Loading…
Loading…
25,860 results • Best match
Construction work of SAS Based 220kV GIS Substation (2x160MVA) at Existing 132kV AIS Substation Sector-62, Noida On Turn-Key Basis
Construction of Combined Administrative Building for Canara Bank at Financial Hub in Rajarhat, New Town, Kolkata including Internal Water Supply, Sanitary Installation, Internal Road, Drainage, Internal Electrical Installations, Lifts, Fire Fighting, ... on EPC basis . ...
Construction of Basement Plus Ground Floor plus 10 Storied Building for State of the Art Director General GSI Office at Plot No GN 40 Sector V Salt Lake Kolkata including Civil Electrical and Mechanical and Horticulture works services on EPC basis Subwork/Packages: Providing services of Computer Operator at the O o the Architect under o o the SDG Kolkata CPWD Kolkata and office Boy at office of the EE P I under SDG Kolkata CPWD Kolkata on contract basis
BLS Euipments on Turn key Base
Single package turn key job basis
Construction of 8.0 km 33kV Single Circuit line with 3x300Sqmm UG Cable and 120sqmm, AAAC Covered Conductor from 110kV substation Trikkodithanam to proposed 33kV substation site at KINFRA, Kunnanthanam, under Hybrid Model Turn Key basis
Construction Of 9 Nos Of 11kv Link Lines From 110/11 Kv Hebbal Sub Station For A Distance Of 40 Km In Lokapur Sub Division Of Mudhol Division On Total Turn Key And Lumpsum Basis.
Construction of 02 nos of 11kV link lines from 110/11 KV Dastikoppa Station for a distance of 0.45 RKm in Khalaghatagi sub divisions of Dharwad Rural divisiom on total turn key and lumpsum basis.
Construction Of 02 Nos Of 11kv Link Lines From 33/11kv Saptasagar And Sankonatti Sub Station For A Distance Of 21.75km In Athani Sub Division Of Athani Division On Total Turn Key And Lumpsum Basis
Creation Of 12 Nos Of 11kv Link Lines From Variou Substation To Bifurcate The Load For A Distance Of 65.9 Km In Hangal Sub Division Of Haveri Division On Total Turn Key And Lumpsum Basis.
Construction Of 04 Nos Of 11kv Link Lines From 110kv Gokak And 33kv Khanagaon Sub Station For A Distance Of 20km In Gokak Sub Division Of Ghataprabha Division On Total Turn Key And Lumpsum Basis
Construction Of 03 Nos Of 11kv Link Lines From 110kv Gosbal Sub Station For A Distance Of 19.4 Km In Mudalagi And Gokak Sub Division Of Ghataprabha Division On Total Turn Key And Lumpsum Basis
Construction of 03 nos of 11kV link lines for a distance of 10.62 Rkms from110/11KV Nippani and 33/11 KV Benadi sub stations in nippani subdivision of Chikkodi division on total turn key basis.
Construction Of 03 Nos Of 11kv Link Lines From 220kv And 110kv Ghataprabha Sub Station For A Distance Of 12.4 Km In Ghataprabha Sub Division Of Ghataprabha Division On Total Turn Key And Lumpsum Basis
Work for shifting of 11 KV and L.T. Lines, transformers and other associated work from NH-170 to Bahua (Road widening) and its energisation under Semi Turn Key Basis under jurisdiction of EDD-I Fatehpur
Carrying out various electric works on Semi Turn-key Basis for electrification and strengthening of Infrastructure due to extension of Nagar Panchayt in area of EDD Kheragarh, under the jurisdiction of SE, EDC-1 AGRA.
Construction of Sanitary complex Toilet cum bathroom 10 Units in the District of Latehar under D W and S Division, Latehar for the year 2024-25 TURN KEY BASIS Gr no. U H S Fulasu
Work for Line Shifting of 33 KV, 11 KV, LT Lines and Transformers during road widening of Verma Tiraha to ITI Road Culvert under semi turn key basis under jurisdiction of EE, EDD-I, Fatehpur.
The work for Replacement of 11Kv VCB Pannel at 33/11 KV S/S Kashi, M.E.S, Pannalal Park and Ledhupur Under EE, UECD-II, Varanasi in Business Plan 2025-26 on Semi Turn Key Basis
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/70M-8
Develop and Supply Of Advance Modular Operation Theater (Turn Key) and installation, fitting and commissioning of medical gas pipe line at Maa Meenataai Thackeray Hospital, Shivaji Nagar for public health department, thane municipal corporation,Thane
EDD-IIIrd, Sakaldiha in the work plan of Rs. 20.00 crore allocated for the work of system strengthening under the Additional Business Plan 2023-24 in EDSD-I, III, Kamalpur. On Semi-Turn-Key Basis.
Fixing of Rate Contract for Creation of 250, 400 and 630 KVA Sub Station Under the jurisdiction of JPDCL Electric Division-I, Parade, Jammu for the financial year 2023-24 on partial Turn Key basis
CONSTRUCTION OF 11 KV NEW FEEDER FROM 33/11 KV SUBSTATION BUDHUDUPUR TO SHARE THE LOAD OF 11 KV RAILWAY FEEDER FROM 132/33/11 KV SUBSTATION SAHAGANJ DIST JAUNPUR ON SEMI TURN KEY BASIS
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/70M-7
Develop and Supply of Advance Modular Operation Theater (Turn Key) with operation theater equipment, operation theater passage and installation, fitting and commissioning of medical gas pipe line inside Operation Theater at Kopri Maternity for TMC
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/90M-11
Construction of Retrofitting of House Connection FHTC Villages Rural Pipe Water Supply Scheme on Turn Key Basis under D.W. and S. D. Hazaribag for the Year 2021-22 JJM-Head Group HZB RETROFITTING CHOUPARAN 03
For the Work of 11 KV Line Construction/Strengthing, Installation of New T/Fs and other associated works Head on Buisness Plan 2023-24 VARSHA RITU on Semi Turn Key Basis under EDC-1 Agra
Construction of Sanitary complex Toilet cum bathroom 10 Units in the District of Latehar under D W and S Division, Latehar for the year 2024-25 TURN KEY BASIS Gr no. U M S Hehegara
CONSTRUCTION OF 33 KV LINK LINE FROM 33/11 KV S/S AWAJAPUR TO 33/11 KV S/S KAMALPUR FOR REDUCING OVERLOAD OF 33 KV LINE SAKALDIHA DIST - CHANDAULI ON SEMI TURN-KEY BASIS
Changing of 88 nos Tubewells of 32 mm dia. Rotten Riser Pipe, Connecting rod, C.I Cylinder etc. on turn key basis for the year 2024-25 in different block under DWSD, Chaibasa. (CBSA/RRP- 01)
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/70M-1
Design, Supply, Installation, Testing and Commissioning of (All In One) COMBINED SEWAGE EFFLUENT TREATMENT PLANT OF CAPACITY 30 KLD. complete with all required Civil works , electro-mechanical equipments on turn-key basis at SDH Bishnah
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/70M-4
Operation and Maintenance for 02 years of Harsud Micro Lift Irrigation Scheme including its distribution network by pipeline of Culturable Command Area (CCA) 5648 ha on Turn-key basis as per detailed scope of work.
Construction of High-Level Bridge for submergence area of Berkheda Medium Irrigation Project, High level Bridge connecting Khojakua to Shyadi Road (On local nalla), at Vill. Kadwal,Tehsil Gandhwani Distt. Dhar on turn key basis.
Operation and maintenance of Khargone Lift Canal Scheme including its distribution network by pipe line of Culturable Command area (CCA) 25,000 ha. on Turn-Key Basis for 1 year as per detailed scope of work
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/70M-2
RUNNING WATER SUPPLY THROUGH 1 HP SUBMERSIBLE MOTOR PUMP IN BLOCK BIRNI, BAGODAR AND GAWAN ANGANBARI CENTRE UNDER DWSD NO-2, GIRIDIH FOR THE YEAR 2025-26 ON TURN KEY BASIS. (DMFT FUND) GIR-6
Work of 33KV protection and other miscellaneous works (work of strentghning and replacing of 33KV VCB, CT, underground cable etc.) on semi turn-key basis under B.P. 2025-26 in the area of EDD-Sakaldiha.
Design, Engineering, Construction, Fabrication, Supply, Erection, Trial run, and Commissioning of 2x100MVA,220KV/33KV substation on Turn Key basis along with maintenance of substation during Defect Liability Period for 4 years at Gevra Open Project
The work of undergrounding of electric lines of Maa Vindhyavaisni Dham at New VIP Road , Old VIP Road, Kotwali Gali, Ghat Road and Mandir Parisar in Mirzapur Under the deposit scheme on Turn-key Basis
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/70M-9
Construction of 11 KV Line and installation of 5 MVA Power Transformer for release of 1500 KW connection Regional Manager Prayag. Depot, Rajapur, Prayagraj on Semi turn key Basis Under Electricity Urban Distribution Division Mayohall.
Construction of Sanitary complex Toilet cum bathroom 10 Units in the District of Latehar under D W and S Division, Latehar for the year 2024-25 TURN KEY BASIS Gr no. U H S Rol
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/90M-10
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/70M-3
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep drilled tube well with installation of India mark II with drain, platform etc. on Turn Key Basis Group no. -DHN/DT/70M-6
Supply, Installation and Commissioning of ACB 1600 Amp. (1 No.) in Capacitor Bank Panel and Cubical Panel (1 No.) of Lighting for Adminstrative Block -ON TURN KEY BASIS- (details as per specifications in Annexure -A-)