Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Domchanch Panchayat Parho Village Jorasimar under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22
Construction of Mini RWSS with Solar pump RCC foundation and galvanized tubular structure 5 Years OM etc all complete job in Block Jainagar Panchayat Hirodih Village Simratand under JJM under D. W. and S Div JMT on TURN KEY BASIS for 2021-22.
Construction of Mini RPWS Scheme with RCC Water Tank, DC Solar Motor pump and 5 Years OM etc all complete job in Block Koderma Panchayat Jarga Village Jarga under D.W. and S. Div JMT on TURN KEY BASIS for the year 2021-22.
Carrying out various electric works on Turn key Basis for protection of various capacity DT (630, 400, 250 KVA TF) and other LT protection works in the area of EE, EUDD-I, II, III, Mathura under the jurisdiction of SE, EUDC, Mathura
Installation and Commissioning of 10 nos units of Solar Cool Chamber of 5 MT capacity including construction of Base Fencing Yard etc and providing Plastic Crates at different locations in the state of Tripura on Turn Key basis for storing of Horticu
Construction of Mini RWSS with Solar pump RCC foundation and galvanized tubular structure 5 Years OM etc all complete job in Block Chandwara Panchayat Bendi Village Ratansot under JJM under D. W. and S Div JMT on TURN KEY BASIS for 2021-22.
Construction of Mini RWSS with Solar pump RCC foundation and galvanized tubular structure 5 Yrs OM etc all complete job in Block Satgawan Panchayat Kothiyar Village Kothiyar PartA under JJM under D. W. and S DivJMT on TURN KEY BASIS for 2021-22
Construction of Cluster wise Solar Energy Based Mini Rural Pipe Water Supply Scheme in Simdega District which are not included in MVS Other schemes to supply water and house connection with 05 Years O and M works on Turn Key Basis Cluster 14
Construction of SVS Cluster based on Solar Energy Based Mini RWSS in different blocks of Koderma District House Connection and 5 year OM on Turn key basis under D W and S Division Jhumritelaiya for the year 2022-23 (SVS Cluster 02A)
Construction of SVS Cluster based on Solar Energy Based Mini RWSS in different blocks of Koderma District House Connection and 5 year OM on Turn key basis under D W and S Division Jhumritelaiya for the year 2022-23 (SVS Cluster 01A)
Supply Erection Testing and Commissioning of 1No220/132kV 100MVA Auto Transformer at Dr. NTTPS Switchyard and erection of 1no 132kv Bay at Bhavanipuram 132/33kV SS and Connected line to facilitate 132Kv Connectivity to Bhavanipuram SS in NTR Dt on ... on Turn key basis
Manufacture, Supply, Delivery, Installation, Testing and Commissioning of Liquefied Petroleum Gas (LPG) based Scientific Crematorium furnace including all units such as Wet Scrubber, Chimney, Manifold arrangements, LPG Cylinders etc., in Seven ULBs ... on Turn -key ... Turn- key basis
Manning ,operation and maintenance of Nellimarla,Ramatheerthalu Head Water Works and Pump Houses and Master Pump House and Gravity Mains including men and Material for a period of 12 Months on Turn Key basis for the Year 2021-22 Est Cost: 68.00 Lakhs.
Manning, operation and maintenance of Nellimarla, Ramatheerthalu Head Water Works and Pump Houses and Master Pump House and Gravity Mains including men and Material for a period of 5 Months on Turn Key basis for the Year 2020-21 Est cost: 22.80 lakhs.
Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Non Quality Affected Areas of Block- Baikunthpur in 32 Habitation of Gopalganj District of Bihar on turn-key basis with Three months Trial Run Period Under P.H. Division, Gopalganj.
Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Non Quality Affected Areas of Block- Fulawariya in 20 Habitation of Gopalganj District of Bihar on turn-key basis with Three months Trial Run Period Under P.H. Division, Gopalganj.
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of One (01) No. Of 2x10 Mva, 33/11 Kv New Pss At Agriculture/ Veterinary College Campus In Kishanganj District Along With Associated 33 Kv And 11 Kv Lines Under State Plan.
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of One(01) Nos. Of 2x10 Mva, 33/11 Kv New Pss At Govind Pitaujhiya, Block- Runnisaidpur In Sitamarhi District Along With Associated 33 Kv And 11 Kv Lines Under State Plan.
Electrification of Punrvas Colony Block A,B,C,D,E,F,G,H and I at Amwar in District Sonebhadra due to Kanhar Canal Pariyojna khand-5, Duddhi on Turn-Key Basis under EDC Rabartsganj, Sonebhadra under full deposit scheme year-2017-18
Construction of 33 KV line From 132 KV Sub Station Kainthy to Deenapur,Varanasi for giving 2850 KVA load Connection to Deenapur Sewage Treatment Plant Varanasi on 33 KV Voltage under EUDC III Varanasi on Turn Key Basis. under full deposit scheme
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of 2x10 Mva, 33/11 Kv New Power Sub-stations, 33 & 11 Kv Lines, Bay Extension And Other Associated Works Under Purnea Electric Supply Circles Of Nbpdcl Under Revamped Distribution Sector Scheme (rdss).
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of 2x10 Mva, 33/11 Kv New Power Sub-stations, 33 & 11 Kv Lines, Bay Extension And Other Associated Works Under Motihari Electric Supply Circles Of Nbpdcl Under Revamped Distribution Sector Scheme (rdss).
Turn Key Contract For Design, Engineering, Construction, Testing And Commissioning Of 2x10 Mva, 33/11 Kv New Power Sub-stations, 33 & 11 Kv Lines, Bay Extension And Other Associated Works Under Darbhanga Electric Supply Circles Of Nbpdcl Under Revamped Distribution Sector Scheme (rdss).
Turnkey Project of Smart Classrooms for ITI, Pimpri Chinchwad Municipal Corporation (Q3)
Survey Design Construction O M and Management of Solar based Micro Irrigation Project on EPC single responsibility turnkey basis at i KHAM-9 Amjhar 160Ha CCA ii KHAM-14 Kherli 95Ha CCA Block Khairabad Distt Kota and its OandM for a period of 8 years
Project Management consultancy services for proof checking, construction supervision, quality assurance, quality control and quality audit for the work of "Comprehensive development of corridor from Nalgonda X roads - Saidabad - IS Sadan - Owaisi ... under EPC /Turnkey ... EPC/ Turnkey basis
APSPCL - Design, Engineering, Procurement, Supply, Erection/Installation, Testing & Commissioning of 750 kWp (0.75 MWp) Grid-Connected Ground-Mounted Solar PV Power Project on Turnkey EPC (Lumpsum) Basis, including Operation and Maintenance (O&M) for 25 years at G. Kothapalli Village, Eluru District, Andhra Pradesh.
APSPCL - Design, Engineering, Procurement, Supply, Erection/Installation, Testing & Commissioning of 750 kWp (0.75 MWp) Grid-Connected Ground-Mounted Solar PV Power Project on Turnkey EPC (Lumpsum) Basis, including Operation and Maintenance (O&M) for 25 years at G. Kothapalli Village, Eluru District, Andhra Pradesh.
Four laning from Biswanath Chariali by-pass (Km 208.00 to Gohpur Km 265.50 (Total length 57.50) in the state of Assam on EPC basis
Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH 37 Old Pkg IV Structures and Toll Plaza under SARDP-NE under EPC Mode
Improvement/widening to two-lanning of stretch from km 55.525 to km 79.680 Ranikhor- Baghmara Project in the state of Meghalaya under SARDP-NE Phase-A on EPC mode (Package-III)
Restoration and Rehabilitation of Ukhrul to Nagaland Border via Jessami road for km 63.00 to Km 126.00 (Length 63km) NH-150 in the State of Manipur on EPC mode-4th Call
Construction for Restoration work of damaged road benches at Km 34.200 (approx) of NH-10 during the FY 2025-26 under NHIDCL on EPC Mode in the state of West Bengal
Changing of old Raw Water Pipeline from Pump house sector-10 near Obra dam Railway Bridge to filtration plant sctor-10 on EPC mode (Trunkey basis), Obra Thermal Power Station, Obra.
Consultancy services for Authority Engineer for Supervision of CONSTRUCTION OF SIX LANE LINK ROAD (NH-166S) WITH PAVED SHOULDER CONFIGURATIFON TO MOPA AIRPORT IN THE STATE OF GOA ON EPC MODE
Stabilization of land slide and slope protection between Km 28.60 to Km 142.00 on Rishikesh-Dharasu road on NH-34 state Uttarakhand on EPC Mode No of Slide locations 12 Nos
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 0.000 to Km 13.747 in the State of Manipur EPC mode under Bharatmala
Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE
Balance work Construction of High-Altitude Hill Road from Doginala to Gau from KM 0.000 to KM 15.918 in Upper Subansiri District of the State of Arunachal Pradesh on EPC Mode
Rectification of Black Spot at Mansar Morh from km 69.780 to km 70.690 (Mansar Morh) i.e. 0.91 Km section district Samba in union territory of Jammu and Kashmir on EPC Mode
Slope stabilization and protection works at CH Km 40.05 near 7th Mile of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
Augmentation of 5 MLD STP at Chandinamura, Agartala by Providing Additional Sewage Pumping Station in EPC Mode and Post Completion Operation and Maintenance for Three Years Including DLP of one Year.
Restoration/Rehabilitation of Churachandpur Tipaimukh road on NH02 Old NH150 from Km 185 to Km 262 Total Length 77 Km in the State of Manipur in FY2025 26 on EPC mode
(Continue) Type-II, Type-IV, and Type-V Residential Quarters, Statutory Officer Houses, Hostel for Research Scholar and other services at Central University of TN (CUTN), Thiruvarur,in EPC Mode-III
Construction of Random Rubble Masonry RRM Compound wall and other allied Civil works at SSLV Launch Complex SLC, Tiruchendur and Sathankulam Taluk, Thoothukudi District, Tamilnadu on EPC Mode-III Package 4
Package 2: Construction of Roads *Base Course*, RCC box culverts, and other allied civil works at SSLV Launch complex *SLC*, Tiruchendur and Sathankulam Taluk, Tuticorin District, Tamilnadu in EPC Mode-III.
Construction for Restoration work of damaged road benches at Km 26.500 (approx) of NH-10 during the FY 2025-26 under NHIDCL on EPC Mode in the state of West Bengal
Construction for Restoration work of damaged road benches at Km 34.400 (approx) of NH-10 during the FY 2025-26 under NHIDCL on EPC Mode in the state of West Bengal
Consultancy services for AE for Supervision of Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III) in the State of Manipur on EPC Mode
Construction of New Two-Lane Bridge with its approaches from Km 0.000 to Km 4.385 across River Brahmaputra on NH-17 at Jogighopa in the State of Assam on EPC mode