Loading…
Loading…
25,584 results • Best match
Periodical Renewal of Pimpalgaon - Nashik - Gonde (Km 380 to Km 440) Section of NH-3 (New NH-60/848) from Km 380 to Km 421 in the State of Maharashtra on EPC Mode
Construction of VUP including approaches and Service Roads at Shedgaon Junction at Existing Ch.59.455 (Design Ch.59.437) of NH-44 on Nagpur Hyderabad section in the State of Maharashtra on EPC mode
Construction of 04 Culverts at Moolepadam (Km.337.830), Seminarpadi (Km.328.690), Air link Castle Athani (Km.324.335 and Km.324.210) on NH 544 in the State of Kerala on EPC mode 2nd call
Design and Reconstruction of RE wall Approaches of ROB at km 109.900 and 121.045 in Shivpuri Bypass of Gwalior-Shivpuri Section of NH-46 in the state of Madhya Pradesh on EPC mode
One time improvement in Bhandara City Section of NH-53 (Old NH-6) from km 489.646 (Design Ch. 0.616) to km 498.100 Design Ch. 9.200 in the State of Maharashtra on EPC Mode.
Consultancy Services For AE For Supervision of Four laning of Katni-Bypass of NH-7 from km 359.500 to km 378.500 length 20 km in the State of Madhya Pradesh on EPC Mode
Improvement of Highway in front of New High Court Building, Lucknow and development of Ayodhya Bypass, NH-27 (old NH-28) as a Model Stretch on EPC Mode in the State of UP
Development of Escape Ramps from Km 830 380 to Km. 830 635 and 833 600 to 833 800 on Pune Satara section of NH 48 in the State of Maharashtra on EPC Mode
Four lane with paved shoulders from Budhel Junc. to Vartej Completion period 1.5 Years Maintenance period 5 Years Y junc. Km 0.900 to Km 9.400 on EPC mode under NH (O) in Gujarat
Construction of VUP/VOP at (i) Swami Chincholi (Ch. 97.370.000) (ii) Dalaj (Ch. 109.985) on Pune-Solapur (NH 65) from km. 40.000 to km.150.050 in the state of Maharashtra on EPC mode.
Rehabilitation and Up-gradation From Km. 51.600 to Km. 75.700 of NH-321G Nuhkhas to Etah section to two lane with paved shoulder configuration under EPC Mode in the State of Uttar Pradesh.
Widening to 2 lane with paved shoulder of Jareikela (Jharkhand/Odisha Border) Dhabaleswar section from km 0.00 to km 25.450 of section of NH-320D in the state of Odisha on EPC Mode
Four Laning of left-over works including Additional Structures in Kerala-Tamil Nadu Border Kanyakumari from Km.43.000 to Km.96.714 of NH-47 in the State of Tamil Nadu on EPC Mode
P R work of khurai bypass road from km 129/200 to 139/038 on NH-934 sagar - khurai- bina road (length 9.838 km) in the state of Madhya Pradesh on EPC mode
Design Engineering and Procurement of Construction of MBBS and Nursing Boys and Girls Hostel in Dr Ram Manohar Lohiya Medical Sciences Institute at Gomti Nagar Vistar in Lucknow Uttar Pradesh on EPC mode
Periodic Renewal work from Km. 41 to 55 Ch. 40.000 to 55.000 and Km. 70 to 95 Ch. 69.000 to 95.000 of NH-330D in Uttar Pradesh of NH-330D under EPC mode
Strengthening (Improvement) of Existing Road of Sarangarh Bypassed section Including Culverts From Km.43.584 to 57.260 total 13.676 Km. on NH-216 (New NH -153) on EPC Mode in the State of Chhattisgarh
BRIDGE AT Km 24 NEAR NAU DEVIAN TEMPLE ON NH 144 EXISTING BRIDGE AT Km 17 AND Km 24 UNDER PWD DIVISION KATRA IN THE UT OF JAMMU and KASHMIR ON EPC MODE.
Reconstruction of Distressed Minor bridge over Dhari Jhora at Km 617.945 of NH-31 -New NH-17 under NH Division IX in the district of Jalpaiguri, West Bengal on EPC mode Job-568.
Rehabilitation and upgradation of NH-165 from Km 0/000 to Km 64/020 (Pamarru to Akiveedu section) to two lane with paved shoulders on EPC mode in the State of Andhra Pradesh
Widening and Strengthening/Reconstruction to 2-Lane with paved shoulder from km 12.400(Godda) to km 30.400(design chainage km 30.535) (Sunderpahari)of NH-333A in the state of Jharkhand under EPC mode
Construction of Retaining wall from Km 78.000 to 125.000 of NH 275 Bantwal Bangalore section selected reaches in the State of Karnataka under NH O on EPC mode under Annual Plan 2024 25
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation of Parli to Sirsala section of NH-361F to 2 LPS/Four lane configuration on EPC mode in the State of Maharashtra.
Widening and Strengthening of Yedshi to Jawale section of NH-63 (from Km 20/350 to 24/350 (Length-4.00 km)) to 2-lane configuration in the state of Maharashtra on EPC mode.
Construction of Major Bridges at Ch 8.00 Ch 35.488 on Wadigodri Ambad Jalna section and Ch 3.300 of Jalna Bypass road section of NH 753H on EPC Mode in the State of Maharashtra
Widening to 2 lane with Paved Shoulder from Existing Km 75.00 to Existing Km 86.20 Charmadi Ghat of Mangalore Mudigere Tumkur section of NH 73 in the State of Karnataka on EPC Mode
Design and Construction of standalone 6 lane Purmepada VUP Balance work at Km 282 800 in Dhule Pimpalgaon section of NH 3 New NH 60 in the State of Maharashtra on EPC Mode
Const of 4laning of Kotdwar Bypass of NH119 (Design Ch. 0.000 to Design Ch. 5.950) connecting Najibabad Kotdwar to Kotdwar Pauri Road in the State of Uttar Pradesh and Uttarakhand on EPC mode
Upgradation to two lanes with paved shoulder from design chainage km 98_840 to 118_813 Gavadaka to Bagasara section of NH351 in the state of Gujarat Length 19.373 Km Package III on EPC mode
Rectification of 6-Nos of accident spots in (a) Yavatmal-Wardha section of NH-361 (B) Nagpur-Kondhali section of NH-53 through combined bidding in the State of Maharashtra on EPC Mode
EOI invited for association as Joint Venture and Subcontractor from Experienced Agencies for Construction of road packages invited by MORTH in the state of Arunachal Pradesh State on EPC Mode Total 10 Packages
Construction of Regional Research Institute for Homeopathy and Integrated Ayush Wellness Centre at Guwahati, Assam including internal and External Civil services, electrical and Mechanical services and external development work on EPC mode -III
Construction of training cum examination centre 200 seater capacity and cafeteria using steel structural system technology at government polytechnic Kargil UT of Ladakh on epc mode basis(SH: providing services of inspection vehicles)
Construction of AIIMS at Awantipora (Kashmir), Jammu & Kashmir(on EPC Mode 3 basis) etc. (SH:- SITC of Hot and Colt Split ACs and providing EPABX System in Zonal Office, EE&SM(E) Office).
Construction of Lateral & Axial Roads in the state of Punjab & Rajasthan along the Indo-Pakistan Border. (SH:- Lateral & Axial road, Jaisalmer North Sector, package - II) including 5 years maintenance (On EPC Mode-I).
Construction of old age home with permanent structure using steel structural system technology in EPC mode at Kurbathang, Kargil, UT of Ladakh. (SH.:- Providing highly skilled staff for sub-division office from contingency.)
Construction of School of Engineering and Atal Bihari Vajpayee School of Management and Entrepreneurship at JNU Campus New Delhi including all Civil and MEP services, Horticulture and Development Works under EPC Mode-III
Construction of 1.0 TPD Biogas plant at Muktidhamam Goshala - Duvvuru Mandal in YSR district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode
Construction of 4.0 TPD Biogas plant at Kalahasti Gosamrakshana Trust, Tirupati, in Annamayya district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Construction of 1.0 TPD Biogas plant at Srisailam Gosamrakshana Sala, Srisailam Devasthanam, Nandyal District, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of Strengthening to NH-326A from km 70/0 to km 102/90 in the state of Odisha on EPC mode.
RFP for procurement of Contractor for Execution of 03 Nos Individual Mega PWS to Kalampur block Jaipatna block and Junagarh block of Kalahandi District including five years Operation and Maintenance in EPC Mode
GLOBAL TENDER REQUEST FOR EXPRESSION OF INTEREST FOR MASTER PLANNING AND DPR CONSULTANCY WORK FOR DEVELOPMENT OF NIGHT SAFARI AND DAY ZOO AT KUKRAIL LUCKNOW UTTAR PRADESH INDIA ON EPC MODE 2nd Calling
Construction of 4 Lane Viaduct intermediate along with re wall approaches with flexible pavement in the Elephant Corridor of Singhara Binjhabahal section of NH 6 in the State of Odisha on EPC Mode
Const. of new 4 Lane Prayagraj Southern GF Bypass from Km34.400 (near Dandupur)to design Km. 43.200 (near Mahuwari) L8.800 Km PKG1 under PhaseI in Uttar Pradesh under NH(O) on EPC mode
Strengthening work from km 10.000 to 25.000 and km 48.000 to 77.100 of NH 309B (Almora-Panar-Ghat) Under Annual Plan 2020-21 in the State of Uttarkhand under EPC Mode (Balance work)
Construction of Fly Over Bridge From Laukhedi Sewage Pump House to Nagar Nigam Visarjan Ghat, Sant Hirdaram Nagar (Bairagarh) in Bhopal City Distt .Bhopal in the state of Madhya Pradesh. on EPC Mode
Construction of ROB with approaches on NH 848B at Karambeli Railway crossing L C No 77 at km 0/0 0/600 on EPC mode under NH O in the State of Gujarat
Construction of balance work of ROB at km 30.00 of NH162E Pali Nadol section crossing Falna Marwar Railway section at LC no C67 near Somesar in the State of Rajasthan on EPC mode
Construction of twin tube tunnels on Jammu Ring Road (NH-244A) between Design Ch.50.600-51.700 and Design Ch. 53.535-55.700 on EPC mode under Residual NHDP component of Bharatmala Pariyojna Phase-I