Loading…
Loading…
25,849 results • Best match
DESIGN AND CONSTRUCTION OF PMT PSC BOX GIRDER BRIDGE AT KM 11.200 SHANIYAL 120 M SPAN ALONG WITH ITS APPROACHES SSI, PROOF CHECKING FROM IIT ON DAYALACHAK RAMKOT RD UNDER PROJECT SAMPARK IN JK (UT) THROUGH EPC MODE
Consultancy services for Authoritys Engineer for Supervision of ( CONSTRUCTION OF 4-LANE MANGALDOI BYPASS FROM KM 26.400 to km 41.500 ON NH 15 ( L- 15.10 km) UNDER RANGIA NH DIVISION IN THE STATE OF ASSAM under EPC mode)
Strengthening the selected stretches from Km 58.900 to 66.960 Km 74.000 to 75.780 and Km 104.960 to 107.760 of Pamarru Digamarru Road of NH165 in the State of Andhra Pradesh on EPC mode under Annual Plan 2019 20
Consultancy Services For Authoritys Engineer For Supervision of Upgradation and reconstruction of Jabalpur - Kundam - Shahpura section of NH-45 total Length 63.20 km to Two lane with paved shoulder in the State of Madhya Pradesh on EPC Mode
Change of alignment of NH-15 from Km 123/410 to Km 144/500 between Jaisalmer - Barmer section in view of mining area beneath NH-15 where power plant installation is planned in Barmer district on EPC Mode
Construction of 2 No of FOB at Km 267. 6 to 8 and 273.0 to 2 on Mahbubnagar Jadcherla section of NH 167 in the State Of Telangana under Road Safety Annual Plan 2022 23 on EPC mode
Upgradation and Rehabilitation of Section of NH 361F Gangakhed to Loha road Package from Gangakhed 30.400 to Loha 71.400 Upgradation two Lanes with paved shoulder Four Lane Configuration on EPC Mode in state of Maharashira. Length 41.00 Km
DESIGN AND CONSTRUCTION OF 65 MTR SPAN MAJOR PMT BRIDGE WITH STEEL SUPERSTRUCTURE THROUGH TYPE OPEN FOUNDATION AT KM 2.10 ON TIDANG-BIDANG ROAD UNDER 67 RCC/765 BRTF/CE (P) HIRAK IN UTTARAKHAND STATE ON EPC MODE
Construction of 2-lane with paved shoulder configuration of Ashta Bypass of Length 7.580 Km, From Km 82.300 to 89.880,Total design length 7.580 Kml section of NH-752C in the State of Madhya Pradesh under EPC mode
IMPROVEMENT OF RIDING QUALITY BY ONE TIME IMPROVEMENT OF LEFT OUT REACH OF AJMER-NAGAUR NH-89 (NEW NH-58) KM 0.00 TO 148.250 ON EPC MODE (JOB NO. NH-89(NEW NH-58) RJ/2021-22/760)
Construction of Pratapgarh city Bypass two lane with paved shoulders configuration from existing chainage km.74.00 to km.81.600 (Design Chainage Km00/00 to Km. 11/165) on NH-113 on EPC Mode in the State of Rajasthan.
Construction of 4-lane vehicular underpass at km 35.370 at Fatapukur alongwith Reinforced Earth Wall and Service Road in the Ghoshpukur-Dhupguri section of NH-31D (New NH-27) in the state of West Bengal on EPC Mode
Consultancy services for Authoritys Engineer for supervision of construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District Ch 0 to 22 section of Ahmedabad-Dholera Greenfield Alignment NH751 on EPC Mode
Development of section of Four Laning of Najibabad Bypass of NH119 from Km. 105.423 to Km. 118.373 (excluding 2.45 Km. of NH-74 bypass), (Total Project Length 10.764 Km.) on EPC Mode in the State of Uttar Pradesh
4-Laning of existing 2-laning stretch from Dharmapuri at km.117.000 to Lonand at km.166.400 (Pkg-IV) on Mohol-Alandi section (Design length 49.400 km) of NH-965 in the state of Maharashtra on EPC Mode
Widening to 4 lane of existing road from Km 184.200 to Km 191.100 of NH 214A (NH 216) in Bapatla town in Guntur District as one time improvement proposal in the State of Andhra Pradesh on EPC mode
EXECUTION OF HILL SLOPE STABILISATION MEASURES FOR SINKING ZONE ON ROAD LGG-MUKTO - TELI BETWEEN KM 7.000 TO KM 8.000 UNDER 90 RCC/42 BRTF/PROJECT VARTAK IN THE STATE OF ARUNACHAL PRADESH THROUGH EPC MODE OF EXECUTION
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Engagement of Safety CS during O and M of 6L Access Controlled GFH NH152D starting from Ismailabad(Gangheri) on NH152D to Narnual(0.000 to 227.20 L-227.20Km) for Pkg1 to Pkg8 on EPC mode under BMP in Haryana.
Construction of LVUP/VUP at Km 149.870 Jaisinghpura at Km 155.030 Binaganj Bypass at Km 183.780 Aranya Jod at Km 188.870 Reliance Petrol Pump on Guna Biaora section of NH46 in the state of MP on EPC mode
Development of Memmadpur (Ambala) - Banur (IT City Chowk) - Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode
Development of six- lane access-controlled highway from design chainage 0.000 (Ganespur) to design chainage 8.130 (near Mohand) of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh under Bharatmala pariyojana (Package1) on EPC mode
Permanent Rectification of Blackspot (TN-02-481) by Construction of 4-lane VUP at Km 105.335 (Budhalur Junction) in Thanjavur to Trichy section of NH-67(New NH-83) in the State of Tamil Nadu on EPC mode
Permanent Rectification of Black Spots TN-(05)-050, TN-(05)-191, TN-(02)-091 in Tindivanam to Ulundurpet Section of NH 32, 132, 38 (Old NH-45) in the State of Tamil Nadu on EPC Mode - 2nd Call
Consultancy Services for Authority Engineer for Road Safety Improvement of Critical Junctions and Overlay on Muzaffarnagar Haridwar Section of NH-334 from Km 130.360 to Km 208.600 in the State of Uttar Pradesh and Uttarakhand on EPC Mode
Up-gradation to 4-Lane with Paved Shoulder configuration of the highway starting from km 88.400 (Savali Vihir) to km 163.400 (Ahmednagar bypass) (Design Length-75.000 km) section of NH-160 in Maharashtra under BMP on EPC Mode
Construction of 6 lane Light Vehicular Underpass (LVUP) (1x12x4.0m) at Km.59.825(Wangapally Motakonduru Cross Road) along with Approaches and Service Roads on Yadgiri to Warangal section of NH 163 in the state of Telangana on EPC mode
Consultancy Services for Authority Engineer for Supervision of Four Laning of Hospet Bellary section AP Boarder from Km 280.080 to Km 375.450 design length 95.370 NH67 in the state of Karnataka under NHDP PhaseIV B on EPC mode
Develop to 4Laning of the descoped stretches from Km.115.342 to Km. 191.700 of NH34 in Nadia(3.962 Km.)Murshidabad (5.538) pertaining to Krishnagar Behrampore sec of NH34(New NH-12) Sec in West Bengal on EPC mode.
CS for AE for Const. of 4L Nagpur-Katol sec of NH353J include. Mitigation Structures from Design Ch.37.000 to Ch.45.990 TC-I and from Design Ch. 50.400 to Ch63.100 TC-II in Maharashtra on EPC Mode
CS for AE for supervision of design and construction of Elevated structure (flyover) from Indora Chowk to Dighori Chowk (Design Length 8.90 km) in Nagpur city on Nagpur-Umred section of NH-353D in Maharashtra on EPC mode
Rehabilitation and Upgradation of Hoshiarpur to Una up to PB HP border section of NH503A to 2lane paved shoulder configuration including 4lane Hoshiarpur Bypass(from Design Ch2.425 to Design Ch30.348) in Punjab(PckgIV) on EPC mode under NH
Construction of leftout portion of Agra Inner Ring Road connecting village Deori (Design CH.0.00) to NH44 (old NH03) village Bad (Design CH. 7.772) in the district of Agra in the state of Uttar Pradesh on EPC mode.
Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH44 to Gobindsar village on Delhi Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in Punjab on EPC Mode under NH(O)
Four laning with paved shoulder of Madhavpur to Porbandar section of NH-8E (Ext.) old/NH-51(new) from km 338.400 (Design Chainage km 338.400) to km 379.100 (Design Chainage km 379.100) in Gujarat through on EPC mode
Consultancy Services for AE for Supervision of 4-Laning of Mohari to Satai Ghat section NH-934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package-2) in the State of Madhya Pradesh on EPC Mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana-Shamli-Muzaffarnagar Miranpur Bijnor at Kotawali to two-four lane in the State of UP on EPC Mode Pkg-IV (Bijnor to Kotawali NH-709AD)
AE For Supervision of 4-Lane divided carriageway from Vadipatti (Design Ch. 0.000) to Chittampatti (Design Ch. 29.960) Stretch of Madurai Ring Road Section of NH-744A on EPC mode under Bharatmala Pariyojana Phase-I in Tamil Nadu
Construction of 6 Lane Bridge across Palguni River at km 368.849 of length 182.50m and improvement works from Design Ch. km 368.356 to Design Ch. km 369.132 on NH 66 on EPC mode in the state of Karnataka
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF Construction of Emergency Landing Facility on NH on Balasore Kharagpur section from km.83.400 to km.88.400 total 5 km. of NH60 New NH16 in West Bengal on EPC mode
Design and Construction using Thin White Topping (TWT) including routine maintenance and balance works of Khed-Sinnar section from km.42.000 to km.177.000 on NH-60 in the state of Maharashtra as Standalone project on EPC Mode.
Balance work of Upgrad to 4 Lane with Paved Shoulder config of the highway starting from km 88.400 (Savali Vihir) to Km 163.400 (Start of Ahmednagar Bypass)(L75.000km) sec of NH160 in Maharashtra under BMP on EPC Mode.
Construction of Balance Work for Widening to 2 lane with paved shoulder from Km 80.700 to Km 93.400 length 12.700 Km of NH 76 (Deori Harpalpur section) on EPC Mode in the State of Madhya Pradesh(3rd Call)
Realignment and curve improvement near Deulgaon Mahi town from design chainage Km. 105.300 to Km. 106.185 (length- 0.885 Km) near on NH 753A to Four lane with paved Shoulder configuration in the state of Maharashtra on EPC mode
Realignment from Km 227.770 to 227.970, Km 233.260 to 233.980 Km, Km 234.090 to 234.860 Km, Km 235.980 to 236.770 Km of NH-26 (Missing section of Bhawanipatna- koksara Stretch) on EPC mode in the state of Odisha
Rehabilitation and Upgradation of Aurangabad Sillod Ajanta Jalgaon, NH-753F from Km. 87/700 to Km. 89/800 Km.144/750 Km.147/380 (Design Chainage) to Four lane configuration In the state of Maharashtra On EPC Mode.
Construction of Bypass Road to Adoni town Connecting NH-167 (Hagari-Jadcherla Road) from Km. 62/700 to 71/400 in Kurnool District in State of Andhra Pradesh, on EPC Mode under Annual Plan 2022-23(2nd call)
Rehabilitation and upgradation to 2 lane with paved shoulders from Design Ch. Km 248/010 to 269/900 i.e., Kurnool/Kadapa border Jammalamadugu. Section of NH167K in the state of Andhra Pradesh on EPC mode under Annual Plan
Design and Construction of Bridge, Approach Road and Protection work over River Gomti at Prempur Ghat between village Prempur under Block Pisawa and Village Saraiya under Block Hariyanwa in Assembly Constituency Maholi of District Sitapur on EPC Mode
EOI for association as JV Partner from Experienced Agencies for Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village Dhaka More from Km 0 to KM 36.6 Total length 36.600 Km of NH133E on EPC mode