Loading…
Loading…
25,584 results • Best match
4 Laning of Jagadhri Tajewala road section from Yamunanagar bypass Design Ch. 0.223 to Tajewala Design Ch. 32.300 of NH-907 under NH(O) (Design length 32.523 km)(Pkg1) in Haryana on EPC Mode
Construction of underpass at Spinning Mill junction and other miscellaneous works such as highway lighting service road etc in Thalassery Mahe Bypass section of NH 66 in the State of Kerala on EPC Mode
Construction of 4lane South-East Bypass for Azamgarh City connecting NH-28 at existing Ch. Km 218.800 to Purvanchal Expressway at existing Ch. Km 247.850 (total length 14.905 Km) in UP on EPC Mode
Construction of Agra Bypass (Northern) connecting km. 174.500 of NH-19 (old NH-2) to km 141.000 of Yamuna Expressways in the district of Mathura in the state of Uttar Pradesh on EPC mode
Balance Work of Four laning of Panvel-Indapur section of NH-66 (Old NH-17) from km 0.000 (Panvel) to km 42.300 (Kasu) in the State of Maharashtra under Bharatmala Pariyojana on EPC mode
Permanent Rectification of Black Spots TN-(02)-522, TN-(05)-062, TN-(05)-065 in Puducherry to Tindivanam section of NH-32 (Old NH-66) in the State of Tamil Nadu on EPC Mode
RFP for 6-laning of Kanhauli-Ramnagar section of SH-78 (declaration of NH under consideration) from design Ch.Km 0.000 to Km 39.160 on EPC Mode in the State of Bihar under Bharatmala Pariyojana
CS for AE for Supervision of Upgradation and strengthening of Nashri Chenani section from Km. 0.00 to Km. 39.100 of NH244 in the UT of Jammu and Kashmir under NH(O) on EPC mode
Construction of bypass to Mozari town on NH53 (Old NH6) Taluka Tiwasa Dist. Amravati (Existing km. 118.700 to km. 124.400) (Design km. 0.000 to km. 6.100) in the State of Maharashtra on EPC mode
Construction of Underpass at Sohal Town on Pathankot-Amritsar Section of NH-15 from Km.6.082 to Km.108.502 at Ch. 43.500 under Rectification of Blackspot in the State of Punjab on EPC mode
Reconstruction of Major Bridge at LHS of Km. 79.520 (Existing) (span (7.22.85) (3.27.40) width of structure including crash barrier 12.5m) section of NH 44 (old NH7) in the state of Maharashtra on EPC mode
Construction of Bypass for Jamb Junction at Ch. 61.100 to 64.662 and VUPs at design Ch. 61.878 and 63.845 for Jamb Junction in the State of Maharashtra on EPC mode. Regarding appraisal by IAC
Construction of Foot Over Bridges with Lift facility at 04 Nos of locations between Km 107.100 to Km 268.300 on Gurgaon Kotputli Jaipur section of NH 48 in state of Rajasthan on EPC Mode
CS for AE services for Widening to 6Lane of Existing 4lane Jetpur Gondal Rajkot Sec from Km. 117.600 to Km. 185.00 on NH27 in the state of Gujarat on EPC Mode under Bharatmala Pariyojana
CONSTR OF RD SUMDO NIDDER RHONGO FROM KM 30.00 TO KM 60.540 NEW TO NHSL SPECS THROUGH EPC MODE (NET LENGTH 30.540 KM) UNDER 93RCC 755 TF PROJECT HIMANK IN LADAKH (UT) PACKAGE II
Construction of 4 lane LVUP at Dhakoli Junction (on Zirakpur Parwanoo road) at Km 39.784 on Ambala-Chandigarh section of old NH-22 (New NH-152) in the State of Punjab on EPC mode
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF 4 LANING OF BARHI KODERMA SECTION OF NH 31 FROM KM. 0.000 TO KM. 27.500 IN THE STATE OF JHARKHAND UNDER NHDP PH IV ON EPC MODE.
AE for Construction of Additional Structures including approaches in Vadodara Surat section of NH48 between Existing Km 108.000 to Km 250.000 of NH48 on EPC mode under NH(O) in the state of Gujarat
Construction of Elevated Corridor in Ranchi city from km 0.00 to km 3.570 of NH75 including down ramp on NH23 from km 0.000 to km 0.610 in the State of Jharkhand on EPC mode
Consultancy services for Authority Engineer for Construction of 6 Lane Elevated corridor at Kagal city on NH 48 and Umbraj on NH 48 under NH(O) in the State of Maharashtra on EPC Mode.
Construction of Foot Over Bridge at Eleven locations at Six laning of Varanasi -Aurangabad Section of NH -2 from Km. 786.000 to km. 978.400 in the state of UP and Bihar on EPC Mode.
REHABILITATION UPGRADATION TO 2LPS FOR GANDHIGRAM REALIGNMENT WITH MAJOR BRIDGE FROM CH. 24.250 to CH. 27.200 (TOTAL LENGTH 2.95 KM) ON NH-161A (AKOLA-AKOT SECTION) IN THE STATE OF MAHARASHTRA ON EPC MODE.
Upgradation of NH 130A Mungeli to Pondi from NH Km 51.600 to Km 77.870 and Km 80.970 to Km 96.970 to two-Four lanewith paved shoulders in the state of Chhattisgarh on EPC mode.
Strengthening of 2 lane with paved shoulder from Surajpur (Shilfili) to Ambikapur (from Km 363.000 to 373.500, total length of 10.50 Km) section of NH-43 on EPC mode in the State of Chhattisgarh
DEVELOPMENT AND BEAUTIFICATION OF HDI PLAYGROUND CONSISTING OF CONSTRUCTION OF GALLERY, SYNTHETIC TRACK, PICKLE BALL COURT, PAVER BLOCK AREA, RCC DRAINS, SOIL FILLING AND LAYING OF GRASS ALONG WITH OTHER ANCILLARY WORKS (EPC MODE).
Strengthening on NH 22 New NH 05 on Kalka Shimla Wangtoo road from Km 208 700 to 214 00 and 223 500 to 236 00 in the State of Himachal Pradesh on EPC mode
Reconstruction of four lane including divider work from Vijay VallabhChouraha up to Manasar bridge Via MundwaChouraha at Nagaur (left out city portion) of NH-62 in the state of Rajasthan on the EPC mode
Work of IRQP of road work from km 29.000 to km 49.000 of NH-419 in the State of Jharkhand under EPC mode.(JOB NO- NH-419-JHR-2021- 22-305),(Length-20 km).
Construction of Approaches of RUB at LC.21 at Kokisare near Vaibhavwadi village on new alignment design length 1.770 Km on Talere Gaganbawada Kolhapur NH16 6G in the State of Maharashtra on EPC mode.
Design and Construction of R.O.B. At NE Railway Level X-ing No. 16-C AT KM 19/2-3 between Mohibullapur - BKT Railway Station on BKT - Asti Road in Distt. Lucknow on EPC Mode.
Improvement of the service road i.e. conversion of flexible pavement to rigid pavement on the service roads of Package 1 2 and 3 of UER II in the State of Delhi on EPC Mode.
Rehabilitation and Up-gradation to 2 LPS/ 4 laning configuration of Chikhli-Dabhadi-Talegaon-Pal Phata section of NH-752H from Km 179.430 to Km 141.800 in the State of Maharashtra on EPC Mode.
Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locations under EPC mode.(As per DPR submitted by THDC) under Annual Plan2022-23in the State of Uttarakhand
Construction of bridge, approach roads, additional approach roads, and protection works over the Gomti River In place of Pipa Pul on Murarchak-Katsari road in Constituency of Lambhua in Distt Sultanpur on EPC Mode.
Upgradation and Rehabilition to two lane with paved shoulder of Ghagriya Munabao section from km 69.910 to km 126.355 of NH-25 Ext. (Design length 56.445km) in the State of Rajasthan on EPC mode.
Construction of new 2-lane Major Bridge (Length- 144m) on Terna River at Km.227.311along with approaches on Mantha-Latur-Omerga-Nagansur section of NH-548B on EPC mode in the State of Maharashtra.
Upgradation of NH-130A Mungeli to Pondi from NH km 51.600 to 77.870 and km 80.970 to 96.970 to Two-Four Lane with Paved Shoulder Configuration in the state of Chhattisgarh on EPC mode
Design and Construction of 02 lane ROB in lieu of LC No. 263 - B at KM. 1150/34-36 of Moradabad - Lucknow Rail Section on Pratapnagar - Madhoganj Road In District Hardoi on EPC Mode.
Widening to Six Lane of Existing Four lane Jetpur-Gondal-Rajkot Section from Km. 117.600 to Km. 185.00 on National Highway No.27 in the state of Gujarat on EPC Mode under Bharatmala Pariyojana
Construction of 3 Nos of Standalone safety structures/works at different locations on 4 lane Wakhari Dharampuri section of NH-965 (Sant Dnyaneshwar Maharaj Palkhi Marg) in the state of Maharashtra on EPC Mode.
Consultancy Services for DPR Preparation on EPC mode for Construction in km 109.7 to km 158.50 of NH-343 (Ramanujganj to Garhwa Road) in the State of Jharkhand including Land Acquisition and Utility Shifting
Construction and development of Tourist spots in Malshej Ghat section of NH -61 i.e. Kalyan Nirmal Road in km 89/000 to 93/000 District Thane in the State of Maharashtra under EPC mode
IRQP (2019-2020) from 220 km to 230 km and 231 km to 241 km (20.00 km) on NH-202 (155 Old), under NH Division Kiphire in the State of NG on EPC Mode
Construction of AIIMS at Awantipora (KASHMIR) Jammu & Kashmir (on EPC Mode 3 basis). SH: Providing services of computer operator, MTS and Security Guard for the office of CE cum ED AIIMS (Kashmir) Awantipora, Project.
Construction of Permanent campus of Indian Institute of Information Technology Raichur Karnataka EPC Mode II basis. SH Supplying and Fixing of 2.8/3 KVA UPS for Civil and Electrical Sub Division CPWD at Kalaburagi.
Consultancy services for preparation of DPR for Rehabilitation of existing Major Bridges across Penna river at Km.739/4 on NH-67 in the State of Andhra Pradesh under NH(O) on EPC mode.
Construction of 0.5 TPD Biogas plant at Boyakonda Gangamma Devasthanam Goushala, Chittoor in Chittoor District, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Consultancy services for preparation of DPR for Rehabilitation of existing Major Bridges across Penna river at Km.739/4 on NH-67 in the State of Andhra Pradesh under NH(O) on EPC mode.
Construction of 4.0 TPD Biogas plant at Gayatri Goseva Samithi, NH-44, in Kurnool district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Construction of 1.0 TPD Biogas plant at Gurramkonda Gram Panchyat Vegetable Sub Market, Anamaya District, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode