Loading…
Loading…
25,906 results • Best match
Upgradation of existing road to 2 Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length 26.249) of NH39 (New NH02) under Bharatmala NH-O TSP in Nagaland in EPC mode
Deep Drilling, Development and Stabilization of 200 mm dia mini Tube wells (on EPC Mode) By ODEX Method at Tirupati Tirumala Devsthan at Majeen in District Jammu under Capex Plan (UT Sector) for the year 2023-24
Improvement of Road Safety on NH-503 20A between Km. 39 0 to 91 0 Ranital-Mubarikpur Providing and Fixing Thrie single side Metal Beam Crash Barrier etc in the State of Himachal Pradesh on EPC mode
Improvement Widening to 2 Lane with Earthen Shoulder from Kanai Rongara,existing chainage from km 85.970 to km 102.345 (Chainage from km 81.100 to km 96.000) design length-14.763 km on EPC Mode Phase A in Meghalaya
Consultancy services for AE for Supervision Construction of 2 Laning with Hard Shoulder of Peren - Dimapur section on NH - 129A in the state of Nagaland on EPC mode (Pkg - III, IV and V) under NH(O)- TSP
Construction of 2 Laning with Hard Shoulder of Peren - Dimapur section on NH - 129A from Design Km 126.775 to Km 146.208 (Length - 19.433 Km) in the state of Nagaland on EPC mode (Pkg - II) under NH(O)
Widening Improvement to 2-lane with earthen shoulder of Finch Corner to Ukhrul section from existing km 34.650 to km 50.520 of NH-202 in the State of Manipur on EPC mode. (Package-3, Length-14.63 km)
period whichever is later of Grid Solar Powered Integrated Micro Irrigation Schemes in the command of the existing outlets of various distributaries minors in District Bhiwani of Haryana on EPC mode under Hybrid Annuity based Model HAM
Strengthing Widening of existing carriageway to 10 M in Km. 156 160 to 229 160 Tembhurni Kuslamb section of N H 548 C ie Tembhurni Kurdwadi Barshi Kuslamb road in the state of Maharashtra on EPC Mode
Construction of 2-laning with hard shoulder configuration of Chhumkhum to Tlabung from Design Chainage Km 37.420 to Km 50.700 (Pkg-4) for Lunglei-Tlabung section of NH-302 in Mizoram under Bharatmala Pariyojana on EPC Mode
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118.850 to km 132.037 (Package 4A) in the State of Manipur on EPC Mode
Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old) Pkg-III Road Works from Km 477.000 to Km 490.800 (13.800 Km), under SARDP-NE, under EPC Mode
Construction of Balance Work of the 4-laning of the Section from Jorhat to Jhanji of NH-37 (Old) Pkg-I Road Works from Km 453.000 to Km 463.000 (10.000 Km), under SARDP-NE, under EPC Mode
Widening/Improvement to 4 Lane with Paved Shoulder from km 66.000 to km 81.000 (Design Chainage 65.923 to 80.930) of Dokmoka LoringThepi Section3 of NH-29 in the state of Assam under Bharatmala Pariyojna on EPC mode
Balance work for construction of 2-Lane with Hard Shoulders of Demwe-Brahmakund Section of NH-13 from Ch. 0.000 Km to 18.464 Km in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE
Strengthing Widening of existing carriageway to 10 M in Km. 156 160 to 229 160 Tembhurni Kuslamb section of N H 548 C ie Tembhurni Kurdwadi Barshi Kuslamb road in the state of Maharashtra on EPC Mode
Construction of 600-Seater Boys Hostel, Residential Quarters Type-II, III IVS, Extension of School of Humanities Social Sciences Management SHSSM building and its associated services Package-2 on EPC mode -III of contract under phase-III
Strengthening to Parbhani - Gangakhed - Isad - Kopara - Nalegaon -Bori - Latur - Nitur - Nilanga - Aurad - Shahajani - Bhalki Road NH 752K in Km 104/800 to 122/800. In the State of Maharashtra (Section Garani to Nalegaon ( Aarimode)) on EPC mode
Consultancy Services as AE for Supervision of Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Bilasipura- Guwahati road(NH 17) to Milmila R.F in the state of Assam on EPC mode (Package-9 and 10)
Installation of Koraibari Mini Solar RLI scheme on Turn Key basis in Jalpaiguri district.
Setting up including SITC of NVR/IP Based CCTV Surveillance Systems (Turn-Key Project)
Installation of Santipara Mini Solar RLI scheme on Turn Key basis in Jalpaiguri district.
Strengthening of Joypur SD in Dibrugarh District under NHM, Assam on Turn Key Basis
Installation of Khuniapokhri Mini Solar RLI scheme on Turn Key basis in Darjeeling district.
Installation of Bargirkura Mini Solar RLI scheme on Turn Key basis in Jalpaiguri district.
Construction of 33 KV Anyor Line on Semi Turn Key Basis in dist. Mathura
Construction of 132/33KV substation Newajganj Raebareli on turn-key basis against ESD-621
Construction of 132KV S/s Sofipur, Firozabad on turn-key basis against ESD-639
Custom Bid for Services - Finalization of EPC Tender Doc, Custom Bid for Services - PMC services of Solar Plant, Custom Bid for Services - Site Supervision charges
Pre Bid Engineering Services for the Signalling Telecommunication works of Construction of 3rd line between Maramjhiri Km 841.9 and Chichonda Km. 911.7 on Itarsi-Nagpur section of central Railway on EPC
Construction of Basement plus Ground floor plus 10 storied building for state of the Art, Director General, GSI office at plot no. GN-40, Sector-V, Saltlake, Kolkata including Civil, Electrical and Mechanical and Horticulture works/ services on EPC basis....
Cons of New OPD Block (200 Bed Ward) (Basement GF 6 Floors at the location of old OPD block on EPC basis with civil works including internal & external water supply & sanitary inst sewrage system drainage & development of site, intr roads & paths storm water darins, rain water harvesting pits boundary wall overhead tank without indp stagings etc., SH: Pdg services of utility vehicle (without driver) on monthly basis for the office of AE(E)-IV, CPWD, Hyderabad.
Investigation, Design and Construction of Roads, Drains, Water Supply, Sewerage, STP, Utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation compatible with trunk infrastructure in Layouts for Land Pooling Schemes Lingayapalem(P), ... on EPC Basis & ...
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of Intermediate Pumping Station-1 (IPS-1), and Intermediate Pumping Station-2 (IPS-2), MS pipe Raising main from IPS-1 to IPS-2 and IPS-2 to Master ... on EPC Basis .
C/o Basement, Ground floor, 10 storied building for State of the Art, DG, GSI office at Plot No. GN-40, Sec-V, Salt Lake, Kolkata i/c Civil, Elect & Mechanical and Horticulture works/services on EPC basis. SH:- Providing the services for typing on computer related work and sweeping work at office of the EE(P), SE(P), SDG (PRK), EE(C), (P), SDG (PRK),, SE(P), SDG(PRK) and SA/SDG(PRK), CPWD, Kolkata on contract basis.
EPC MODULE AMPLIFIRE EPC2 20 L+/- 800 MA (NON- CONFIGUERED) TYPE: L723888-110, MAKE: OIL GEAR OR IT
Fluroketone Gas (SGE) based and Condensed Aerosol (SGL) based Firefighting System EPC Package for KKNPP 3 and 4
CCTV WITH DVR HDD SMPS WIRE TURNKEY SOLUTION, TEA AND COFFEE VENDING MACHINE, 165 LTR REFRIGERATOR, 32INCH LED TOP BRAND
C/o of one tower Office complex and another tower of Residential quarters i/c internal water supply, sanitary installations and all development and bulk services, horticulture works on EPC mode-I basis i/c Comprehensive O & M of Civil, Electrical services for 7 years after completion of original construction work for Ranga Reddy, Secunderabad, medchal Audit-I, Audit-II commiissonerates of central Tax at Khajaguda, Serilingampally, Hyderabad. SH: Providing services of Computer operators and Office attendants in O/o CE Cum ED, CPWD, Hyderabad. Subwork/Packages: Providing service of computer operators and office attendant in O/o CE Cum ED, CPWD, Hyderabad.
PL REFER SBD
Strengthening of Electricity System And Construction of New 11 KV Independent Line For Nagar Panchayat Paniyara, Brijmanganj and Strengthening of Electricity System for Anand Nagar Tehsil Under EDD-II Anand nagar Under Deposit scheme Year 2022-23
PL REFER TENDER DOCS
Procurement of Bone Skill Lab on Turnkey Basisi for the year 2025 at GMC Gondia
IMPROVEMENT OF ELECTRICAL INFRASTRUCTURE BY WAY OF IMPROVEMENT OF HT/LT NETWORK AT VARIOUS VILLAGES IN DISTRICT SHOPIAN AS PER THE ENCLOSED SBD UNDER PRI HEAD ON TURNKEY/ PARTIAL TURNKEY BASIS
Supply of 64 Slice Computerized Tomography Scanner (CT SCAN) on Partial Turnkey and Buyback Clause qty-08, and 64 Slice Computerized Tomography Scanner (CT SCAN) on Full Turnkey basis, qty-20
E-TENDER FOR (A)DESIGN AND SITC OF AUTOMATIC 10TPD CAPACITY RASOGULLA PLANT ON TURNKEY BASIS (B)DESIGN AND SITC OF PEB STRUCTURE INDUSTRIAL SHED ON TURNKEY BASIS AT JAIPUR DAIRY
SELECTION OF EMPANLENMENT OF EPC CONTRACTORS FOR INSTALLATION OF ROOFTOP SOLAR PV PLANTS IN U.T OF PUDUCHERRY.
Installation of 5 MVA Additional power Transformerof at 33 11 KV Sub station BAD on on semi turnkey basis Semi-Turnkey Basis