Loading…
Loading…
25,582 results • Best match
Development of 6 lane GF(PKG IIB)starts from Design Start from Ch.32.090 to Ch.51.200 around Kanpur city(Length19.110 kms)in the state of Uttar Pradesh on EPC mode
Construction of road from km 113.00 to km 167.75 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Permanent restoration of NH 144 section from km 24.000 to km 67.500 Domail katra Reasi Bhamla road in the District Reasi in the UT of Jammu and Kashmir on EPC mode.
Improvements and widening to 6 lane plus PS with drains from Km 14.200 to Km 18.600 of Hyderabad to Bhopalapatnam section of NH 163 in state of Telangana Under EPC mode.
Periodical Renewal from km 157.0 to 1600 and Km. 169.0 to 175.0 of Jagityal Karimnagar Warangal Khammam Section of NH 563 in the state of Telangana under EPC Mode 2nd call.
Construction of Major Bridge with approaches across Andhari River on Design Km 249.724 on Mul Chandrapur Road NH 930 in the Chandrapur District in the state of Maharashtra on EPC Mode
Strengthening work in Ch. 123.00 to 142.00 of NH-333A on EPC Mode in the State of Bihar for the year 2019-20(Job No. NH-333A-BR-2019-20/21)
Construction of proposed half clover leaf interchanges cum ROB at Yerramanchi and Gudipalli villages across NH44 at km 416.005 in the state of Andhra Pradesh on EPC Mode under NH(O)
Construction work of flyover at the junction of Bhopal Dewas Road and Bhopal Bypass Road near Phanda village on Bhopal Dewas road in the State of Madhya Pradesh on EPC mode.
Rehabilitation and Upgradation of Satana to Mangrul (Chandwad) section of NH-752G Design Ch Km 64.000 to Km 101.140 2LPS Four Lane configuration in the state of Maharashtra on EPC mode.
Balance work with Steel superstructure including approaches of new bridge over Gandak river in km. 423.00 - 424.00 of NH -28 (New NH - 27) in the state of Bihar on EPC mode.
Improvement of Riding Quality from km 120.00 to km 130.00 and km 140.00 to km 145.00 on NH-202 under NH Division Tuensang in the state of Nagaland on EPC Mode
Construction of new 3-Lane Major Bridge over River Brahmani at Km. 401.250 of NH-200 (New NH-53) in Duburi-Chandikhole Section in the State of Odisha on (EPC) Mode
CONSTRUCTION and COMMISSIONING of Millets Common Facility Integrated Production Center at 07 Locations (basic infrastructure and core facility as per RFP technical documents) in Andhra Pradesh on EPC mode Cluster 1
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border SH:- Lateral & Axial Road, Barmer Sector, Package-I, including 5 years maintenance (On EPC Mode).
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH :- Lateral road, Jaisalmer South Sector, Package - IV) including 5 years maintenance (On EPC Mode).
Construction of Lateral & Axial roads in the state of Punjab & Rajasthan along the Indo - Pakistan Border. (SH :- Lateral road, Jaisalmer South sector, package-II) including 5 years maintenance (On EPC Mode).
Construction of Residential Quarters (Type-VII) One Unit and Type-VI 3 Units for the Central Institute of Buddhist Studies using Steel Structure, Choglamsar, Leh, UT of Ladakh (EPC Mode-I)
Widening to 2Lane with paved shoulder from Km 197.270 to Km225.610 and KM241.500 to KM243.300 of NH148B Surewala chowk to Haryana Punjab Border in the state of Haryana on EPC Mode
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH :- Lateral road, Jaisalmer North sector, Package-I) including 5 years maintenance (On EPC Mode).
Rehabilitation and upgradation of Trimbak - Mokhada - Jawhar - Manor - Palghar section of NH-160A to 2-lane/4-lane with paved shoulder (107.035 km) in the State of Maharashtra on EPC Mode.
Construction of Passenger Terminal Building Warehouse Cargo Administrative Building and external development and allied services on EPC Mode (Design and Build Basis) at ICP Sutarkandi Kareemganj Assam on Indo Bangladesh Border.
Construction of Ambikapur Bypass From Sanjaynagar to Rajpuri Khurd on Ambikapur Ramanujganj Garhwa Road of NH353 to Two Lane with Paved Shoulder Configuration on EPC Mode in the state of Chhattisgarh
Construction of 9 nos. FOBs between Pandoh to Manali section of NH-21 (Now NH 03) from km. 221.305 to km. 309.345 under EPC Mode in the state of Himachal Pradesh.
Construction of four lane Arrah bypass (Asni to Baonpali) from Km 0.000 (Design Chainage) to Km 4.500 (Design Chainage) of NH319 (Old NH30) in the State of Bihar on EPC Mode
Construction of Lateral and Axial Roads in the state of Punjab and Rajasthan along the Indo -Pakistan Border (SH:Lateral Road, Barmer sector, package-II, including 5 years maintenance on EPC mode).
Construction of road from km 19.554 to km 70.000 of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
One time Improvement of Bypass stretches at Mudigubba from Km 130.392 to 138.141 on NH 42 in Sri Satya Sai District of Andhra Pradesh State under NH(O) on EPC Mode
Up-gradation to Intermediate lane of NH-301 Kargil- Zanskar Road from Km 87.000 to Km. 98.524 in the UT Ladakh (Formerly State of JnK)on EPC mode (under NH(O))
Periodical Renewal (PR) work from km 130.400 to km 135.000 and km 154.000 to km 168.000 of NH 28B (New NH -727) on EPC mode in the State of Uttar Pradesh.
Const. of Descoped Portion of Binnaguri Bypass in Binnaguri Mouza of NH27 Old NH31D from Ch.17.500 to 23.000 of NH31D in the District of Jalpaiguri West Bengal on EPC mode
Rehabilitation and Up-gradation of Jarud - Sirsala section of NH-361F km 59.500 to km115.00 to Two lane with paved shoulder/ Four Lane in the state of Maharashtra on EPC mode.
Design, Build, construct, install, commissioning of compost plant of 70.5 TPD for wet waste along with operation and maintenance of plant for 5 years including the tipping fee on EPC mode.
One Time Improvement of existing carriageway in Deoli Town with white topping (Length 3.200 Km.) on Yavatmal to Wardha Section of NH-361 in the State of Maharashtra on EPC Mode
Rehabilitation and upgradation of Askot Lipulekh on EPC basis for Phase-I existing Km 72.000 to Km 107.620 Design Chainage Km 21.330 to Km 56.935 under Project Hirak of BRO in the State of Uttarakhand
Design and Construction of UG & PG Hostel G Plus 3 Floor Girls of 500 capacity and dining hall Ground floor for Central University of Karnatak at Kalburgi,Karnataka, including Internal water supply, sanitary installations, draining, overhead terrace ... on Engineering , ... Engineering, procurement and Construction EPC basis . ...
design and Construction of UG and PG Hostel G Plus 3 floors for Girls of 500 capacity and dining hall Geound floor for CUK at Kalaburgi, Karnataka including Internal water supply, Sanitary Installations, drainage, overhead terrace tanks,rain water ... on Engineering ,Procurement ... Engineering, Procurement and Construction EPC basis . ...
Upgradation of existing ESIC Hospital from 50 Beds to 100 beds at Hubli, Karnataka. SH: Planning, Designing and Construction of a Hospital project (Civil, E & M and all other works) consisting of 50 Bedded Hospital Building, Canteen building, ... on Engineering , ... Engineering, Procurement and Construction (EPC) ... ( EPC ) ... (EPC) basis for ...
Design, engineering, fabrication, supply, installation, commissioning, trial run, training and demonstration of Vertical Shaft Furnace on Turn-key basis
Replacement of Old Design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of - 134.561). SH: Replacement of old/damaged existing border security fence with new design fencing ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode III. ...
Construction of 500 Bedded District Hospital at Dharashiv Taluka Dist Dharashiv With other Ancillary Works and Facilities on EPC Engineering Procurement and Construction Mode
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of EPC project Widening to 2 lane with paved shoulder and strengthening from Km 173/370 to Km 229/400 of NH-59 on EPC mode in the state of Odisha
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of EPC project Widening and strengthening to 2L and PS from km 277/500 to 318/970(Kandarapur-Balikuda) of NH-55 in the state of Odisha on EPC mode
EPC KN-II (6A) - Construction of Concrete Pavement road and Reconstruction and widening of Bridges and Culverts for Revanda Bridge to Borli to Murud MSH-4 Km.280/745 to 310/145 Total Length 29.40 Km. Tal. Murud, Dist. Raigad on EPC mode
EPC AM-II (43A) - Improvement to road MSH 12 Dongarkinhi Medshi Ridhora Rajura Kutardoha Kinhiraja Kata Washim Kekatumra Borkhedi road SH 400 km. 44/00 to 69/600 Tal. Malegaon and Washim Part MSH 12 to Kata Washim Dist. Washim on EPC mode
Establishment of Centre of Excellence Dairy Farm cum Training Centre,at Mohal Basal, up Mohal Thakurdwara, Tehsil and District Una, Himachal Pradesh, India, PIN 174303 on Turnkey basisand on Engineering, Procurement and Construction EPC.
Deep Drilling, DevelopmentandS tabilization of (02 Nos) 200 mm dia mini Tube wells (on EPC Mode) By ODEX Method at TRT Nagrota in District Jammu under Civic Action Programme 2024-25
Expansion of Supreme Court Building for creating Additional Court Rooms including Constitutional Court Chambers for the Judges and facilities for Lawyers & Litigants (EPC Mode-I) Subwork/Packages: Providing services highly specialized professional/ consultant for SE cum PD/ AGD (Delhi) Office.
Widening/Strengthening/Up-gradation to two lane with paved shoulder from existing chainage Chainage 148/170 (Junction with NH-8) to 211/100 (Deval-Dungarpur- Hirata- Varda- Sagwara) Section of NH-927A in the State of Rajasthan on EPC mode.
Custom Bid for Services - EPC Contract of 100 kWp Roof top Solar Project at PBCMP Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Ground Mounted Solar Power Plant Service