUNACHAL PRADESH
ENGAGING TECHNICAL CONSULTANT FOR PREP OF (FS) AND (DPR) ON EPC MODE FOR CONSTR OF RD SIYUM-MENCHUKA (NEW ALIGNMENT) KM 0.00 TO 80.00 (NET 80.00 KM) GREEN FIELD ALIGNMENT TO NHDL SPECIFICATIONS IN THE AOR OF 77 RCC UNDER 23 TF ( P) ANK IN A. P