Loading…
Loading…
25,894 results • Best match
consultancy Services in planning and design works (PEC) of pipe line project
Supply, Erection, Testing and Commissioning of (i)132/33kV SS at Nandaluru (ii) LILO of 1st circuit of existing 132kV Rajampeta-T.G.Palli line to 132/33kV SS Nandaluru(4.8KM) (iii) Stringing of 2nd circuit on existing 132kV DC/SC line from 220/132kV ... on turnkey basis
EPC PACKAGE OF MSW TO TORREFIED CHARCOAL FACILITY NOIDA-GNIDA PROJECT- 900 TPD
procurement of spares of BTL EPC make 55KW Drive,1000MM Belt from OEM
SPARE FOR SMART EP POSITIONER OF CV-1x660 MW UPRVUNL PANKI EPC PKG
procurement of BTL EPC MAKEGear Box, GearBox spare and 75KW Drum from OEM
Modernization of Switch gear & EPC section through Outsourcing facility as per Technical Specification.
EPC TENDER FOR CONSTRUCTION OF PERMANENT CONVOCATION DOME FOR CONVOCATION IN UNIVERSITY PREMISES
Construction of Haj House at Vidyadharapuram in Vijayawada Municipal Corporation under EPC system.
Integrated Infrastructure Project for Silvassa Smart City Limited , Phase-1 (Remaining works, EPC)
Selection of EPC contractor for Development of Solar PV Project at IIT Jodhpur.
Providing Air Conditioning to compressor room of vacuum chamber at EPC, LPSC Valiamala
EPC Awasari Pargaon - Improvement to SH-50 to Awasari Khrud- Pargaon-Pimparkhed -Jambut
Construction of Approach Road to second basement level of EPC at LPSC Valiamala
Construction of storm water drain and external PH works at EPC,LPSC Valiamala
spares for BTL EPC make 90 KW Drive Head for 1000mm belt conveyor
Spares for BTL Make EPC Ltd Make Conveyor for 800, 1000 and 1200mm
procurement of spares of BTL EPC make 55KW and 75KW Drive from OEM
procurement of spares of BTL EPC make 150KW Drive,1200MM Belt from OEM
EPC package for Ash Handling Plant at Singrauli STPP Stage-III (2X800 MW)
EPC SWITCH 2 POLE 125A . ON- OFF P.N. 4160200125 JOSTS JUMBOELECTRIC PLATFORM TRUCK
EPC SWITCH S/POLE ON/OFF ED 12548 X 125A, PT. NO. 13221099.
EPC execution for Power House EM Works of 186 MW Tato I HEP
EPC and ITC inclusive of 1 Year Comprehensive Operation and Maintenance of 100 KWp On Grid Roof Mounted Captive Solar Power Plant at IOCL Paradip Ref
Remainign work of ward no-6, 7 and 13 ward level pipe water supply scheme and its Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes with Electric Driven Pumps for Non-Quality habitation wards in Bhagalpur Districts ... on turn -key ... turn- key basis ... on turn -key ... turn- key basis ...
High-End Digital Subtraction Angio Cardiac System with Turnkey, Vendor Neutral Radiology Workstation
Under NABARD RIDF XXII in single package on Turn key job basis
Full Deposit work under on Turn-Key Basis under EDD-III Azamgarh
Construction of 132/33KV JEHTA LUCKNOW ESD-563 on turn-key basis
Conversion of Border Security Fencing from Phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length - 210.028 Km). SH: Between BP No. 742/9-S to 764/2-S (35.03 Km including intermediate BOPs, riverine structures like ... in EPC Mode -III.
Conversion of border security fencing from Phase-II/III to new design fence in West Bengal between BP No. 243/MP to 764/2-S (Length 210.028 Km). SH: Between BP No. 417/8-S to 436/10-S (36.26 Km including intermediate BOPs reverine structures like ... in EPC Mode -III
C/o of One tower office complex and another tower of Residential quarters i/c internal water supply, sanitary installation and all development and bulk services, horticulture works on EPC mode-I basis i/c Comprehensive O &M of Civil, E&M service for 7 years after completion of original construction work for Ranga reddy, secunderabad, Medchal, Audit-I, Audit-II commissionates of Central Tax at Khajaguda, Hyderabad. SH: Providing services of Inspection vehicle & LMV driver for the EE&SM(C)-I,CPWD, Hyderabad.
Providing Hire vehicle to the Executive Engineer (R&B) APRDC Division, Kurnool from 01-07-2026 TO 30-06-2027 (12 Months) for inspecting of the works in (R&B) APRDC Division, Kurnool (Under the Contingencies of the work: Widening to two lane with ... on EPC mode under ...
Providing Hire vehicle to the Executive Engineer (R&B) APRDC Division, Kurnool from 01-07-2026 TO 30-06-2027 (12 Months) for inspecting of the works in (R&B) APRDC Division, Kurnool (Under the Contingencies of the work: Widening to two lane with ... on EPC mode under ...
Construction Hostel Block-H1 and related infrastructure development work including modification of existing LVH dining hall with kitchen equipment and furniture for IIMC at Joka, Kolkata (SW: Construction of Hostel Block-H1, Service Block-A and ... on EPC mode (Package-I ...
Purchase of computers 3 Nos, Scanner & Printer 2 Nos and UPS 2 Nos and Xerox Machine 1 No for the use of Superintending Engineer (R&B) NH Circle,Anantapuramu under the main work of Rehabiitaion and Upgradation of NH-340 from Km 0/000 to 60/380 ... on EPC mode Under
RFP for Earthwork in formation and in cutting, blanketing, construction of RCC box, RCC and PCC drains, retaining walls, toe walls, nine (9) numbers minor bridges, one (1) number Road Over Bridge (ROB), Railway Electrification works including design, ... Hybrid- EPC mode .
Custom Bid for Services - The Work Of 11 KV Line Strengthning at various 33/11 KV substations in Business Plan 2026-27 on Semi Turn-key Basis under the area of Electricity Urban Distribution Division, Etawah (Rural) Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Construction of Service Road and RCC Drain on both sides of NH 37A from Kaliabor Tiniali- (Km 0.000) to Kolong Bridge (Km 0.600) in Nagaon district in the state of Assam under EPC Mode
Construction of Balance Work of the 4- laning of the Section from Jhanji to Demowof NH-37 Pkg-II Road Works fromKm 501.800 to Km 514.800 (13.000 Km), under SARDP- NE , under EPC Mode.
RFP For Procurement of Contractor for Execution of Mega PWS in 11 Blocks i.e. K.S.Nagar, Aska, Soroda, Dharakote, Purusottampur, Polasara, J.N Parshad, Bhanjnagar, Belaguntha, Buguda and Beguniapada Block of Ganjam District on EPC mode
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Construction of High Altitude Hill road from Ladda (Graziang) TO Basai from KM 0.000 to KM 35.260 in East Kameng District of Arunachal Pradesh on EPC Mode
Restoration/Rehabilitation of Churachandpur Tipaimukh road NH 02 Old NH 150from Km 9.00 to Km 70.00 Total Length 61.00 Km in the State of Manipur in FY 2025 26 on EPC mode 2nd Call
Construction of D Type 50 Nos. and E type 32 Nos. Quarters at Swarnamukhi Nagar SMN ISRO/ DOS Housing Colony, Sullurpeta - Phase-II Civil, PH, Electrical and Mechanical Lift works in EPC Mode-III.
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 118.850 to Km 130.000 (Package-4A) in the State of Manipur on EPC mode under Bharatmala
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 130.000 to Km 141.029 (Package-4B) in the State of Manipur on EPC mode under Bharatmala
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 48.587 to Km 69.875 (Package-2B) in the State of Manipur on EPC mode under Bharatmala
Construction of Balance Work of the 4-laning of the Section from Jhanji to Demow of NH-37 Pkg-I Road Works from Km 490.800 to Km 501.800 under SARDP- NE under EPC Mode.
Construction of Two laning with Hard shoulder road of Ukhrul - Toloi - Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode
Construction of two lane with paved shoulders road from Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length - 10.00km) (PKG-1) on EPC mode