Construction of Four Lane Bypasses for Jagatpur Babuganj Unchahar Alapur Bypass and Sai river bridge of Raebareli Prayagraj section of NH30 (Old NH24B) under Bharatmala Pariyojna in Uttar Pradesh on EPC mode
Construction of Foot Over Bridges on Km21.500(Design Ch21.500 PKGI) Km29.500(Design Ch29.500 PKGI) on NH148B and Km17.500(Design Ch3.100 PKGIII) Km58.600(Design Ch44.200 PKGII) on NH11 in Haryana on EPC mode.
Construction of 5 Nos. VUPs and Service Road (km 60.300 to km 66.790, BHS) on Delhi-Haryana Border to Rohtak Section on NH-09 in the State of Haryana on EPC Mode.
Construction of SVUP at Ch 40 100 Mandali Village and Ch 43 220 Nagamthan Village on Ahmednagar Mirajgaon Karmala Tembhurni section of NH 561A in the State of Maharashtra on EPC Mode
Design Engineering and Procurement of Construction of 500 Bedded 08 storey multistorey building and patient utility complex for expansion of trauma center in King Georges Medical University Lucknow UP on EPC mode
RFP for Design and Construction of Vehicular Underpass VUP at Km. 21.150 near Angira College on Jhansi Khajuraho Section Pkg 1 of NH 39 in the State of MP on EPC Mode.
Construction of 4 lane Connector from Delhi Meerut Expressway (Km. 50.000 of Package IV) to Km. 8.520 of NH 235 in the State of Uttar Pradesh on EPC Mode (Length 14.600 Km).
RFP for Construction of Four Lane Nagpur Katol section of NH353J including Mitigation Structures from Design Ch. 37.000 to Ch. 45.990 (Tiger Corridor-I) in the State of Maharashtra on EPC mode.
Construction of Six Lane VUPs at Karan (Ch.263.350) and Sarodhi (Ch.330.500) for rectification of blackspots on Surat-Dahisar section of NH- 48 in the state of Gujarat on EPC Mode.
Construction of Six lane access controlled Highway from Km 40.080 to Km 86.513 (Mator to Barodameo Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode
Construction of 4 Lane Elevated Highway and at-grade improvements at Gopalganj Town from Design Ch. 384.000 to Design Ch. 386.750 on NH 28 in the state of Bihar on EPC mode
2-lane with Paved shoulder of Ujjain-Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 (133.575 km) section of NH-552G in the state of Madhya Pradesh on EPC mode
Rectification of 13 Nos Blackspots Accident spots under Annual Road Safety plan for 2024-2025 in the stretch of Walayar Vadakancherry and Thrissur Angamaly Sec of NH544 in Kerala on EPC mode
Two Lane with Paved Shoulders of Roshni to Ashapur (Betul to Khandwa Pkg III) from Design Km 89.900 to Design Km 114.000 section in the State of Madhya Pradesh on EPC Mode.
Preventive measures to ensure safety of road users in Amba Ghat section from Km 6700 to Km 7200 on NH166 of Ratnagiri Kolhapur section in the state of Maharashtra on EPC mode
Strengthening of existing Yawal town portion in a length of 6.500 km from km 174.100 to km 180.600 on NH 753BE in the State of Maharashtra on EPC Mode under RO Nagpur
Construction of Service Road at Laling Mungase Vadalibhoi Raigad Nagar and Road Safety Works in Rahud Ghat on Dhule Pimpalgaon Section of NH 3 in the State of Maharashtra on EPC Mode
Construction of 6-Lane Elevated Structure at Km 462.160 at Loharka including balance Work of Approaches on Amritsar Wagah Border Section of NH-03 in the State of Punjab on EPC Mode
Consultancy services for Authority Engineer for supervision of balance works of rehabilitation and upgradation of New NH 30 Keshkal Bypass 4 L PS under NHDP IV of NH 30 on EPC mode
Construction of Six lane access-controlled Highway from Km 0.000 to Km 40.080 (Paniyala to Mator Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode
Consultancy services for Authoritys Engineer for Supervision of Construction of new four lane bypass to Parbhani city (Parwa to Asola) section of NH-61 on EPC mode in the State of Maharashtra.
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Up-gradation of Jintur- Shirad Shahapur Section of NH-752 I to 2PLS configuration on EPC Mode in the State of Maharashtra.
Construction of Dadwindi realignment starting from existing Km 36 250 and terminating at existing Km 38 650 including 2 lane ROB on NH 703A on EPC mode in the State of Punjab
Widening and upgradation of 200 feet wide PR-7 road from JLPL Sector-82 to NH-64, S.A.S Nagar on EPC Mode including five years of maintenance (Civil and Public Health Works)
Design and Construction of Bridge, Approach Road and Protection work over River Gomti At Kankar Ghat on Ameer Nagar - Barbar Road in Assembly Constituency Mohammadi of District Lakhimpur Kheri on EPC Mode.
Construction of Widening and Strengthening work in Km. 25.530 to 31.540 total 6.010 Km. of NH-30 (Old NH-221) Jagdalpur-Sukma-Konta road on EPC Mode in the State of Chhattisgarh
Rehabilitation Up gradation of Mudkhed to Nanded of NH 161A from Km 372 000 to km 386 400 two lane with paved shoulder configurations in the state of Maharashtra on EPC mode
Treatement of 04 no. of landslide zone from Dharasu to Yamnotri on NH-134(old NH-94) in the State of Uttarakhand under EPC mode in NH(O) Annual Plan 2022-23
Construction of ROB at Km-209 of NH-114A near Jagdishpur (LC No. 5 /B/E) in the State of Jharkhand on EPC mode.(JOB NO-NH-114A-JHR-2020-21-297).
Improvements to the road connecting Moolakulam junction (Ch.34/500) NH45A (New NH332) to Gorimedu Junction (Ch.3/520) of NH66 (New NH32), Puducherry on EPC mode under Central Road Infrastructure Fund.
Construction of ROB at Km-209 of NH-114A near Jagdishpur (LC No. 5 /B/E) in the State of Jharkhand on EPC mode.(JOB NO-NH-114A-JHR-2020-21-297)
Widening to 2 lane with paved shoulder from Km 0 to 102.310 Design Chainage of NH-548B Murrum Maharashtra border IB circle Bijapur section in the State of Karnataka on EPC mode
Providing Road Safety Interventions from Km 86/400 to 86/800 of NH716 of Renigunta Kadapa Road in the state of Andhra Pradesh under RSI for year 2021 22 on EPC Mode.
Rehabilitation of 65 M old Tunnel in Rudraprayag Ch. 0-530 to 0.600 of NH-109 (New NH-107) in the state of Uttarakhand Under EPC mode in the state of Uttarakhand
Widening and Strengthening from Km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to two lane with paved shoulder configuration in the State of Uttar Pradesh on EPC mode
Rectification of 12Nos Blackspots-Accident spots under Annual Road Safety plan for 2023-2024 in the stretch of Walayar-Angamaly Section of NH-544 in the state of Kerala on EPC mode
Protection measures at Malshej Ghat Tunnel and rockfall protection measures between km 90.100 to km 93.200 along Kalyan - Malshej Ghat - Nirmal Road NH-61 in the state of Maharashtra on EPC mode
PMC work for Construction of MBBS and Nursing Boys and Girls Hostel in Dr Ram Manohar Lohiya Medical Sciences Institute at Gomti Nagar Vistar in Lucknow U P India on EPC Mode
Strengthening / Overlaying of Four laning of Madurai - Paramakudi Section from Km 5.000 to Km 81.064 of NH- 85 and 87 (Old NH-49) in the State of Tamil Nadu on EPC mode
Upgradation to Two lane with Paved Shoulder carriageway from km 170.300 to km 277.254 of Dholavira Mauvana Vauva Santalpur Section Package II of NH754K in the State of Gujarat on EPC Mode
Strenthening to the Highway Satarting from NH.17 Talare Gaganbwada Kolhapur NH.166 in stretches from Km 36/600 TO 59/00 in State of Maharashtra.(GAGANBAWADA TO SALVAN) under EPC mode
Construction of Permanent campus of Indian Institute of Information Technology Raichur Karnataka EPC Mode II basis. SH Providing inspection vehicle for the office of the Assistant Engineer E KCESD CPWD Kalaburagi Karnataka
Construction of New Building Project at central University of South Bihar, Panchanpur, Gaya on EPC mode. SH: Construction of Approach Road for underground tank and STP from main road at CUSB, Gaya.
Construction of 2.0 TPD Biogas plant at Iscon Goshala, Ananthapuram, in Ananthapur district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode
Construction of 4 Laning of Kushner to Amjhar Road from km 75.480 to Km 98.950 (Jabalpur Ring Road Pkg 4) under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH:- Axial road, Jaisalmer South Sector, Package - V(A)) including 5 years maintenance (On EPC Mode).
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH:- Axial road, Jaisalmer South Sector, Package - V(B)) including 5 years mainntenance (On EPC Mode).
Construction of Under Ground Pipe line system (Gravity Flow) for distributary, Minor/Subminor for irrigation to 2013.5Ha CCA for Manjore Irrigation Project,Athmallik in Angul District, Odisha on EPC Mode of Contract.
EXECUTION OF 02 NOS INDIVIDUAL MEGA PWS TO 418VILLAGES 24GPS OF KASHIPUR BLOCK AND 49 VILLAGES 04GPS OF RAYAGADA BLOCK OF RAYAGADA DISTRICT INCLUDING FIVE YEARS OPERATION AND MAINTENANCE IN EPC MODE
PR Work FROM K.M. 139 TO 157/6 ON NH-934 SAGAR-BINA ROAD (TOTAL LENGTH 17.320 KM) EXCEPTING 1.22 KM. ROB PORTION in the State of Madhya Pradesh on EPC Mode