Loading…
Loading…
1,318 results • Best match
Reconstruction of 4 lane Tallah ROB (Hemanta Setu) Adjacent TO Tallah Railway Station On Barrack pore Trunk Road, Kolkata, West Bengal
BTL Make Equalising Gear in Set, Part No. G-06-75-90, BTL Make 3 Stage, Gear Box Complete, Part No. 110-1, BTL Make 3 Stage, Helical Gear Box Complete, Part No. 150-1, BTL Make Complete Loop take up Drum Dia. 800 mm, Part No. G-15-12R, BTL Make Complete Tail Drum Dia. 800 mm, Part No. G-11-12R, BTL Make Complete Loop Drum 800 x 1600 mm, Shaft dia. 160 mm Part No. G-15-300R, BTL Make Complete Pressure Drum 400 x 1600 mm, Shaft dia. 160 mm Part No. G-53-300R
Planning Design and Construction of 4 storied Critical Care Block (100 Bedded) with a foundation provision of 8 storied building for future extension at Jalpaiguri Government Medical College and Hospital in the State of West Bengal on Turnkey Basis
Supply, Installation and Commissioning of 148 Nos Solar High Mast with 9 m Pole 4X 50 W LED Luminaries 4X200 Wp PV Module at various location of West Bengal on turnkey basis at including five (5) years Comprehensive Maintenance.
Establishment of Eggshell membrane to collagen cum egg powder plant at Kalyani, Nadia, West Bengal on Turnkey Basis under West Bengal Livestock Development Corporation Limited, LB-2, Sector-III, Salt Lake City, Kolkata-700106 during the F.Y. 2024-25
Set of dowel pins as per Specification IS 2507, Hardness 38 to 43 HRC , set consists of 4 items as given below 1. Dowel pin of size 2.5 x 20 mm for EPC - 01 No/set, 2. Dowel pin of size 3 x 25mm for
Conversion and Renovation of WTA on Turnkey basis i.e by necessary supply of materials,Motor Cover, Internal wiring with Kiosk box at Thakurbari Major RLI scheme under Hemtabad Block under Raiganj (A-M) Division under Core Sector23-24 Programme
Supply and Delivery of Cath Lab on Turnkey Basis as per SOQR Item No 1, Testing of Cath Lab on Turnkey Basis as per SOQR Item No 2, Installation and Commissioning of Cath Lab on Turnkey Basis as per SOQR Item No 3, Supply and Delivery of Endoscopic ... on Turnkey Basis ... on Turnkey Basis ... on Turnkey Basis ...
Special Renovation of Water Transmission Arrangement (WTA) of PBC CHAIN 110 Govt Owned and Operated Major RLI Scheme at Kanksa Block on TURNKEY basis under Durgapur (Agri Elec) Sub Division under Burdwan (Agri Mech) Division under Core Sector 2023 24
Special Renovation of Water Transmission Arrangement (WTA) of PBC CHAIN 268 Govt Owned and Operated Major RLI Scheme at Kanksa Block on TURNKEY basis under Durgapur (Agri Elec) Sub Division under Burdwan (Agri Mech) Division under Core Sector 2023 24
Life enhancement of entire ESP structure and structures in between Mill Building ESP including all structures near Chimney ID fan area along with balance cable rack structures in front of ESP control room all in connection with UNIT5 on TURNKEY
Planning, Design and Construction of 3 storied Critical Care Block (50 Bedded) with a foundation provision of 10 storied building for future extension at Tamralipta Government Medical College and Hospital in the State of WB on Turnkey Basis(2nd Call)
Special Renovation of Water Transmission Arrangement(WTA) of Satpota-II Govt. Owned and Operated Major RLI Scheme at Satpota Mouza under Purbasthali-II Block on TURNKEY Basis Under Patuli (AM) Sub Divn under Burdwan (AM) Division Core Sector 2024-25
Planning Design and Construction of 3 storied Critical Care Block (50 Bedded) with a foundation provision of 10 storied building for future extension at Deben Mahata Government Medical College and Hospital in the State of West Bengal on Turnkey Basis
Firewall, Type- 1 Server, Type-2 Server, Layer-3 Switch, KVM Switch, Server Rack
Conversion and Modernization of WTA on Turnkey basis i. by necessary supply of materials,Motor Cover andInternal wiring with Kiosk box at Lohagara Major RLI scheme under Goalpokher-II Block under Raiganj (A-M) Division under Core Sector 23-24
Conversion and Modernization of of WTA on Turnkey basis i. by necessary supply of materials,Motor Cover and Internal wiring with Kiosk box at Titiha Major RLI scheme under Itahar Block under Raiganj (A-M) Division under Core Sector 2023-24
Extension Using UPVC Pipe from Existing RCC Pipeline of Sindhia-II Major RLI Scheme on Turn Key Basis at Mouza Mobarakpur, Block-Old Malda in the District of Malda under the EE (A-M), Malda-II (A-M) Div under SARASARI MUKHYOMANTRI (Core-Sector)25-26
CONSTRUCTION OF TWO NOS. 132/33 KV TRANSFORMER BAY FOR 50 MVA, 132/33 KV TRANSFORMER WITH INSTALLATION OF ONE NO 33 KV BUS SECTION CIRCUIT BREAKER AND TWO NOS. 33 KV EARTHING TRANSFORMER AT BAMUNARA 132/33 KV SUB STATION AND ALLIED WORK ON TURN KEY
CONSTRUCTION OF I) 03 NOS. 33KV FDR BAY AT BONGAON,II) 01 NO. 33KV FDR BAY AT ASHOKENAGAR,III) 01 NO. 33KV FDR BAY AT BARASAT AND IV) 01 NO. 33KV FDR BAY AT MOHISPOTA 132 KV SUB STATION AND ALLIED WORK ON TURN KEY BASIS.
Renovation of Chaknagar-IV Owned and Operated Major RLI Scheme on Turn-Key Basis including Procurement of Materials and Laying of WTA at Block-Gazole in the District of Malda under the Exe Engg (AM), Malda-I (A-M) Divn under Core-Sector 2025-26 prog.
Repair of Cracks in Rigid Pavement and BC work in Flexible Pavement including Immediate rectification of misc works on Kharagpur to Chichra section of NH-49 from Km 129.600 to Km 185.150 at the Risk and Cost of the EPC Contractor in the state of WB
MFFS (QBSS) TURNKEY WITH ACCESSORIES FOR GRSE YARD 3025-3028
PIN OF ROTOR 708-2H-23360 (Q3), SPRING OF ROTOR 708- 2H-33150 (Q3), PC-EPC SOLONOID/PILOT VALVE 702-21- 57500 (Q3), LS-EPC SOLONOID/PILOT VALVE 702-21- 57600 (Q3)
Design, supply, erection, testing, commissioning of 2 nos each capacity of 11 TR microprocessor based ductable split air conditioning system (capacity- 11 TR x 2 Nos) and 6 nos 2 TR inverter 5 star rating split air conditioner system on turnkey bas
Augmentation of WSS by renovating of 14 MGD existing WTP at Angadpur, including Piyala Boosting station, Dgp and Construction of OHR 900 cum under 15 MGD WTP with 5 years OM of the Plant on turnkey basis under AMRUT 2 within DMC
Renovation of Budhia-I state Owned Maj. RLI Scheme on Turn-Key Basis including Procu. of Materials and Laying of WTA at Mouza-Jote Basanta, Block-English Bazar in the Dist of Malda under the Exe Engg (A-M),Malda-I (A-M) Divn.(CoreSector 2025-26 prog)
E- TENDER FOR PURCHASE AND INSTALLATION OF HOSPITAL EQUIPMENTS /INSTRUMENTS BY THE PRINCIPAL, MEDICAL COLLEGE, KOLKATA
Design, manufacture and supply of Machine Room / Machine Room Less (MRL) Passenger Lift ( G + 4 ), 5 Stops, 5 Openings, 8 Passenger capacity ( 544 Kgs ) in connection with the work for "Electrical General work in connection with "Construction of ... cum EPC Building ...
Design, manufacture and supply of Machine Room / Machine Room Less (MRL) Passenger Lift ( G + 4 ), 5 Stops, 5 Openings, 8 Passenger capacity ( 544 Kgs ) in connection with the work for "Electrical General work in connection with "Construction of ... cum EPC Building ...
Design, manufacture and supply of Machine Room / Machine Room Less (MRL) Passenger Lift ( G + 4 ), 5 Stops, 5 Openings, 8 Passenger capacity ( 544 Kgs ) in connection with the work for "Electrical General work in connection with "Construction of ... cum EPC Building ...
Design, Drawing Construction and Commissioning.....within Naihati Municipality on Turnkey basis
ORGANIZING COMPREHENSIVE CONSUMER AWARENESS CAMPAIGNS THROUGH VARIOUS MEANS ON TURNKEY BASIS
Renovation of WTA of SITAHATI I Govt Owned and Operated Major RLI Scheme in Ketugram II Block under Katwa AM Sub Division under Burdwan AM Division under Paray Samadhan under Core Sector Programme in the district of Purba Bardhaman. UID No PBDPS05001
CONST. OF (I)2 NOS. 33KV FDR BAY AT SERAKOL 132KV (II) 1 NO. 33KV FDR BAY LAXMIKANTAPUR 220KV WITH EXTN. OF TRANSFER BUS (III) 01 NO. 33KV FDR BAY KAKDWIP 132KV AND (IV) 03 NOS. 33KV FDR BAY FALTA 132 KV SUB-STN. AND ALLIED WORK ON TURN KEY BASIS
Shifting of Utilities water pipe lin possessed by ADDA for the work Construction of 4 lane Raniganj Bypass of length 5.261 km on NH 60 New NH-14 from km 275.20 of NH 60 to km 418.18 of NH-2 New NH-19 in Paschim Bardhaman, West Bengal in EPC,,,,,,,,,
Request for Proposal (RFP) for Turnkey Solution on Digital Braille Embossing Application.
CONST OF (I) 03 NOS. 33KV FDR AT NJP 220 KV (II) 01 NO. 33/11KV, 6.3MVA TRANSFORMER BAY AT NJP 220 KV (III) 02 NOS. 33KV FDR BAY AT DARJEELING 132 KV AND (IV) 03 NOS. 33KV FDR BAY AT NBU 132 KV SUB STATION AND ALLIED WORK ON TURN KEY BASIS
Turnkey basis works of Energisation at Sukdevpur-II Major RLI Scheme in Tapan Block
Detail design, drawing, Construction, Installation, Commissioning.....HMC area on Turnkey basis under AMRUT 2.0
Undertake Machinery and Piping jobs on turnkey basis on vessel MV Kalighat at CKSRU Kolkata
UPGRADATION WORK ON TURNKEY BASIS AT TIMBER POND AREA INCLUDING O .M AT SHALIMAR, HOWRAH
Detailed Design, Drawing, Construction and Commissioning of R.C.C Elevated Service Reservoir No 4 with allied works within Baranagar Municipal area on turnkey basis at Ward No 25 having capacity 1093 m3, Staging Height 20 m. on turnkey Basis.
Design, Drawing Construction and Commissioning of RCC Intze........Halisahar Municipality on Turnkey basis under AMRUT 2.0
Design, Drawing Construction and Commissioning of RCC Intze......Halisahar Municipality on Turnkey basis under AMRUT 2.0
Design, Drawing Construction and Commissioning of RCC Intze.....Halisahar Municipality on Turnkey basis under AMRUT 2.0
Design, Drawing Construction and Commissioning of RCC Intze.....Halisahar Municipality on Turnkey basis under AMRUT 2.0
WTA ON TURNKEY BASIS, CONSTRUCTION OF PUMP HOUSE, INTERNAL WIRING OF PUMP HOUSE AND ENERGISATION ON TURNKEY BASIS AT MADHUBAN MIDI(E) RLI SCHEME UNDER RATUA (A-M) SUB-DIVISION WITHIN MALDA -II (A-M) DIVISION UNDER RIDF-XXVI.
WTA ON TURNKEY BASIS, CONSTRUCTION OF PUMP HOUSE, INTERNAL WIRING OF PUMP HOUSE AND ENERGISATION ON TURNKEY BASIS AT GANDHINAGAR MIDI(E) RLI SCHEME UNDER MALDA-III (A-M) SUB-DIVISION WITHIN MALDA -II (A-M) DIVISION UNDER RIDF-XXVI
TURNKEY SUBCONTRACTING OF MEGA HULL BLOCK ERECTION PART-1 OF MPVS, YD.NO.3050-57 and OTHER PROJECT