Loading…
Loading…
25,584 results • Best match
Construction of standalone Toll Plaza at km 24/200 on Sagar-Khurai-Bina section of NH 26-A (New NH 934) on EPC mode under NH Division Sagar in the state of Madhya Pradesh
Construction of Bridge over River Mansaita including its Approach road and Protection work at K.M. 09 of Phaphamau Sahsoan Hanumanganj Road in District Prayagraj as per attached GAD and silent Features on EPC MODE
Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode
Strengthening of Tumsar to Bhandara section of NH-543K from Km 82.00 to Km 112.00 (excluding section from Km 108.00 to 110.00) on EPC Mode in the State of Maharashtra. Total Length 28.00 Km
Stage strengthening from km.100/00 to km. 134/00 on NH-37 (Old)/ NH-17 (new) for the year 2019-20 under Guwahati NH Division in the State of Assam under EPC mode.
Appointment of Technical Consultant for Carrying out Geo technical investigations Preparation of Preliminary Drawings for Calculation of Quantities Preparation of BOQ Estimation and Costing Preparation of Bid document on EPC mode for proposed elevate
Construction of 02 Lane Rail Over Bridge at Level Crossing No 300-SPL Chowka Ghat Budhwal Block Section KM713 16 18 on Gonda Lucknow N.E. Railway Rail Section in Distt Barabanki on EPC MODE
PMC Work For Construction Of Surface Parking For Temple Complex Gata No 57 Majha Jamthara Udya Crossing and Surface Parking For Temple Complex Near Gata No 01 Brahmakund Ayodhya UP India On EPC Mode
Construction of a New Bridge over river Kuthori (Br.no-352/1) on NH-715 (Old NH-37) in the state of Assam under EPC mode- Job No. Br.352/1/AS/2021-22/222
Widening to two lane with geometric improvement from Km. 208.00 to 214.00 Km with paved shoulder on NH-40E in the state of Meghalaya on EPC mode. (Job No.- 40E/2019-20/MG/153)
Construction of VUP at Km 114.000 134.000 AND LVUP at Km 114.800 129.490 172.280 of NH58 Beawar Gomti section in the state of Rajasthan on EPC mode in Road Safety Annual plan 2022 23
Consultancy services for (AE) for supervision of Widening and Strengthening from Km. 15.000 to Km. 58.600 (Bhadewara-Dramandganj section) of National Highway No. 135 C in the state of Uttar Pradesh on (EPC) Mode
Widening the left out existing 2L to 2L PS and Strengthening the selected stretches from Km 9/6 to Km 15/6 of NH 381A (Vellakovil - Sankari road) on EPC mode in Tamil Nadu
Consultancy services for Authoritys Engineer for supervision of Construction of four lane of Chausa_Buxar Bypass from km 45.000 to km 65.915 (Package 2) of NH 319A in the state of Bihar on EPC mode.
Construction of ROB in lieu of Level Crossing No. RB-36 with 10.50mtr carriageway width in between Baripada to Bhanjapur Station in the District of Mayurbhanj under State Plan through EPC mode of Contract
Rehabilitation and Upgradation of Injegaon to Pathari , Borgavhan to Selu and Digras Phata to Deogaon Phata sections of NH 548 B to 2-4 LPS configuration on EPC mode in the state of Maharashtra.
Design Engineering and Procurement for Construction of Mechanized Multilevel Smart Parking in Ram Kot near Ram Mandir in District Ayodhya UP India on EPC mode including Operation and Maintenance of Parking for 10 years
Design Engineering and Procurement for Construction of residences for Honble Judges of Honble High Court of Allahabad at Hahnemann Crossing Gomtinagar Lucknow and on Plot No 19 Clive Road Prayagraj UP on EPC mode
Rehab and upgradation of existing road bet Km 29.725 to Km 60.550 Suraithota to Malari NHSL to Double lane specification of Joshimath Malari (NH-107B) road on epc mode in the state of Uttarakhand
Construction of Eight Lane access controlled Expressway from Km 3 to Km 20.200 Shirsad to Akloli section Spur of Vadodara Mumbai Expressway Project in the state of Maharashtra on EPC Mode under Bharatmala Pariyojana
Stablisation of land slide and slope protection at km 474.710 to Km 474.850 and Km 475.565 to km 474.625 on Rishikesh Joshimath Mana road NH-07 on EPC Mode in the State of Uttrakhand
EXPRESSION OF INTEREST EOI cum REQUEST FOR PROPOSAL FOR PROJECT MONITORING CONSULTANT PMC WORK FOR CONSTRUCTION OF MECHANIZED MULTI LEVEL SMART PARKING IN RAM KOT NEAR RAM MANDIR IN DISTRICT AYODHYA ON EPC MODE
Design and Construction of Animal Overpass Crossing Structure at Km 113 300 Khandarmalwadi and Km 157 150 Karhe Ghat in Khed Sinnar section of NH 60 in the State of Maharashtra on EPC Mode
Design Engineering and Procurement for Construction of 192 Nos of Type B Residences for Police Personnels of Chetganj Shivpur and Cantt in Commissionerate Varanasi Police Line at Varanasi Uttar Pradesh India on EPC mode
ESTABLISHMENT CONSTRUCTION SUPPLY PROCUREMENT FABRICATION ERECTION OF MACHINERIES TRIAL RUN AND COMMISSIONING OF MRF AND WASTE TO COMPOST PLANT AT DOOMDOOMA AS PER SWM RULES 2016 UNDER SBM U ON ENGINEERING ON EPC MODE
Conducting survey using Network Survey Vehicle for the work Widening to two or four lane with paved shoulders from km180.6 to 223.0 of NH-63 on Nizamabad-Jagdalpur road on EPC mode 3rd Call
Periodical Renewal to NH-15 (Old NH-52) from km 100.00 to 109.00 for the year 2019-20 in the State of Assam on EPC mode. (Job. TA/015/AS/2019-20/152) (RETENDER)
Construction of 4 lane viaduct at the junction of Ring Road with Bathinda-Tapa section of NH-07 at Km. 212.700 in Bathinda of NH-07 in the state of Punjab on EPC Mode.
Selection of Authoritys Engineers (AE) for supervision of construction of bypass for providing Inter-connectivity amongst National Highways (NHs) arround the pratapghar city (Pratapgarh Bypass ) on EPC Mode in the state of Uttar Pradesh
Construction of 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 (Balaghat-Gondia section) of NH543 (Design Length 41.210 Km) under BMP in Madhya Pradesh and Maharashtra on EPC Mode
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-IV Buxar Spur of length 17.270 km on EPC Mode in the state of Uttar Pradesh
UPGRADATION AND RECONSTRUCTION OF UJJAIN SIMHASTH BYPASS ROAD FROM DESIGN CH. 0.000 TO CH. 19.815 TOTAL LENGTH 19.815 KM, FOUR LANE WITH PAVED SHOULDER CONFIGURATION IN THE STATE OF MADHYA PRADESH ON EPC MODE
Strengthening work from km 51 to 56 and 60 to 87 total length 34 km on NH-86 (New NH -934) on EPC mode under NH division Sagar in the state of Madhya Pradesh
Construction of Slope Protection Work at Various Locations on the Hillside between Km 67.000 to Km 106.139 of the Parwanoo Solan section of NH 22 (now NH 5) on EPC mode in Himachal Pradesh
Construction of Kasrawad bypass, Selani bypass, Khargone bypass and Bistan bypass (Total length 31.950) Section of NH-347C to Two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode
REQUEST FOR PROPOSAL for the "Construction of 3rd and 4th New Railway BG line between Attipatu and Gummudipundi for Civil Engineering, Signalling & Telecommunication, Electrical General & OHE Electrification works including utility shifting" on EPC MODE...
Construction of lateral and Axial Roads in the of Punjab and Rajasthan along the Indo-Pakistan Border (SH: Lateral and Axial Roads, Jaisalmer North Sector,Package-III including 5 years maintenance on EPC mode)
Strengthening of Existing 2-Lane 4-Lane road with paved shoulders of NH-254 from KM 82.400 to 104.200 KM from Rampura to Maur in the State of Punjab (21.80 km) on EPC Mode.
Consultancy services for Authority Engineer for Supervision of Up-gradation and Rehabilitation of section of NH-361F from Parli to Gangakhed to 2LPS/Four lane configurations on EPC mode in the state of Maharashtra.
Periodical Renewal works in km 111 to 117,121,123 to 125,128 to 140,144,148,150 to 152,154 to 159 of Chanderi-Mungawali-Bangla Chouraha road on NH-346 on EPC mode in the State of Madhya Pradesh
Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 (existing km 150.00) to Neechli Oden (Nathdwara) at Design Km 88.800 (existing km 55.950) of NH- 162E on EPC mode.
Rehabilitation and Widening work for 2lane 2 Lane with Paved Shoulder of Existing NH 80 from km 70.15 to Km 121.025 of Munger Sultanganj Bhagalpur section on EPC Mode in the State of Bihar
IRQP of road work from km 107.00 to km 134.00 (Excluding km121.650 to km122.150)of NH 114A in the state of Jharkhand under NH Division Deoghar for the year 2021-22 on EPC mode.
Consultancy Services for Authorities Engineer for Supervision of construction of four lane Nagpur-Katol section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra on EPC mode
CONSTR OF RD LUKUNG CHARTSE NEW TO NHSL SPECS INCDL LA FA WLC FM KM 0.000 TO KM 37.398 UNDER 51RCC 50TF PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (NET LENGTH 37.398 KM)
Widening to 2- lane with paved shoulders from Km. 116.800 to 149.070 (design chainages) on Hosadurga-Holalkere section of NH 173 in the State of Karnataka on EPC Mode under Annual Plan 2021-22
Removal of At-grade junctions at Panchganga Chowk in the Mohol-Wakhari section and at 61 Phata Malshiras in the Khudus-Dharampuri section of NH-965 in the State of Maharashtra on EPC mode
Construction of Administrative building at Toll Plaza (Km.1017.350 near Galia) and other works of Kalijhar-Patacharkuchi section from 1013.000 to Km.1040.300 of NH-27 in the state of Assam on EPC Mode
CS for AE for Supervision of Construction of 6lane Durg Raipur Arang Bypass sec of NH53 from Design Ch.44.500 Parsada to Design Ch.92.230 Paragaon in Chhattisgarh on EPC Mode under BMP PKG2
Construction of LVUP near Dakoha railway crossing at Jalandhar City on old NH 01 (New NH 44) at Km 370.100 including entry/exit and other related works in State of Punjab on EPC mode