Loading…
Loading…
25,575 results • Best match
CS for AE for Supervision of Construction of 12 Nos. of standalone structures at different locations of NH-3 (Package-I) in the state of Maharashtra on EPC Mode
Construction of Foot over Bridges at 24 locations in Bangalore Nidagatta Mysore Section of NH275 from Km.18.000 to Km.135.304 in the State of Karnataka on EPC Mode.
Construction of 4-Laning of Puruliya Bypass section from Km 84.030 to Km. 94.345 of NH-32 (length 10.315 km.) in the state of West Bengal on EPC Mode.
DESIGN, CONSTRUCTION, TESTING, COMMISSIONING AND VALIDATION OF BSL-3 LABORATORY, BSL-2 LABORATORY AND ANIMAL FACILITY (EPC MODE) INCLUDING OPERATION AND MAINTENANCE AT INSTITUTE OF ADVANCED VIROLOGY, THONNAKKAL, THIRUVANANTHAPURAM
Design Engineering and Procurement for Construction of Residential and Non Residential Buildings of 3rd Battalion of UP Special Security Force at District Prayagraj Uttar Pradesh India on EPC Mode
Rehabilitation and Up-gradation to 2LPS of Kalyan- Murbad - Malshej Ghat -Nirmal Road from km (Murbad to Kadampada) of NH-61 in the State of Maharashtra on EPC Mode.
Periodic Renewal of the stretch from Km 0.0 to 1.9 , Km 3.6 to 7.8 on Hyderabad Bhupalapatnam section of NH 163 for the year 2021 22 on EPC mode.
Rehabilitation and Upgradation of Watur 00/000 to Charthana 27/00 NH 752 I to Two Lane with paved shoulder configuration on EPC mode in the State of Maharashtra
CONSTRUCTION OF 180 M. SPAN R.C.C BOX CULVERT OVER SHETLA RIVER OF KM.2 ON LAMBARPUR LANGHA ROAD IN DISTT. DEHRADUN IN THE STATE OF UTTARAKHAND on EPC mode
Construction of Passenger Terminal Building Warehouse cargo admin building and external development and allied services on EPC Mode (Design and Build Basis) at ICP Sunauli on Indo Nepal Border
Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Amethi with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
Strengthening and Improvement of Road safety from Km. 59.200 to 67.200 of Sironcha Atmakur Section of NH 353C on EPC Mode under NHO-TSP in the State of Telangana
Upgradation and Widening of Various Village Roads of Dapada, Surangi, Amboli, Kherdi, Khanvel, Mandoni,Naroli, Dadra, Kilvani, Randha, Sayli, Samarvarni, Masat and Rakholi at Silvassa (EPC Mode) (3rd call)
Tender for Construction of a building for the Centre of Excellence (CoE) in Flow Chemistry and Continuous Manufacturing at NIPER Kolkata, Panihati Campus, West Bengal on EPC mode Basis.
Development of Bunkering and Refueling facility for Green Methanol 750 meter cube on Pilot basis including five years Operation and Maintenance contract through EPC mode at VOC Port Authority
Widening to 2 lane with paved shoulder from Km71.00 to 104.000 Sarjapur to Pattadkallu on Bhanapur to Gaddankeri section NH-367 in the State of Karnataka on EPC mode
Construction of Chintamani Bypass from design Ch 0.0 existing ch 428.880 to deisgn ch 15.400 existing ch 444.010 on NH 69 in the State of Karnataka on EPC mode
Periodical Renewal Work in Km. 57.000 to 104.400 total 47.400 Km. on NH-30 (Old N.H. 221) Jagdalpur-Sukma-Konta Road in the State of Chhattisgarh on EPC Mode.
Widening to 2L PS from Km.0.00 to Km.37.850 Except Ex.Km.24.45 to 27.20 of NH 766C Byndoor Ranebennur section in the state of Karnataka on EPC mode
Strengthening of Pune - Solapur Road NH 65 in km 8.800 to km 12.500 Section Ravidarshan Hadapsar to Manjari stud farm Pune in the State of Maharashtra Under EPC Mode
Treatment of 01 nos. of landslide location at Ch. 79.850 to 80.300 (Dabarkot) on NH-134 under EPC mode in the state of Uttarakhand under Annual Plan 2024-25
Providing permanent restoration to valley side slips occurred during monsoon of 2018 19 from Km.237.000 to Km.263.000 Shiradi Ghat of NH75 Bangalore Mangalore section on EPC mode
Development Widening of Talegaon Chakan Shikrapur Nhavara Section of NH 548DG Nhavara to Choufula Section of state highway in the state of Maharashtra on EPC Mode Length 24.037 Km
Construction of 4 Laning of Manegaon to NH-45 from Km.19.050 to Km. 39.180 (Jabalpur Ring Road Package 2) under Bharatmala Pariyojna in Madhya Pradesh on EPC Mode.
Construction of Four-Laning of NH-45 to Kushner from km 38.400 to km 74.700 (Jabalpur Ring Road, Pkg 3) under Bharatmala Pariyojna in Madhya Pradesh on EPC Mode
Six laning of Kagal Satara section of NH48 (old NH4)Package I from km 592.240 to km 658.000 in Maharashtra to be executed on EPC mode under Bharatmala Pariyojana
Rehabilitation and upgradation of Ghoti to Trimbak section of NH-160A (km 53.500 to km 101.100) to 4-LPS (47.600 km) in the State of Maharashtra on EPC Mode
Construction of Vehicular Underpass (VUP) including approaches near Peddem junction at Km 502.327 of NH-66 in the state of Goa on EPC Mode under Annual Plan 2024-25.
Pre-Tender Tie-Up for the Civil/ Structural Work part for the work of Construction of Major Bridge in the State of Arunachal Pradesh on EPC mode under SARDP
Construction of permanent campus of Sindhu Central University at Khaltse, Leh, UT of Ladakh including Civil and E&M services in EPC mode. (including O&M for 12 months)
Construction of office building of drugs and food control organisation using steel structural system at KurBathang Kargil UT of Ladakh on EPC mode basis(SH: providing services of manpowers)
Installation of Floating Pontoon pumping system, related civil works, electrification & Scada arrangements at Muchumarri (V),Nandikotkur (M) ,Nandyal District Under EPC Mode for External supply Scheme to MIH Orvakal.
Installation of Floating Pontoon pumping system, related civil works, electrification & Scada arrangements at Muchumarri (V),Nandikotkur(M), Nandyal District Under EPC Mode for External supply Scheme to MIH Orvakal.
Construction of permanent campus of Indian Institute of Information Technology, Raichur, Karnataka(EPC) Mode II basis. SH: Providing Inspection Vehicle for the office of Executive Engineer(E), CPWD, Mysuru
Onetime improvement to bypassed reaches of Kadiri town on NH-42 in the State of Andhra Pradesh under NH(O) on EPC Mode under the Annual Plan 2025-26
Design and Construction of Small Vehicular Underpass at Ch 863 200 on Pune Satara Section of NH 48 in the State of Maharashtra as Standalone Project of EPC Mode
Construction of H.L. Bridge over river Brahmani near Badakhamar on Khadagprasad Badakhamar Parjang Road in the District of Dhenkanal under NABARD Assistance RIDF-XXVI through EPC mode of Contract
Balance Works for Four Laning of Vikravandi to Sethiyathope Section (from Km 0.0 to Km 65.96) of NH-45C in Tamil Nadu under NHDP Phase-IV on EPC Mode
Construction of four lane High Level Bridge across tawa River on Narmadapuram - Mouhasa - Babai - Jabalpur Road (S.H. - 22) District Narmadapuram , in the state of Madhya Pradesh. on EPC Mode
Construction of flyover at Rau circle at Km 12.600 (from design km 11.700 to Km 12.920) in Indore Dewas stretch in the state of Madhya Pradesh on EPC mode
2-lane with Paved shoulder of Ujjain Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 (133.575 km) section of NH 552G in Madhya Pradesh on EPC mode.
Design, Build, construct, install, and commissioning of Compost Plant of 100 TPD for wet waste along with operation and maintenance of the plant for 5 years on EPC Mode.
Construction work of 5.6 TPD dry waste processing plant (MRF+RDF) under Nagar Panchayat Hasanpura and operation and maintenance work of the plant for 5 years on EPC mode.
Project Management Consultancy Services for Proof checking, Construction of 4-lane bidirectional elevated Corridor from Indira Park to VST main road crossing NTR Stadium Junction, Ashok Nagar Cross Road Junction, RTC Cross road Junction and ... under Engineering Procurement and Construction (EPC)/Turnkey ... ( EPC )/Turnkey ... (EPC)/ Turnkey -
EPC AU- II (37 D) - Improvement to Aurangabad Sillod- Jalgaon- Barhanpur road MSH 05 with four laning CC road Km 0/00 to 5/00 (cidco bus stand to harsul Tea Point) Tal. Aurangabad Dist. Aurangabad on EPC mode
EPC PN-II (18A) - Improvement to Kolhapur Parite Gargoti Gadhinglaj Naganwadi Chandgad Here Motanwadi Phata Kalasgade Kodali Bhedshi to State Border Road SH-189 km . 63/00 to 115/500 Tal. Bhudargad, Ajara, Gadhinglaj, Dist. Kolhapur on EPC mode
EPC NSK-II (29A) - Improvement to Savkheda fata Dharangaon Erandol Road SH-41 Km 0/00 to 24/700 Tal. Dharangaon, Erandol and Mehergaon Dhule Amalner Chopda Road SH-15 Km 86/790 to 119/590 on EPC mode
EPC AM-II (50 A) - Improvement with Strengthening to Arvi Wardha Waigaon Ralegaon Ghatanji Parwa Mandwi Road SH-267 Km 101/700 to 140/100 In Tal. Kalamb, Ralegaon Dist. Yavatmal (Ralegaon to Metikheda to Ghatanji) on EPC mode
Project Management Consultancy Services for Proof Checking, Construction Supervision, Quality Assurance, Quality Control and Quality Audit for the work of "Construction of an Iconic Bridge across Mir Alam Tank Connecting Bengaluru National Highway at ... ( EPC ) ... (EPC) mode / ... mode/ Turnkey Basis
Construction of 04 four nos School Building at Central University of South Bihar Gaya on Engineering Procurement and Construction (EPC) Basis SH : Construction of School of law and Governance G plus 2 with provision of additional one floor in future ... on EPC basis