Construction and commissioning of Peddapurappadu LI scheme on Yandamuru Medium Drain in Karapa Mandal of East Godavari District on turn key basis including maintenance of the scheme for two years
Erection of 01 No. 33KV feeder bay at 132KVSS Tirupathi for arranging 33KV dedicated Power supply to Backup SLDCbuilding from 132KVSS Tirupathi in Kadapa Zone on Semi turn key basis
Supply, Installation, commissioning of 900Nos. 4G AMR Modems with Three years warranty to the HT services in 5 Circles (Srikakulam, Vizianagaram, Visakhapatnam, Rajamahendravaram & Eluru) of APEPDCL on Turn-key basis
Providing additional 1x10MVA, 110/11kV transformer at 110kV Mugulihal Substation in Yaragatti Taluk, Belagavi District.Including supply of equipments / materials, erection, civil works, testing and commissioning on Partial Turn Key Basis.
Construction of Morand and Ganjal Dams with pressurized pipe micro irrigation system for irrigating 48874 ha. (ICA) up to 2.5 chak on Turn Key basis as detailed scope of work.
Providing,Erection/Installation,commissioning of New Instrument air compressors (IAC) of M/s Chicago Pneumatics make (Model-HX1T-25 N1) for U-3&4 AHP Dry System (Turn Key Project).
Execution of Piped Water Supply Project with 5 years operation and maintenance to village Mulapala under Thakurmunda Block in the District of Mayurbhanj on turn key basis (WATER SCARCITY-BASUDHA)
Construction of 33 KV Independent Feeder from 220 KV Cant Substation to Dr. Rajendra Prasad National Law University Near IIIT Jhawla, Prayagraj Under EUDD-Bamrauli on Semi Turn Key Basis
Supply, Installation, Testing, Commissioning and proving of static type, Pit-less, Electronic Weigh Bridge of 40 MTs capacity to be installed on turn key basis (including Civil Engineering work) for
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning 15 Nos. Of New 33 Kv Line In Various Locations In North Bihar Power Distribution Co. Ltd. Under State Plan
Upgradation of Electrical Infrastructures at Spituk, MAtho, Phyang Monasteries, Imam BAra Chushot Yokma and Chushot Gongma Stok Palace and Phyang MAsjid of LEh district under PMDP on Turn Key Basis
Rate contract Supply Erection Testing and Commissioning of 1 km LT linesingle phase two phase and three phase on 8 mtrs PCC Poles with Rabbit conductor on Turn Key Basis
11 KV Chandan Pur Feeder Bifurcation emanating from 33/11 KV S/S Pachapadawa against Business Plan 2017-18 on the Semi Turn-key basic under Electricity Distribution Circle, Balrampur
11 KV Pachpadwa Town Feeder Bifurcation emanating from 33/11 KV S/S Pachapadwa against Business Plan 2017-18 on the Semi Turn-key basic under Electricity Distribution Circle, Balrampur
11 KV Basant Pur Feeder Bifurcation emanating from 33/11 KV S/S Pachapadwa against Business Plan 2017-18 on the Semi Turn-key basic under Electricity Distribution Circle, Balrampur
Replacement and maintenance of 33 KV Line and Construction of 11/0.4 KV of 25 KVA S/S and Repairing of line on semi turn-key basis under EDC, Balrampur
Supply,Erection and Dismantling of 33 KV,11 KV,LT line,11Kv,6.35 KV SS and 33 KV SS Harsani Fanta inside acquired land by BLMCL under AEN CSD-I and AEN CSD-II ,JdVVNL, Barmer on turn-key basis and 33 KV line and UG cable work under AEN Rural BMR
SUPPLY OF EPC FOR GC / AS PER TENDER
UPG OF EXIS BR (PERU) AT KM 27.595 BY 65 M SPAN PMT BR, EXIS 60.45 M SPAN RCC T BEAM BR (DHUNARI) AT KM 48.846 BY CONST 65 M SPAN PMT BR, AND EXIS 365.00 M SPAN RCC T BEAM BR (UJH) AT KM 54.380 BY CONST 385 M PMT BR PMT BR ON D-U ROAD ON EPC MODE
Conducting survey using NSV for the work Strengthening of Nizamabad-Jagdalpur Section of NH63 from km 136/8 to139/0, 140/0 to 144/0, 145/0 to 147/0, 156/0 to 157/0, 163/0 to 164/0, 166/0 to 168/0, 170/0 to 173/4 and 174/2 to 180/6 on EPC mode 3rdCall
Construction of Culture Centre consisting main building ( B plus G plus 3) and Auditorium building (B plus G plus 1) including development works i.e. internal Roads with footpath, external sewerage, water supply, storm water drain, rain water ... on EPC (mode-II) ... EPC( mode -II)
Construction of Lateral Roads in the state of Punjab and Rajasthan along the Indo-Pak Border (SH: Lateral Road , Bikaner Sector Package-II from BP No. 438/M to 474/3 and Lateral Road North Jaislamer Sector, Package-V(a) fro BP No. 474/3 to 518/M ... on EPC mode ). ...
Construction of New Buildind Project at Central University of South Bihar, Panchanpur, Gaya on EPC mode. SH:- Providing Fixing shutter in opening above wardorbes, GRC Jali in corridor M.S. Railing at mid landing (all floors) of Type-III & IV & M.S. ladder on roof for cleaning of water tank (Type-III & IV, Hostel A&B, Mess Block, Library, Food court & Health
Shifting of existing HT/LT lines at Tihra for safe operation for Paragliding at Sujanpur Tihra in ES Sujanpur. T.S. No. (W.B.S.) ON PARTIAL TURN KEY BASIS.
Investigation, Detail Design, Construction of smart trunk infrastructure with Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power & ICT, Reuse waterline, Pedestrain tracks, Cycle tracks, Avevue Plantation & ... on EPC Basis .
Design, construction, testing and commissioning of 1 No. 1.5 MLD Sewage Treatment Plant based on MBBR Technology including comprehensive operation & maintenance for a period of 3 years (after successful trial run of 2 months) on EPC basis in SCCL township at Centenary colony, RG-III Area, Godavarikhani, Peddapalli Dist., Telangana State.
Consultancy Services for Supervision of Construction of ROB and Approaches on NH 165 Bypass in the state of Andhra Pradesh on EPC Basis at Railway Km 4 of 0 to1 and at NH Km 10 of 906 and at Railway Km 74 of 8to 9 at NH Km 46 of 430
P.R. to Sinnar- Pandhurli - Dhamangaon - Ghoti- Trimbakeshwar Road NH- 160 A in Km.53/600 to 58/00, Km.71/500 to 72/500, Km.78/800 to 81/500 ,Km. 90/00 to 94/400 Section Ghoti- Pegalwadi Phata) in the State of Maharashtra on EPC basis 2nd call
Providing services of Computer Operator and Office Assistant under the Office of The Executive Engineer (E), ECGC, Mumbai-69. Chargeable to: Contingencies of Construction of OTM Infrastructure for Indian Coast Guard at Worli, Mumbai Including all ... ( EPC ) ... (EPC) Basis .
Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Alternation of existing 1st Floor of E-Block with construction of attached toilet and minor alternation as required by client department).
Site Development and the Construction of Girls & Boys Hostels at the Extension Campus at NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC Basis. (SH : Construction of Profile Shed above STP Plant, toe wall to barricade the area and temporary boundary wall for director residence).
Construction of 84 nos T III S7 28 nos T IV and 28 nos T V S7 Quarters including Internal EI and Fans Fire Fighting Fire Alarm System and Development work at AIIMS Raebareli UP on EPC basis Providing Services of Semiskilled person for Raebareli Electrical Sub division RESD Campus Raebareli
Engineering, Design and Construction of Viaduct Length 38.40 kms (including 4.33 Kms of Double Decker 4 Lane Flyover cum Metro Viaduct) 01Nos. Underground metro station and 32 Nos Elevated Metro stations, etc. all as specified on EPC basis for Phase-1 of Vijayawada Metro Rail, at Vijayawada Andhra Pradesh, India.
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of MS Pipe Rising Main from IPS-03 to Malur and Other Industrial Areas, Land Acquisition, 5 years of O&M for Providing & supplying fresh water to ... on EPC Basis . ...
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of Five (05) Nos. Of 2x10 Mva, 33/11 Kv New Pss In Kishanganj District Along With Associated 33 Kv And 11 Kv Lines Under State Plan.
Construction of External Development works incl circulating area,approach rd,compound wall and pids,signages,IT security and other telecom works incl integrated testing and commissioning for Tumkur on EPC mod
C23 Design Construction (Earthwork, Bridges,Station Buildings, RW etc) from km 29.68 to km 49.70 and from km 55.60 to km 61.50,Connectivities to IR network from New Patli to Patli and Sultanpur including modifications/civil works at Sultanpur
Selection of an EPC Contractor for turnkey implementation of an AI_based voice_enabled communication and broadcasting system with audio_visual advisory devices for farmers across APMCs of Madhya Pradesh for 24 months IInd call
Providing Multi Villages Piped Water Supply Scheme for Haroli Constituency in Haroli Block Distt. Una (H.P.) Phase-2nd (UNDER JAL JEEVAN MISSION) in single package on Turn key job as per NIT
DRAWING HT ABC 120 SQ MM ON TURN KEY BASIS OF 5.487 KM UNDER ELECTRICAL DN,ERNAKULAM AMD TRIPUNITHURA
Construction of Basement plus Ground Floor plus 10 Storied Building of State of the Art, Director General, GSI Office at Plot No. GN-40, Sector - V, Salt Lake, Kolkata including Civil, Electrical and Mechanical and Horticulture works/services on EPC Basis....
C/o Basement plus Ground floor plus 10 storied building for State of the Art, DG, GSI office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata i/c Civil, Elect, Mechanical and Horticulture works/services on EPC basis. Subwork/Packages: Providing one number inspect vehicle (Commercial) i/c driver for office use under o/o the EE&SM(C-II), Rajarhat, CPWD, Kolkata
Construction of Basement plus Ground Floor plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata including Civil, Electrical & Mechanical and Horticulture works/services on EPC basis....
Renovation of WTA of Pergela Major State R.L.I. on Turn Key basis, Mouza- Pergela, JL No.- 09, Plot No.- 1247 under Bundwan Block in Purulia district under Core Sector Programme for the F.Y. 2024-25
Installation of KARUMAMA Mini River Lift Irrigation Scheme (SOLAR Operated) on Turn Key basis under Jhalda-II Block in Purulia district under Sarasari Mukhamantri (Core Sector) Programme Sub-Project - WI242522249M001) for the F.Y. 2024-25
C/o Basement, Ground floor, 10 storied bldg for State of the Art, DG, GSI office at Plot No. GN-40, Sec-V, Salt Lake, Kolkata i/c Civil, Elect, Mechanical and Horticulture works/services on EPC basis. Subwork/Packages: Providing the services of Computer operator at the O/o the Artchitect, SDG-Kolkata, CPWD, Kolkata and Office Boy at O/o the EE(P)I, SDG-Kolkata on Contract Basis
Periodical Renewal work on NH 503 Extn. in km.19.00 to 28.00 in the State of Himachal Pradesh on EPC mode.
Improvement including Widening of Agia Medhipara Phulbari Tura Road Portion from 67.600 Km to 100.200 Km 32.60 KM on EPC mode.
DESIGN AND CONSTRUCTION OF BOW STRING GIRDER RAILWAY BRIDGE AT ROB 107A 2T AND ROB 112 IN DISTRICT AYODHYA (EPC MODE)
RFP for Selection of agency for Biomining of legacy waste located on site adjacent to Connemara market Palayam on EPC mode