Loading…
Loading…
25,859 results • Best match
Construction of 33 KV Line From 132 KV Talegram to 33/11 KV Sub-station Perfume Park in Distt.-Kannauj on Turn-key basis (Under Full Deposit Scheme)
Under Business Plan 2026-27, Work of Miscellaneous work for Protection of Substations on semi turn-key basis in the area of Electricity Distribution Division, Deoria and Gauribazar
1. Construction of Buildingless Sub Health Centre at DHEKIONI SC in Dibrugarh District under PM ABHIM for the FY 2021 22 under NHM Assam on Turn Key Basis.
work for protection of Distribution Transformers against Business Plan 2024-25 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDC, Aligarh
Other miscellaneous works under Business Plan 2024-25 under EDD-IInd, Mughalsarai 11 KV (work of replacement of corroded wire, cable, damaged VCB) (on semi turn-key basis)
CONSTRUCTION OF NEW 33 KV FEEDER EMANATING FROM UNDER CONSTRUCTION 132 KV PRIMARY SUBSTATION BHARAWAN, HARDOI TO 33/11 KV SUBSTATION ATRAULI, DISTRICT-HARDOI ON TURN-KEY BASIS
CONSTRUCTION OF NEW 11 KV UNDERGROUND LINE FOR INDEPENDENT 11 KV FEEDER FOR GIVING THE NEW CONNECTION OF 390 KVA LOAD ON TURN-KEY BASIS (FULL DEPOSIT WORK)
Protection of LT Lines and other miscellaneous works under the BP 2026-27 within the jurisdiction of EDD-Ist, Chandauli, at EDSD, Chandauli. (on Semi Turn-key basis)
Work of LT Line Protection and other miscellaneous works under the BP 2026-27 within the area of EDD-Chandauli, Mughalsarai and Sakaldiha.(on Semi Turn-key basis).
Construction of new 11 KV Feeder with VCB, 1 MVA Transformer in 33/11 KV Sub-Station Imaliya (Hamirpur) village masgaon and chilli sprinkalar irrigation project turn-key
Constructions of toilet outside Marshal Chamber, ante room and washroom located at ground floor of Annex Building in the premises of Telangana Legislative Assembly, Hyderabad (Turn Key Basis)
Revival/Renovation of T. Somalagudur L.I. Scheme on Tungabhadra River in Nandavaram (M) of Kurnool District on turn key basis and operation of the scheme for two years
Construction and commissioning on turn key basis of Neeladevipuram LI scheme on Nagavali River in Burja Mandal of Srikakulam District and operation of the scheme for two years
Providing Turn Key basis for Drinking Water Disinfection and maintained Water Quality Parameters as per SOP guidelines for water supply in 1 to 31 wards of Bobbili Municipality
Erection of 1 no 220 KV B+6 (TSP) Intermediate tower between Loc.No. 172 and 173 of 220 KV Dhone Gooty DC line on Semi turn key basis
Certain civil and sanitary works in Govt. Whip Chamber located at first floor of Old Council Building in the premises of Telangana Legislative Council, Hyderabad (Turn Key Basis)
Execution of Piped Water Supply Project with 5 years operation and maintenance to village Gobarjoda under Thakurmunda Block in the District of Mayurbhanj on turn key basis (NRuM)
Execution of Piped Water Supply Project with 5 years operation and maintenance to village Mata under Karanjia Block in the District of Mayurbhanj on turn key basis (JJM).
Execution of Piped Water Supply Project with 5 years operation and maintenance to village Dumuria under Karanjia Block in the District of Mayurbhanj on turn key basis (JJM).
Execution of Piped Water Supply Project with 5 years operation and maintenance to village Neduapal under karanjia Block in the District of Mayurbhanj on turn key basis (JJM)
Execution of Piped Water Supply Project with 5 years operation and maintenance to village Raitalia under Karanjia Block in the District of Mayurbhanj on turn key basis (JJM)
Execution of Piped Water Supply Project with 5 years operation and maintenance to village Biunria under Karanjia Block in the District of Mayurbhanj on turn key basis (JJM)
Installation of 33 KV Indoor GIS Switchgear Panel by Extending Existing Control Room at Bamunara 132/33 KV Sub-Station under Durgapur Area Office on turn-key basis
SUPPLY,CONSTRUCTION,TESTING AND COMMISSIONING OF 4.55 KM HT AERIAL BUNCHED CABLES AT VARIOUS LOCATIONS UNDER ELECTRICAL SECTION, KADACHIRA UNDER RAPDRP KANNUR TOWN SCHEME ON TURN KEY BASIS
SUPPLY, CONSTRUCTION,TESTING AND COMMISSIONING OF 5 KM HT AERIAL BUNCHED CABLES FROM THRIKKAPALAM TO KOTTOM UNDER ELECTRICAL SECTION , PERLASSERY UNDER RAPDRP SCHEME, KANNUR ON TURN KEY BASIS
SHIFTING OF 33 KV LINES (M/S VISHAKHA, GANPATI and HARCHANDPUR) PASSING FROM THE PREMISES OF M/S OMAX AUTOS LTD., DISTRICT-RAEBARELI ON SEMI TURN-KEY BASIS
Work of electrification for Providing new 3 MVA connection to Rajkiya Allopath Medical Collage, Jaunpur on Semi turn-Key basis in deposit work under EE, EDD-IV, Jaunpur
Rectify the discrepancies of ILFS electrification work as inspected by NQM, RQM, TPIA, PMA ELECTRICAL SAFETY department in different village under EDC-I, Moradabad on TURN KEY BASIS.
Turn Key Contract For Design, Engineering And Construction Of New 33 Kv Lines At Five (05) Locations Under Electric Supply Circle, Muzaffarpur, Nbpdclunder O&m Capital Head Scheme.
EPC TWG AT MADURAI
EPC SOLAR POWER PLANT
Design, Engineering, Procurement and Construction including hydraulic testing, satisfactory trials and commissioning of 2 MLD Capacity Sewage Treatment Plant (STP) based on Sequencing Batch Reactor (SBR) Technology followed by Ultra Filtration Techno
Rate contract for Supply Erection ,Testing and Commissioning of 1 km 11KV line on 9mtrs PCC Poles with Rabbit conductor on Turn Key Basis with in the Jurisdiction of EMRE Division II Jammu
Construction of PRATYAKSHA KAR BHAWAN along with Residential Complex (consisting of Type-II, III and IV Quarters) and MSTU setup at Kheora Bangar, Kanpur (UP) on EPC Basis
AS PER NIT
Refer to BQO
CONSTRUCTION OF INTERIOR WORKS FOR SETTING UP COE SIZ AT STPI IMPHAL
Please refer Tender documents.
Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector -V, Salt Lake, Kolkata including Civil Horticulture works/services on EPC basis. Subwork/Packages: Providing one Petrol Inspection Vehicle (Commercial) including Driver for use of field officers of office of the EE&SM(C-II), Rajarhat, Kolkata.
RFP For Consultancy Services for AE for Supervision of Rehabilitation and widening work for 2Lane with P/S of Existing NH 80 Alignment from 1. km 70.150 to Km 121.025 and 2. Km 132.895 to Km 190.150 in the State of Bihar through an EPC Contract.
Refer to EPC Schedule
Construction of Composite Regional Centre for Skill Development Rehabilitations and Empowerment of Persons with Disabilities at Davanagere. SH 1: (a) Building portion i/c internal water supply, sanitary installations, external service connections, UG ... in EPC mode (Design ... in EPC mode (Design ...
(1) Construction of 2280.30 Km Lateral & Axial Roads in the State of Punjab and Rajasthan along the Indo-Pakistan Border (EPC Mode). (SH: Construction of Lateral Road (Length: 110.28 Km) along Indo-Pak Border in Amritsar Sector under Punjab Frontier ... ( EPC Mode ). ...
RFP for Development of Jewar Airport to Ganga Expressway Via Bulandshahr Link Expressway Package-I From Bhaipur Brahman Dist. Gautam Buddh Nagar To Bichaula Dist. Bulandshahr Km 0 to Km 24.467 in the state of Uttar Pradesh on EPC Basis.
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of Two(02) Nos. Of 2x10 Mva, 33/11 Kv New Pss In Madhepura District Along With Associated 33 Kv And 11 Kv Lines Under State Plan.