Loading…
Loading…
25,582 results • Best match
Construction of road from km 70.000 to km 113.000 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Rehabilitation and Upgradation to 2LPS configuration of Koyyuru to Chaprathipalem section of NH-516E in the State of Andhra under GNHCP with the loan assistance of World Bank on EPC mode.
Rehabilitation and Upgradation to 2L configuration of Hamirpur-Karnohal Section of NH - 70 in the State of Himachal Pradesh under GNHCP with the loan assistance of World Bank on EPC mode
Strengthening of NH-248A Shahpura - Alwar road Section from Km 48/700 to 62/00 on EPC Mode (Total 13.300 Km) in Rajasthan (Job No. NH-48A-RJ-2019-20/741)
Consultancy Services for Authority Engineer for supervision of 2-laning of Longding - Tissa - Khonsa road (NH-215) (Km 0.00 to Km 42.50) on EPC mode in the State of Arunachal Pradesh
One time improvement from km 26.350 to km 29.900 of NH-43 length 3.55 km in Badwara village on Katni-Shahdol section in the State of Madhya Pradesh under EPC mode
Consultancy Services for Authoritys Engineer for supervision of Rehabilitation and Up-gradation of Jarud - Sirsala section of NH-361F to 2LPS- Four Lane in the state of Maharashtra on EPC mode.
Construction of 4-lane major bridge on Ghaghar river including approaches at km. 176/090 of Suratgarh -Sri Ganganagar section of NH-62 in the state of Rajasthan on EPC Mode
Work of stage strengthening of existing road from Km. 79.350 to Km. 107.000 (excluding Km. 99.00 to Km.104.00) of NH-731K in the State of Uttar Pradesh under EPC mode
Consultancy services for AE for supervision of 4-laning of Ponda to Bhoma section of NH-748 from Km 125.440 to Km 135.050 in the State of Goa on EPC Mode.
Strengthening and Improvement of riding quality of road from Kakraban Motor Stand to Kukipara Galachipa via Mirza Bazar L 18.00 km under Gomati District, Tripura on Engineering, procurement Construction EPC mode
Construction upgradation of road Km 504 pt 871 to Km 509 pt 725 Lambagarh to Benakuli incl Benakuli land slide on road Joshimath mana under EPC mode NH 07 in Uttrakhand
Periodical renewal on NH 315 from km 40.000 to km 56.485 (Total length-16.485 km) on EPC mode under Annual Renewal Programme (ARP) 2020-2021 in the state of Arunachal Pradesh.
Construction of two lane with paved shoulder from existing Km. 0.000 to Km. 55.610 (Des. Ch. 0.00 to 54.048) of NH-124D on EPC mode in the state of Uttar Pradesh.
Strengthening to NH61 Kalyan Nirmal Jagtial road from Km 707.055 to 719.055 and 734.550 to 745.550 under NHO for the year 2019 20 in the state of Telangana under EPC mode
Construction of Borigumma Bypass on NH-26 from Km 317/400 to Km 320/700 (design chainage 317/400 to Km 321/415) in the state of Odisha on EPC Mode
Balance Work of Construction of two/four lane with paved shoulder from km 422.00 to 523.600 (Chitradurga to Shivamogga Section) of NH 13 in the State of Karnataka on EPC mode
Construction of Foot Over Bridge (FOB) near Holy Shrine, Bambolim at Km 524.330 on NH-66 in the state of Goa on EPC Mode under Road safety Annual Plan 2023-24.
Periodical Renewal from km 137.4 to 140.0 and Km.150.0 to 152.0 of Jagityal Karimnagar Warangal Khammam Section of NH 563 in the state of Telangana on EPC Mode 2nd Call.
Construction of 5 nos Foot Over Bridges (FOBs) at Km.92.830, 110.200, 113.200, 118.350 and 122.270 on Yadgiri-Warangal section of NH-163 in the state of Telangana on EPC mode
CS for AE for Supervision of Construction of Six Lane Elevated Kona Expressway from Km. 0.145 to Km. 7.337 of NH-117 in the state of West Bengal on EPC mode
SLOPE REHABILITATION WORKS (SRW) BETWEEN KM 56.490 TO KM 56.600 ON ROAD ON BALIPARA-CHARDUAR - TAWANG UNDER 91 RCC/14 BRTF IN WEST KAMENG DISTRICT OF ARUNACHAL PRADESH THROUGH EPC MODE
Construction of 2 lane Greenfield highway from km 134.737 to Km 163.253 Sagar Link Road Berkhedi Sagar Stage 1 under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode.
Supervision Consultant services during OnM phase for 4lane with paved shoulder config of NH709B in the stretch from EPE Crossing to start of Shamli Bypass in Uttar Pradesh on EPC mode.
CONSTRUCTION OF CONNECTING ROADS TO IMB FENCE (49.00 KM) ALONG INDO-MYANMAR BORDER FROM BP-159 TO BP-162 IN LONGDING AND TIRAP DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
CONSTRUCTION OF CONNECTING ROADS TO IMB FENCE (33.00 KM) ALONG INDO-MYANMAR BORDER FROM BP-164 TO BP-166 IN TIRAP AND CHANGLANG DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
Construction of 2 nos. Foot Over Bridges (FOBs) on Standalone basis at Km. 45.240 Km. 54.640 on Galgalia-Araria section of NH- 327E in the state of Bihar on EPC mode
CS for AE for Supervision of Construction of 4 Nos of Standalone safety structures/works at different locations on various NHs (Package II) in the State of Maharashtra on EPC Mode
Construction of upgradation of carriageway km 180.200 to 188.700 of Raebareli-Prayagraj section of NH-30 (Old NH-24B) in the State of Uttar Pradesh on EPC Mode.(Re-Invitation 2nd)
Rectification of Blackspot TN-03-303 by Construction of 6 lane VUP at Km 203.995 in Madurai - Kanniyakumari section of NH-44 in the State of Tamil Nadu on EPC Mode
CS for AE for Supervision of Construction of 11 Nos of Standalone structures/Safety works (Package III) at different locations on various NHs in the state of Maharashtra on EPC Mode
Construction of Foot Over Bridges in Gurgaon Kotputli Jaipur section of NH8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode
Initial improvement works under Tolling Operation and Transfer of Chittorgarh Bypass to Kota Section (from km 891.929 to km 1052.429) of NH 27 in the State of Rajasthan on EPC Mode
Four Lanning of Ratapani Stretch from Km. 8.300 to Km. 20.680 (length 12.380 Km.) of Obedullaganj Itarsi section of NH46 (Old NH69) in the state of Madhya Pradesh on EPC Mode
Construction of Vehicular Underpass (VUP) (6-Lane) 1 No on Hisar-Dabwali section of old NH-10 (new NH-09 at Chainage-218.276 in the State of Haryana on EPC Mode
Four Laning from Design Km 255.140 to Km 270.270 of Addahole-Bantwal section of NH-75(Old Nh-48) Under NHDP Phase IV on EPC Mode in the state of Karnataka
Construction of 02 Nos of LVUPs Km 550.111Technopark Phase III and Km. 550.330 Mukkolakkal Jn in front of Technopark Phase III of NH66 in the state of Kerala on EPC Mode
Balance Work of Four laning of Panvel Indapur section of NH-66 (Old NH-17) from km 42.300 (Kasu) to km 84.600 (Indpaur) in Maharashtra under Bharatmala Pariyojana on EPC mode
Improvement works of Borkhedi Wadner Deodhari Kelapur Maharashtra/ Telangana Border from km 36.600 to km 175.000 Section of NH 44 (old NH-7) in the state of Maharashtra on EPC Mode
Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode
6 laning of existing 4lane stretch of NH44 from Gundlapochampally Design chainage km 471.300 to Bowenpally Design chainage km 481.331 total length 10.031 km in Telangana on EPC mode under BMP
Four Laning of the Project Highway from End of Pinjore bypass Baddi Nalagarh Section Km 4.200 to 35.395 of NH21A New NH105 in Haryana and Himachal Pradesh on the EPC Mode
Implementation of Road Safety Works on Six Lane of Etawah to Chakeri Section of NH 2 from Km 323.475 to Km 483.687 in the state of Uttar Pradesh on EPC Mode
Construction of 6 laning from Belgaum to Sankeshwar Bypass from Km. 515.000 to Km. 555.017 of NH-48 in the state of Karnataka on EPC mode under Bharatmala Pariyojana (Package-I)
Construction of New Major Bridge over Baghmati and Lakhandei River along with Approaches from Design km.16.500 to km.21.500 on NH-527C in the State of Bihar on EPC Mode
Construction of Jharsuguda Bypass on NH-49 from CH 258.636 km to CH 283.300 km (design chainage from Km 258.636 to Km 289.876) in the state of Odisha under EPC mode
Develop. of 6lane GF PKG-IIA starts from Ch.23.325 to Design ch. 32.090 around Kanpur city (Length 8.765 kms) in the state of Uttar Pradesh on EPC mode (2ND CALL)
4 Laning of Mohari to Satai Ghat sec NH 934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package 2) in the State of Madhya Pradesh on EPC Mode.
O and M and other Road Safety Works on Muzaffarnagar Haridwar Sec of NH334 from Km 130.500 to Km 206.220 in the State of Uttar Pradesh and Uttarakhand on EPC Mode
Widening, Reconstruction and Up-gradation to 2 LPS/ Four Lane configuration for the work of Ahmednagar to Sabalkhed and Ashti to Chinchpur Section in the state of Maharashtra on EPC mode.