Loading…
Loading…
25,701 results • Best match
Major Upgradation of Lucknow Railway Station of Northern and North Eastern Railways on Engineering Procurement And Construction mode
Development of Mahi Upvan (Public Garden) Near Mahi Dam downstream, Banswara under EPC Single Responsibility Turnkey basis
Construction of 300 bedded Hospital ( 3 Lower plus Ground floor plus 7 floor ) and Teaching Block (G plus 9 floor) in Dr. Y.S. Parmar Medical College at Nahan, Distt.- Sirmaur (HP) including Internal & External Civil, Electrical & Mechanical ... on Engineering , ... Engineering, Procurement and Construction (EPC) ... ( EPC ) ...
Widening to Four Lane Divided Carriageway from Km 278.00 to Km 286.40 in Sagar Town limits on Tumkur-Honnavara Section of NH-206 (new NH-69) in the state of Karnataka on EPC mode Job No NH-206-KNT-2020-21-921
Strengthening work from km 25 to km 32 and Construction of Damaged Retaining wall, Breast Walls in km 25 to km 40 on NH-123(New NH-507) on EPC mode under Annual Plan 2022-23 in the State of Uttarakhand
Development of 6lane GF Ring Road(PckgIII) starts from 51.200 to 68.650(Length 17.450kms) around Kanpur City and Construction of 4lane Airport link road(Length 1.45 km) at 62.090 of Kanpur ring road in UP on EPC mode
Treatment of Land Slide and Sinking Zone from Chainage 55.400 to 55.580 km. near kwarab Bridge, NH-109 Jyolikot Khairna Almora Karnaprayag Road Under EPC Mode (as per DPR submitted by THDC Uttarakhand in Annual Plan 2024-25
Rehabilitation Upgradation of existing highway to Two Lane Four Lane of Karad Tasgaon (From KM 0/000 to Km 58/830) Section of NH-266 on EPC mode in the State of Maharashtra. Reg. Repairing of Approach Road
Construction of ROB on Dhawari - Therban - Somthana -Kini - Palaj Road MDR - 20 CH 41/0 (LC No 4) Km 40/485 to 45/100, in the State of Maharashtra on EPC mode., Tq. Bhokar, Dist.Nanded (Length 3.6 Km.)
Authoritys Engineer for Supervision of Rehabilitation and Up- gradation for Talere Gaganbawda Kolhapur Road (NH-166G) stretches start from Start of Karul Ghat to End of Gaganbawda of NH-166G in the State of Maharashtra on EPC Mode.
Work of development and construction of elevated corridor from km 38.660 to km 42.690 (from Iscon Junction to Start point of approach of Sanand Flyover) of NH-147 in the State Of Gujarat (Length - 4.030 km) EPC mode
Design and Construction of Main Bridge Railway Portion of Rail Overbridge on LC No. 8 Special 2T at Railway KM 17.372 on Laxman Bihar Para Road near Jalalpur Gate located at Rajajipuram in DistrictLucknow U.P. on EPC MODE
Consultancy services for AE for supervision of Rehabilitation and upgradation from of Kolde to Visarwadi (Near Junction with NH-6) section of NH752G (total length -4.40) to 2LPS/ four lanes in the State of Maharashtra on EPC mode.
Reconstruction of Distressed Minor Bridge over River Bania Jhora, Major Bridge over River Bhandari 2 and Bhandari 3 at Km 191.25, Km 195.866 and Km 198.161 respectively in the district of Alipurduar in EPC mode, Job No.573.
Construction of bypass for providing inter-connectivity amongst National Highways (NHs) around the Pratapgarh city (Pratapgarh Bypass)on EPC mode in the state of Uttar Pradesh (Job No. Pratapgarh Bypass-UP-2021-22-593 Dt. 12-04-2021
Stage strengthening from km.928/00 to 938/00 (Total length - 10.00km) of NH-17 (new)/NH-31 (old) under Abhayapuri Construction Division ,Abhayapuri for the Annual Plan 2019-20 in the State of Assam under EPC mode.
One Time Improvement from Km 101.000 to Km 106.600, Km 107.600 to Km 111.600 and from Km 112.600 to Km 124.600 of Madanapalli Naidupeta road NH71 in the state of Andhra Pradesh under NH(O) on EPC Mode
Planning, Design, Supply, Installation, Testing, Commissioning and Operation and Maintenance for 3 Years including three years free maintenance of on-farm Micro irrigation System EPC mode under Hybrid Annuity based Model HAM at 5945 L New Siwana Ma
Construction of Access Controlled Pune Ring Road East in the State of Maharashtra on EPC Mode Package PRR E7 from Km 97 900 Garade, Taluka Purandar to Km.104 140 Shiware, Taluka Bhor, District Pune Length-6.240 Km
Consultancy Services For Authority Engineer For Supervision of Widening and Strengthening from Km. 0.000 to Km. 35.000 (Mohan Ganj to Autarpur) of NH-731A to two lane paved shoulder in the State of Uttar Pradesh on EPC mode.
Supervision Consultancy Services SC for Supervision of Operation and Maintenance including Supervision of Completion of Balance work of Timmapuram to Losari Section 5 Packages of NH216 Total length 147 Km 2L PS on EPC Mode in Andhra Pradesh
Consultancy Services for Construction (On EPC Mode) of 700 bedded ......... Geeta Colony, New Delhi (SH Hiring of Inspection Vehicle along with Driver in the office of Assistant Engineer HPSD (East)-IV, PWD, Tahirpur, Delhi-110093 during 2020-21)
Consultancy Services for AE for Supervision of Rehabilitation and widening work for 2Lane with PS of Existing National Highway 122B Alignmentfrom Km 29.730 to Km 72.348 of Mahnar Bachhwara section in the State of Bihar on EPC Mode
Strengthening of road from km 15/8 to 19 and 55/6 to 66 Total 16 KM NH 43 Extn Gulganj Amanganj Pawai Katni Road on EPC mode Under NH Division Sagar in the state of Madhya Pradesh
One time improvement of existing road from Km 0.0 to 2.360 Km 26.930 to 30.0 and Km 30.270 to 30.6 of NH 365A (left over bits) of Kodad Khammam Section in the State of Telangana on EPC mode
PMC work for Construction of New District Jail at Lalitpur for capacity of 2000 prisoners (With capacity of 200 Prisoners of High Security Barrack) and New District Jail at Lalitpur for Capacity of 1000 Prisoners On EPC Mode
Consultancy Services for Implementation of RAP for Rehabilitation and Upgradation of Bowdara-Vizianagaram and Paderu-Araku Section of NH-516E in the State of Andhra Pradesh under GNHCP with the loan assistance of World Bank on EPC mode
Engagement of user fee agency through e-quotation for Bhagat Talai Fee Plaza 13.700Km and Balicha Fee Plaza74.00Km for the use of Upgradation to 2 lane with Paved Shoulder from Charbhuja at to Neechli Oden (Nathdwara) EPC Mode
Engagement of user fee agency through EQ at Gopalpur FP at Design km 477.450 for use of Allahabad Mirzapur from Design Km450.150 to Km486.970 of NH76(E)(New NH35)on EPC mode in the state of Uttar Pradesh
Engagement of user fee agency through E-Tender at Chhoti Villor Fee Plaza at km 8.400 for Sanchore-Dhnera-Deesa section from Km.0.000 to km.33.600 of NH-168A in the state of Rajasthan on EPC mode
Rehabilitation and Upgradation of Bowdara-Vizianagaram (km 0.000 to km 26.937) and Paderu- Araku (km 2.400 to km 51.772) Section of NH-516E in Andhra Pradesh under (GNHCP) with the loan assistance of World Bank on EPC mode
PMC for a Ropeway project viz-Const of Ropeway System over the river Brahmaputra connecting BiswanathGhat and Umatumoni Island of Biswanath District, Assam on EPC mode, including Defect Liability cum Comprehensive O and M period for 3 yrs
Consultancy work for preparation of detailed project report with necessary sub soil investigation, design and drawing etc. for construction of High Level Bridge on Anas River at Bhuwadara (Gangaratalai Banswara) on EPC Mode (Approx. cost of Project i
Construction up gradation of existing road to 2 lane with hard shoulder from existing Chainage Km 0 to Km 50 of NH 07 old NH 58 Mana to Mana pass on EPC mode in the State of Uttarakhand
Construction of 2-lane with paved shoulder configuration of Biaora Bypass of Length 5.690 Km, From Km 0.000 to 5.690, Total design length 5.690 Km section of NH-752B in the State of Madhya Pradesh under EPC mode
Design and Construction of 02 lane ROB at LC 32-C of Budhwal-Sitapur Rail Section of North Eastern Railway on Lucknow-Kursi-Mahmudabad Road SH 172 in Mahmudabad Assembly Constituency of District Sitapur, U.P. on EPC Mode
Strengthening of Dawki- Amlarem- Jowai (NH 40E) (New NH 206) from Km 162/100 to Km 177/000 in the State of Meghalaya on EPC mode for the year 2021-2022 . Job No. 40E-MG-2021-22-168
Consultancy Service for proof checking, assisting supervision of work, Quality Control of Upgradation and strengthening to 2 lane_PS from km. 95.500 to 129.775 of NH168G Idar-Bhiloda-Samlaji in the state of Gujarat under EPC mode (Length 34.275Km)
Restoration of rain damages on Jia Manikaran road Km. 1/610 to 35/110 SH Construction of 40.50 mtrs. span double lane Arch bridge over river Beas at Bhunter Job No.CRF-HP-2023-24/188 on EPC Mode.
Stage Strengthening from Km. 20/000 to Km. 48/600 (L-28.600 km) with bituminous concrete of Rangia-Daranga Road (NH-127D) under Rangia NH Division in the State of Assam under EPC mode under AP 2019-20.
Consultancy services for Authoritys Engineer for Supervision of Construction of 4 lane Gauripur Bypass Starting from Km 852.56 of NH-31 (Dumardoha Pt-II) and Terminating at Km 862.17 (Baladmara) in the State of Assam under EPC mode.
Consultancy services for authority engineer for supervision of upgradation of package 1 rajpuri khurd village to padih village section and Package 3 badki mahri village to ramanujganj section NH 343 2L PS with flexible pavement on epc mode
Strengthening of road from km 9 to 43 Total 35 KM NH 86 (New NH 934) Sagar Chhatarpur Road in the State of Madhya Pradesh on EPC mode Under NH Division Sagar in the state of Madhya Pradesh
Construction of 2-lane with paved shoulder configuration of Khilchipur Bypass of Length 5.500 Km From Km 0.000 to 5.500 Total design length 5.500 Km section of NH-752B in the State of Madhya Pradesh under EPC Mode
Construction of Kaithi Padaria Kala bypass,Patna Tamoli bypass,Jaso bypass and Nagod bypass total length 15.44 Km to 2 lane with paved shoulders flexible pavement on NH 943 in the State of Madhya Pradesh on EPC Mode
Consultancy Services for DPR Preparation on EPC mode for Construction of High Level Bridge over Damodar River beside existing Birsa Bridge at Km 39.700 of NH 218 in the State of Jharkhand including Land Acquisition and Utility Shifting
Reconstruction of Existing Major Bridge including Bridge approach from km 171.246 to km 171.774 on Ranchi-Rargaon-Mahulia Section from Km 114.000 to Km 277.500 of NH-33 in the State of Jharkhand on EPC Mode 3rd call
Rehabilitation and Upgradation to intermediate lane configuration of Shri Kyari-Gumma Section (km 75.000 to km 94.900) of NH-707 in the State of Himachal Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
DESIGN AND CONSTRUCTION OF PMT PSC BOX GIRDER BRIDGE AT KM 11.200 SHANIYAL 120 M SPAN ALONG WITH ITS APPROACHES SSI, PROOF CHECKING FROM IIT ON DAYALACHAK RAMKOT RD UNDER PROJECT SAMPARK IN JK (UT) THROUGH EPC MODE
Consultancy services for Authoritys Engineer for Supervision of ( CONSTRUCTION OF 4-LANE MANGALDOI BYPASS FROM KM 26.400 to km 41.500 ON NH 15 ( L- 15.10 km) UNDER RANGIA NH DIVISION IN THE STATE OF ASSAM under EPC mode)