Loading…
Loading…
25,584 results • Best match
Custom Bid for Services - EPC Contract of 100 kWp Roof top Solar Project at PBCMP Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Ground Mounted Solar Power Plant Service
Strenghtening to Parbhani-Gangakhed-Isad-Kopara-Nalegaon-Bori-Latur-Nitur-Nilanga-Aurad-Shahajani-Bhalki Road NH 752K in Km 122/800 to 137/800. In the State Of Maharashtra (Nalegaon( Aarimode) to Latur Section)on EPC mode
Design & Construction of Working Womens Hostel Buildings including maintenance of buildings for 1 year under EPC contract at Narasapura Industrial Area, Kolar Taluk & District.
Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Bewar-Near Karri Village Section (Km 0.000 to Km 30.000) of NH-92 in the State of Uttar Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
Construction of Permanent Campus of Central University of Himachal Pradesh at Dehra and Jadrangal (Dharamshala), District- Kangra. (H.P.) on EPC Mode 1 Basis. Subwork/Packages: Providing Services of Computer operator in the office of the Executive Engineer & SM (Civil)- Derha, CPWD, Dehra, HP-177101.
Planning, Designing and Construction of Hostel Buildings (Ground First Floor Including part stilt with Twin Sitter Rooms)(Civil, E & M and all other works) consisting of Hostel Buildings at Two different campuses including comprehensive consultancy ... on Engineering , ... Engineering, Procurement and Construction (EPC-Mode ... ( EPC -Mode ... (EPC- Mode 1) ...
Supply and Installation of Laundry Equipment with ETP on Turn key basis
8.Providing turn key releasing water from varios ESR in A zone.
Turn-key Services for Design, Development and Maintenance of IISER Tirupati Website
Supply of Modular Labor Room on Turn Key Basis In Jalna District
ANPR and CCTV systems Installation at State Hanger On Turn-key Basis
Purchase of Real time pcr lab with accessories on turn key basis
Retender -E-30 (24-25) Upgradation of Urology Unit with Turn Key
6.Providing turn key releasing water from various ESR in A zone.
5.providing turn key releasing water from various ESR in B zone.
On turn key basis Construction of Hatpipaliya pressurized pipe Lift Irrigation Project
Modular Operation Theater with 30 KVA DG set on Turn Key Basis
Augmentation of FGK Internal Electrical Power Distribution System on Turn-key Basis
RT2-2732/HBPCL/PC/EQP/CSSD Equipments With Turn-Key /2022-23.
1.providing turn key releasing water from varios ESR in A zone
SUPPLY INSTALLATION TESTING AND COMMISIONING OF ADVANCED REHABILITATION LAB WITH TURN KEY
Construction of Gumgi Rural Pipe Water Supply Scheme on Turn key basis
4.providing turn key releasing water from various ESR in A zone.
CONSTRUCTION OF 11KV LINE OF 11KV EAST FEEDER ON TURN KEY BASIS
CONSTRUCTION OF 11KV LINE ON 11KV SUKHPURA FEEDER ON TURN KEY BASIS
Construction of 33 KV Line Kaseru, Distt. Aligarh on turn-key basis
as per NIT and tender document
Construction of bridge
Strengthening of Road from Km 4.325 To 10.000 (MMI Hospital Chowk to Sadani Darbar) Of N.H.-30 in the State of Chhattisgarh through EPC Basis.
Supervision by Authority Engineer of Design Engineering Procurement for Construction of Buildings of State Disaster Management Authority at district Lucknow UP INDIA on EPC basis
Design Construction Testing Commissioning and Operation and Maintenance of Infrastructure Works at Integrated Manufacturing Cluster Khurpia Uttarakhand under Amritsar Kolkata Industrial Corridor on EPC Basis
Construction of 4 lane Flyover with 2 loops and 2 ramps at Shaheed Path Intersection, RHS bank of Gomti River, Lucknow (UP) on EPC Basis
Project Management Consultancy Services for Proof Checking, Construction Supervision for Design and Construction of Down ramp of PVNR Expressway at Laxminagar, Hyderabad under EPC basis.
Construction of Long Term Measures for 3 Nos. of Black Spots Locations at Sundari, Kishanbazar and Manikpur in the state of Assam on EPC basis.
Selection of Contractor for Integrated Infrastructure Development Works, in Atal Puram Township at Gwalior Road Agra in the State of Uttar Pradesh on EPC basis
Stage strengthening work from km 133.00 to km 137.684 of NH-117 in the Dist. of South 24 Parganas, W.B, during the year 2019-20 on EPC mode. Job No. 117-WB-2019-20/449
Appointment of Third Party Inspection Agency TPIA for implementation of UGPL system to the command area of Manjore Irrigation Project, Athmallik in Angul District of Odisha on EPC Turn Key Basis
Construction of Barrage cum Bridge across river Koel near village Hamirpur on EPC Turn Key Basis including power connectivity system and operation and maintenance of complete commissioned project for five years
Construction and Development of Company Garden in Saharanpur with 5 years of Operation and Maintenance Period including one-year Defect Liability Period on EPC (Turn-Key) basis under Smart City Mission
Construction of Railway Over Bridge of Level Crossing No.GJ-152 in Railway Km.1225/8-9 Between Jabalpur-Nainpur Road in District Jabalpur in the State of Madhy Pradesh on EPC Mode.
Construction of VUP at Km. 173 130 RICCO Junction for permanent rectification of blackspot ID RJ 06 33 on Nagaur Bikaner section NH 62 in the state of Rajasthan on EPC Mode
Strengthening of NH-13 from km 632.450 to km. 650.615 (18.165 Km) and protection measures at km 37.850 on NH-315 under Annual Plan for the year 2023-24 under EPC Mode
Widening of 2-lane to 4 - lane in ch. 155.100 toch. 160.700 from i.s.b.t to railway crossing of nh -72 (new no-7) in distt - dehradun in state of uttrakhand epc mode
Work of Strengthening of road from km 24.50 to km 46.95 including improvement of service road in Sohna and Nuh city of NH-248A in the State of Haryana on EPC mode.
Rehabilitation and Upgradation to 2LPS configuration of Near Karri Village to Etawah of NH-92 in the State of UP under GNHCP with the loan assistance of World Bank on EPC mode.
Micro-Irrigation Schemes in the command of the existing canal outlets of various distributaries at Km 2.900 TR of Meghot Mr. of Village Bighopur, Dholera and Khawajpur of District Mahendergarh. EPC Mode
Work of Periodic Renewal from km. 28.580 to 29.639, Km. 30.029 to km. 30.060 and km. 30.659 to km. 44.843 of NH-334DD on EPC mode in the State of Uttar Pradesh
Construction of 1x15 Mtr span steel girder Bridge at Naid Hanjan on Qaimoh Kadder in KM 10th in place of existing damaged 03 Mtr span RCC culvert (under NABARD XXX) ( EPC mode)
Construction of Mau Jod To Gulawata To Dhamnda To Khujner Road Tehsil Sarangpur Dist Rajgarh Total Length 22.40km. On EPC Mode First Call Estimated Cost Rs. 2953.99 Lacs work period 540 days
Authority Engineer/PMC supervision for supervision of construction of one Flyover at Km 2.735 and one Major Bridge at Km31.260 on NH 730 in the State of Uttar Pradesh Under EPC Mode