Loading…
Loading…
25,857 results • Best match
CONSTRUCTION AND DEVELOPMENT OF ROAD AND GHAT ON WESTERN BYPASS TO VAJEGAON BANDHARA (GODAVARI RIVERSIDE) KM 0/000 TO 6/000 ON LINK ROAD NO 03 SH 247 TQ. DIST NANDED (ACTUAL CHAINAGE FROM 4/300 TO 6/000) IN THE STATE OF MAHARASHTRA ON EPC MODE
Periodic Renewal Work from Km.95.000 to Km.97.000, Km.101.000 to Km.102.000, Km. 103.000 to Km.107, Km.108.000 to Km.111.000, Km.120.000 to Km.124.000, Km.132.000 to Km.151.000 of NH-227A under EPC mode in the state of Uttar Pradesh
Construction of 4 Lane with Paved shoulders Bypass to Nalgonda Town from design km 0.000 to km 14.000 length 14.00km Existing Ch km 18 710 to 28 685 of Nakrekal to Nagarjuna Sagar section of NH 565 in the State of Telangana on EPC Mode under Annual
One time improvement to the road in Bypassed stretch of NH 544E via overlay from Km 58/970 to Km 62/980 (Madakasira town limits) of Kandikonda Madakasira Sira Road in the State of Andhra Pradesh under NH (O) for the year 2023 24 on EPC mode.
Construction and widening of ROB existing (Railway portion and approach) at Km. 76/00 of Old NH-116 (New NH-552 Extn.) in Sawai Madhopur City in the State of Rajasthan on EPC mode (Job No. NH-116 (New NH-552 Extn.)-RJ-2020-21-760)
Strengthening of Four Lane with Earthen Shoulder Flexible Highway from Bogda Pull at km 4/2 to Start of Ayodhya Bypass at km 9/10 on NH-86 Extn. of Total Length 5.340 km with Earthen shoulder configuration in the state of Madhya Pradesh on EPC mode
Widening to Two lane/ Two lane with paved shoulder from existing intermediate lane from Km.60.000 to 110.000 (Old Km.590.000 to Km.640.00) of NH 169 (New No) (Old NH-13) of Solapur to Mangalore Section in the state of Karnataka on EPC mode. (Job No.N
Construction of 6-Lane Underpasses (5 Nos) and allied works on Existing 4 Lane Hyderabad to Bangalore Section of NH-44 from Km 35.165 to Km 74.965 in the State of Telangana on EPC Mode, as part of Long term Rectification of MoRTH Identified Black Spo
Construction of 6 Lane Underpasses (2 No) and allied works on Existing 4 Lane Hyderabad to Bangalore Sec.of NH44 at Kanimetta(km 125.890 to 127.250) n Thomalapally(km 149.110 to 150.760) in the State of TG on EPC Mode (TG 02 26 n TG 02 418).
PROVISIONING OF 180 M LENGTH AVALANCHE PROTECTION SYSTEM AT KM 32 PT 256 TO 32 PT 436 ON DARCHA SHINKUN LA ROAD THAT IS ASRP OF PROPOSED 4 PT 25 KM LONG SHINKUN LA TUNNEL UNDER PROJECT YOJAK IN THE STATE OF HIMACHAL PRADESH THROUGH EPC MODE
O and M of 4 laned Kagal Satara Km 592 240 to Km 725 section of NH 4 New NH 48 in the State of Maharashtra Design and Construction of VUP at Indoli Phata Km 704 200 on Standalone basis on EPC mode to eliminate Black spot
Construction of proposed 4 lane ROB and its approaches in lieu of existing Level Crossing No 18 at Km 620 600 on NH 150A near Nanjangud in the State of Karnataka through EPC Mode. Job no NH 150A KNT 17 16 17 012 S R B
Widening of existing 2 lane with paved shoulder to 4 lane with paved shoulder from design km 153.000 to 168.270 (Mala gate to Karkala) of NH-169 on Shimoga-Mangalore section in the state of Karnataka on EPC mode.(Job No. NH-169-KNT-2021-22-949)
Execution of Balance work for the work of Widening from existing 2 lane to 4 lane including geometric improvement and reconstruction of existing structure between Km. 56/620 to Km. 61/520 on NH-58 in the State of Gujarat under NH (O) on EPC mode
Authority Engineer for Supervision of balance Work for Four Laning of Rohtak Jind Section from Km 307.000 to Km 347.800 of NH71 and connecting link from Km 347.800 of NH71 to Km 9.400 of NH71A on EPC Mode under Bharatmala(left out in NHDP)in Haryana
Construction of 4 Lane VUP at Km 34.420, Flyover at Km 35.940 and 2 nos. FOB at Km 34.890 and Km 37.045 on Ambala-Chandigarh section of NH-22 (New NH-152) from Km 33.800 to Km 37.100 in the State of Punjab on EPC mode
Construction of 6 lane NH-344N Pkg 5 from Km 0.000 to 7.269 7.3km starting from NH 344 M Delhi at Km 26.135 of NH-344M or UER-II till Bahadurgarh bypass of NH-10 near Bahadurgarh in Haryana as spur of NH-344M on EPC mode
4/6 Lane of Yamunanagar-Saha- Barwala-Panchkula Section of NH73 from Km.70.830 to Km.115.400-Treatment of 2 Nos. of Potential Blackspot locations-1. Karera Khurd, at km.78.520 and 2. Thana Chapper, at km.101.228 in the State of Haryana on EPC Mode
Request for proposal (RFP) for Appointment of Safety Consultant for Four laning of Takoli to Kullu section of NH21 Km 242.000 to Km 272.000 on EPC Mode in the State of Himachal Pradesh AND Up gradation of Kullu-Manali section of NH21 new NH3 from Km
Construction of VOP at Manegaon village at km 468.260 from Wainganga Bridge to MH/CG Border section of NH-53 and Construction of VOP at km 120.213 at Basamba phata from Washim-Pangare section of on NH-161 in the State of Maharashtra on EPC mode
Supervision Consultant (SC) Services during O-M period for 2L with PS of Padhi-Dahod section of NH-113 (New NH-56) from Km.180.00 to Km.267.00 (Design length 85.588 km) under NHDP Phase-IV in the state of Rajasthan and Gujarat on EPC mode
Construction of FOB at Km.61.800 (village Lalpur), at Km.225.500 at Km. 284.340 (village Aram Sarai), High Mast at Km. 61.680 and Drain from Km. 61.400 to Km. 61.960 (BHS) on Ghaziabad Aligarh Mainpuri Section of NH-34 in the state of UP on EPC Mode
CS for AE for Supervision of Construction of new link NH133B from Km 0.200 in Jharkhand to Km 15.885 including Ganga Bridge cons. of Manihari Bypass from 0 to Km 5.500 widening of NH131A from 5.500 to 6.000 in Bihar 4 lane standard on EPC Mode.
4 Laning of Amritsar Bypass GA from New Tarn Taran Road-Ajnala Road from km 0.750-km.43.750 and Upgradation of existing Amritsar-Khemkaran Road to 4-Lane Config from Design km.71.496-km.78.440 Total 49.944 kms PKG-3 in Punjab under BMP on EPC mode
Consultancy Services for Authoritys Engineer for Supervision of Construction of 4-lane from Barela to NH-45 section of NH-30 from Km 2.900 to Km 39.180 (Jabalpur Ring Roa PKG-1 and PKG-2) under Bharatmala Pariyojna in the State of MP on EPC Mode
Construction of 6-lane Minor Bridge (Paloli Palam) at Km 203.160 Major Bridge (Moorad) at Km 204.895 allied works like 6 lane MCW with SR for the section Km.203.000 to Km.205.100 (length of 2.1 Km) of NH-17 under BMP in Kerala on EPC mode
New Construction of Damaged Major Bridge RCC T-Beam bridge and its approaches at Ch. 147.547 (LHS) on Yamuna Nagar-Saha- Barwala-Panchkula section of NH-73 (New NH-344) from Km. 115.400 to km. 157.192 (Package-2) in the State of Haryana on EPC Mode
Const of 3L River Bridge at Bhukhi Khadi Ch 176.420 And Amravati Khadi Ch 202.845, Addt. Const of BHS Service Rd from Ch 114.470 to 116.180 and Ch186.885 to 190.675 for Blackspots on Vadodara-Surat Sec of NH-48 in the state of Gujarat on EPC Mode.
CS for AE for Cons. of Realignment of NH-87 (New NH109) Sec. of Rudrapur Kathgodam from Design Ch. 0.000 (54.050 of NH 87) to Design Ch. 7.875 (61.550 Of NH 87) Due to Proposed Expansion of Pantnagar Airport (DL 7.875 Km) in Uttarakhand on EPC Mode
O and M of 4 laned Kagal Satara Km 592 240 to Km 725 section of NH 4 New NH 48 in the State of Maharashtra Design and Construction of VUP at Masur Phata Km 697 800 on Standalone basis on EPC mode to eliminate Black spot
CS for AE for Development of 6L GF (PKG-IIA) starts from Design Ch.23.325 to Design ch. 32.090 around Kanpur city (8.765 kms) and Development of 6L GF (PKG-IIB) starts from Design Start from 32.090 to Ch. 51.200 (19.110 kms) in UP on EPC mode.
CS for AE for supervision of Rehabilitation and Up-gradation to 4 Lane configurations and Strengthening of Thanpuri to Paror section from Km 85.135 to Km 100.840 of NH-20 (New NH-154) of Pathankot-Mandi under NH-(O) in H.P (Package-IIC) on EPC mode
Construction of VUP at Daman Ganga (Ch.368.850 km) incl SR, Culverts and Minor bridge bet Daman Ganga river and Mohan Gam railway for rect of blackspots id GJ-(02)-066 on Surat-Vapi section of NH-48 in the State of Gujarat on EPC Mode.
CS of AE for Supervision of Construction of 4-lane flyover from MES College Junction to Bogmalo Junction on NH-566 from km7.106-km10.460 and 4 lane VUP at Queeny Nagar Junction from km3.330-km4.550 on EPC mode in the State of Goa under NH(O)
CS for AE for Development of existing 2Lane NH1 from km8.660 to km33.775 (Sumbal to Wayul) to 4lane dual carriageway NH standard as part of Srinagar Ring Rd Ph2 Design Ch.41.907 to Ch.66.609 under BMP Ph1 in the UT of JnK on EPC mode
Const of (i)VUP at Km334.675(Dhamdachi) (ii)Service Road with Box Culvert on LHS at Km360.4(Balitha) (iii)VUP with Service Road at Km379.080(Talvada)for the rectification of Blackspots on Surat-Dah Section of NH-48 in the State of Gujarat on EPC Mode
Construction of underpass as long term measures at km 305.640, km 307.630, km 339.100, Km 345.300 and Km 364.200 at the stretch of 4 laning of Gorakhpur to Kasia to UP and Bihar Border section of NH 27 in the state of Uttar Pradesh on EPC mode
CS for AE for Supervision of Construction and upgradation of existing 2 Lane to 4 Lane dual carriageway NH standard from Pandaach to Manigam section of NH1 as part of Srinagar Ring Road PhaseIIA on EPC Mode under NH(O) in the UT of Jammu and Kashmir
4 Laning of Pangare to Waranga Phata sec from Km 134.500 to Km 174.645 of NH-161 including additional lengths of 800 m from Waranga Junction to Nanded and 700 m road from Waranga Junction NH-161 to Mahagaon in the State of Maharashtra on EPC mode
AE for Construction of new 4 lane Prayagraj Southern Bypass from km. 50.860 (Nababa urf Nibi Kala Uparhar) to design km. 64.763 on NH-19 (near Khodaypur Kasgaon) including Interchange loop at NH-19 in the state of UP PK-3 under Phase-I on EPC mode
Construction of 4 lane NH-344P Pkg 4 from Km 0.000 to 29.600 29.6 km starting from Bawana Industrial Area Delhi at Km 7.750 of NH-344M till Sonipat bypass of NH-352A at Village Barwasani Sonipat in Haryana as spur of NH-344M on EPC mode
RFP For Appointment of Safety Consultants for Under Construction Projects i.e. 4L of Solan-Kaithlighat Km 106.139 to Km 129.050 of NH-05 in HP, 4L of End of Pinjore bypass-Nalagarh Km 4.200 to km 35.397 of NH-105 in Haryana and HP on EPC Mode.
CONS OF 110 MTR MAJ PMT BRIDGE AT KM 1PT825 (55MTR X 2) AND MINOR PMT BRS AT KM 8PT625 (30 MTR) AND KM 16PT925 (30 MTR) ON SASER BRANGASA GAPSHAN RD (STARING POINT KM 0PT00 AT GAPSAN) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE
Construction of additional two lane with PS of NH98 New NH139 from existing Ch. 7.000 to Ch. 17.840 Design Ch.0.000 to Ch.10.840 AIIMS Bhusaula Golambar to Naubatpur Patna Ring Road section on EPC mode in the state of Bihar year 2021 22 Length 10.84
Widening of existing road to 4 lane with paved shoulder from Km 0.000 to Km 51.119 existing ch km 476.700 to km 523.530 51.119 Km of Tadipatri to Muddanur Bypass section of NH67 in the State of Andhra Pradesh on EPC mode under Annual Plan 2021 22
Improvement of Riding Quality of NH 707 A From Ch 0.00 to 52.180, Ch 61.750 to 70.750, Ch 72.900 to 79.350 and Km 83.000 to 127.000 in the State of Uttrakhand Under annual plan 2021-2022 N.H.(O) in the state of Uttarakhand ( Under EPC mode)
Construction of 3 no of Bypasses at Sheikhpura Jamui Khaira alongwith 1 no of realignment at Sikandra with pre construction activity total length 13 472 Km to two lane with PS standard along with U/S in N H 333A under EPC mode in State of Bihar
Construction and upgradation of existing 2 lane to 4 lane dual carriageway NH Standard from Pandach to Manigam of NH-1 (from existing chainage Km17.974 to Km29.792) as a part of Srinagar Ring Road Phase-IIA on EPC Mode under BMP in the UT of JandK
Construction of VUP including approaches near Naibag (blackspot ID No.GA-(02)-006) at Km. 485.345 on NH-66 in the state of Goa on EPC Mode under Road Safety Annual Plan 2024-25. Reg- Hiring of Vehicle for a period of 24 months for use of Assistant
Construction of cattle Underpass, 750.0 m in Length, 5.0 m in Height, and 300.0 m in Length. 5.0 m in Height On Road, MSH-09, Km 97.200 to Km 130.000 in Tahsil Nagbhid and Sindewahi in Chandrapur District in the State of Maharashtra on EPC Mode. Pro