Quarterly maintenance for attending normal and emergent water supply and sanitary repairs works in the premises of Council Building at Telangana Legisltive Council Hyderabad for 2nd Quarter of the financial year 2024-25 TURN KEY BASIS
Quarterly maintenance for attending normal and emergent water supply and sanitary repairs works in the premises of Assembly Buildings at Telangana Legisltive Assembly Hyderabad for 2nd Quarter of the financial year 2024-25 TURN KEY BASIS
Providing marble polish colouring to the entire quarter painting to doors providing kitchen cup boards and other divil sanitary repairs to quarters No.501 at MS-II Block in Old MLAs Quarters Hyderguda Hyderabad - Turn key
Providing of false ceiling and water proofing in quarter no.805, 804, and vitrified tiles and flooring sanitary repairs in Quarter No.807 in MS-I Block at Old MLA Quarters Hydergada Hyderabad - Turn key bases
Providing water supply line from the Bore at Gate No 4 & 5 to the existing supply line to lawns at back side of the main building in the premises of the High Court , Hyderabad Turn Key
Providing Concrete Flooring, Rain water Harvesting pit behind Administration building & providing Gypsum Board False ceiling at Asst Secretary Rooms at 3rd floor of Adiministration building in Premises of TSLA, public Gardens, Hyderabad (TURN-KEY)-2nd call
SR for modification of canteen toilet and attending the balance work in canteen and providing the wooden cupboards and pigeon net in qtr no 506 MS I at Old MLA qtr, Hyderguda, Hyd Turn Key Basis
Removing the damaged sunshade & replacing with GI sheet and providing rain water drain pipes from terrace in the open to sky area of the Red Building, located in the premises of High Court, Hyderabad.(Turn key)
Tender for SOP to LWSS Bharoli in GP Brall and Dharotin GP Sheel from existing 250 kVA, 22/0.4 kV Sub-Station at Jallow in Electrical Section Sheelghat under ESD HPSEBL, Jubbal. (SEMI TURN KEY BASIS)
Supply, testing, erection and commissioning of 4 nos. 33/11 KV Sub-stations, 33 KV and 11 KV line under Barmer Zone in the jurisdiction of Jodhpur Discom as per governing specification on Turn-key basis
Supply, testing, erection and commissioning of 7 nos. 33/11 KV Sub-stations, 33 KV and 11 KV line under Bikaner Zone in the jurisdiction of Jodhpur Discom as per governing specification on Turn-key basis
Replacement of Rotten Riser Pipe of 32 mm dia Connecting rods C.I Cylinders wherever required etc. under D.W. S. Division No-2, Giridih, on Turn Key Basis for the Year 2023-24 GROUP NO RRP-05
Replacement of Rotten Riser Pipe of 32 mm dia Connecting rods C.I Cylinders wherever required etc. under D.W. S. Division No-2, Giridih, on Turn Key Basis for the Year 2023-24 GROUP NO RRP-03
Supply Erection Testing Commissioning for Replacement of HT Cable of BSNL BTS Site at Mahamaya Jammu under the jurisdiction of Electric Division Div-I (JPDCL) Jammu for the financial year 2021-22 on Turn Key basis
Providing RO Purified drinking Systems Reverse Osmosis (RO) 250LPH water Purification Plant on Turn key Basis at Allasani Peddanna Municipal PRimary School in 6th ward of Tuni Municipality under MPLADS funds of the Hon'ble M.P.Sri.Thota Narasimhamgaru.
Supply, erection and commissioning of 03 Nos 33 KV feeder bays at various EHT sub-stations for bifurcation of overloaded 33 KV feeder in APSPDCL in O and M Circle, Kurnool on semi turn key basis
Modification of existing 132 KV Kadapa Vontimitta (SC/SC) line for improving vertical ground clearance at SIddavatam - Nitya Pooja kona road in between Loc. No. 802-803 in YSR Kadapa district on semi turn key basis.
Supply, erection and commissioning of 03 Nos 33 KV feeder bays at various EHT sub-stations for bifurcation of overloaded 33 KV feeder in APSPDCL in O and M Circle, Kurnool on semi turn key basis
Supply, erection and commissioning of 03 Nos 33 KV feeder bays at various EHT sub-stations for bifurcation of overloaded 33 KV feeder in APSPDCL in O and M Circle, Kurnool on semi turn key basis
Erection of 05 Nos 33 KV feeder bay extensions at various EHT sub-stations for bifurcation of overloaded 33 KV feeders in APSPDCL in Nandyal division, O and M circle, Kurnool on Semi turn key basis
Modification of existing 132 KV Kadapa Vontimitta (SC/SC) line for improving vertical ground clearance at SIddavatam - Nitya Pooja kona road in between Loc. No. 802-803 in YSR Kadapa district on semi turn key basis.
Design, manufacture, supply, erection, testing and commissioning of 5Nos of 500 MVA, 400/230KV ICT at Sriperumbudur 400/230-110 KV SS, Thiruvalam 400/230kV SS and K.R Thoppur 400/230-110kV SS on Turn key.
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of 2x10 Mva 33/11 Kv Containerized Gis Substation (e-house) At 03 Location In Jurisdiction Of North Bihar Power Distribution Co. Ltd. Under State Plan
Construction of 33KV Double Circuit line to Connect 33/11 KV Rural and 33/11 KV Itwa Tahsil head quarter under ESWD, Basti. on Turn key Basis under business plan Year 2017-18 under ESWD-Basti.
Supply and Installation of Single Phase Two Wire Static Electronic Energy Meter 5-30Amp. DLMS type with Box at the premises of unmetered rural consumers in various Distribution Divisions of Lucknow Zone on turn-key basis
OPTHALMIC OPERATING UNIT ON TURNKEY BASIS, OPTHALMIC IMAGING AND DIGNOSTIC UNIT ON TURNKEY BASIS, Revolving Chair, Autoclave Drum, Table
Design, construction, testing and commissioning of Office building with data centre (Uptime Institute Tier-IV Certified) for Punjab national bank at plot no 84, sector 18, Gurugram, Haryana including all civil & MEP services, horticulture and ... on EPC basis . ...
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of One(01) Nos. Of 2x10 Mva, 33/11 Kv New Pss At Jai Prakash College Campus , Block -chapra Sadar Along With Associated 33 Kv And 11 Kv Lines In Chapra District And Three (03) Nos. Of New 33 Kv Line In Chapra Circle
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (06Nos) different locations in District Udhampur on Turnkey Basis (EPC) under
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (11Nos) different locations in District Udhampur on Turnkey Basis (EPC) under
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (07 Nos) different locations in District Rajouri on Turnkey Basis (EPC)
EPC of 30 numbers Photovoltaic LED Street Light Poles 5m height above FGL on turnkey basis at various sites in Amba Mamring Gram Panchayat Unit Pakyong Bac East Sikkim 737106 under CSR Project of West Bengal State Office
Deep Drilling of 125 mm dia Bore Hole by using ODEX method including providing, installation, testing, commissioning of submersible pump set at Tourist Reception Centre (TRC) in District Poonch on Turnkey Basis (EPC) under UT Capex (2026-27)
Construction of R.C.C Aquaduct at R.D 3000 meter of Left Bank Canal of Tillar Dam on Turn key basis near village Ghanikhedi , tehsil Agar Distt. Agar Malwa (M.P.) and including survey, geological investigation etc. as per detailed scope of
Construction of Administrative Block G 1 Academic Amenities Bllock G 1 and Classrooms and Laboratories G 2 and Recreation Block G 1 Main Gate Electric Room for NIT Uttarakhand at Srinagar Garhwal Phase II including maintenance of three years on EPC Basis ... on EPC Basis SH ...
Construction of Administrative Block G 1 Academic Amenities Block G 1 and Classrooms and Laboratories G 2 and Recreation Block G 1 Main Gate Electric room for NIT Uttarakhand at Srinagar Garhwal Phase-II including maintenance of three years on EPC basis ... on EPC basis SH ...
Construction of Administrative Block G 1 Academic Amenities Block G 1 and Classrooms and Laboratories G 2 and Recreation Block G 1 Main Gate Electric Room for NIT Uttarakhand at Srinagar Garhwal Phase II including maintenance of three years on EPC Basis ... on EPC Basis SH ...
Construction of Lateral Roads in the state of Punjab and Rajasthan along the Indo-Pakistan Border (SH: Lateral Roads, Bikaner Sector Package-II from BP No. 438/M to 474/3 and Lateral Road North Jaisalmer Sector, Package-V(a) from BP no. 474/3 to ... on EPC mode ). ...
Widening to 2 (Two) Lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I in the State of Nagaland on EPC mode
Contractors All Risk and Professional Liability insurance policy for the Project of Major Upgradation Redevelopment of Katpadi Railway Station Katpadi Tamil Nadu on EPC Mode retender
Construction of Syphon/ Barrel off taking from TRC of 8mw Unit PH-II to feed Kashmir canal on R/S of Madhopur Headwork on EPC Mode
Strengthening from km 0/000 to km 5/920 in NH 966B in the State of Kerala under Annual plan 2022-23 on EPC mode(RT)
Redevelopment of Carriageway, Footpath, Vending Zone, Covering ROW within ABD area of Aligarh Smart City (CW-12,13,14,15,16,18,19 and 24) on EPC mode (Package-3) At Aligarh
Construction of Grade Separator at Km 51.2 of NH 532 (Cuddalore Vridhachalam Salem road) in the State of Tamil Nadu on Engineering Procurement Construction (EPC) Mode
Construction of Pre-Fab Steel Structure Terminal Building, Pre-Engineered ATC Tower, Pre-Engineered Fire Station and other associated Buildings at Birpur Airport on EPC Mode
Strengthening work from Chainage Km 200.000 to Km. 232.000 on NH-119 (New 534) under NH(O) 2020-21 in the state of Uttarakhandon EPC mode.
Widening and Strengthening to 2lane PS from 0.00 to 40.00 (Dhaugaon Podamari section )of NH 326 in the in the state of Odisha on EPC Mode
Construction of Pre-Fab Steel Structure Terminal Building, Pre-Engineered ATC Tower, Pre-Engineered Fire Station and other associated Buildings at Saharsa Airport on EPC Mode.
Market Area Upgradation Phase-2 under Smart City Mission on EPC mode contract with operation and maintenance of one year after one year defect liability period.
Construction of Intermediate Lane of Pango to Jorging Road Design Length 40.00 Km, Pkg I, Greenfield Alignment in the State of Arunachal Pradesh on EPC mode