Loading…
Loading…
4,631 results • Best match
Front Axle repair both side half shaft lath work and fitting work, Gear box assy repair work clutch plate pressure plate clutch release bearing change, ECM opening and repair with fitting work, rear brake shoe change, spark plug change, front and ... rest welding work , ...
Installation of 1 Nos. Submersible pump within 80 mm dia and 72 m depth PVC pipe ...PVC Storage tank and necessary pipe , fittings over MS Structure stand at Kalikapur Colony Infront of Primary School ward No-22 under Bolpur Municipality.
Construction of 2 units over head water reserver (MS Structure) with submersible pump of Depth 54 meter near Israil Sk house at Sabitrinagar village on Mouza Hizole, JL No 41 and near Anar Bibi Asthanal on Mouza Sashpara, JL No 92
Construction of 2 units over head water reserver (MS Structure) with submersible pump of Depth 54 meter near Nepal Saha house at Mouza Kayemba JL No 79 and Gokarna Bagdipara Kalitala near Gagan Bagdi house at Mouza Gokarna , JL No 19
Emergent work for dismantling RCC roof slab of pump house cum electrical meter room and reconstruction with colour coated Zn A1alloy roof sheeting over MS structure and allied ancillary rehabilitation work of said room at LIG and SCP Tangra Housing
Side covering by brick work and aluminium louvered system and back stage covering by MS Structure with Zn Al alloy sheet and other ancillary works at Open Air Theatre UTTIRNA 1A Reformatory Street Alipore Kolkata 700 027 during the 2025 2026
Transportation, installation, commissioning and trial run including necessary fabrication jobs (including civil works) of one no. 1200mm width, PVC belt conveyor for a length of 500 mtr. along 23D X Dip in RVI seam of MIC, J.P. COLLY.
Design, Fabrication, Deployment, and Commissioning of a Double Layer HDPE Block Floating Barge with Ramp for raw water supply pipeline for installation of minimum 6(Six) Nos. 7.5 HP Submersible Pumps, Waterproofing Close Circuit Cameras with LED lig
Dismantling, transportation, installation, commissioning and trial run including necessary fabrication jobs (including civil works) of one 800mm width, 1x 75KW, 550v, PVC belt conveyor for a length of 60m in 1100 m of new incline (along the incline)
Fabrication, galvanizing,testing,supply and delivery of different 33 KV and 132 KV Substation structures including G.I nuts, bolts and washers matching with the above structures at different Substations of WBSETCL under C.E (OM)-II,(99.560 and 2.825)
Transportation, installation, necessary fabrication, commissioning trial run of one no. 1000mm width, 1X9OkW, 550V, single drive belt conveyor along -11D from 72L to 73L for development of sector-F in R-VIIA seam at 3n4 Incline, J.P. Colly.
Fabrication and Internal Wiring of Twin Hull Barge for Saraighat State own and operated Major RLI, BlockPanskura, Mouza- Saraighat, J.L.- 181, Plot-646, Lat/Long- 22.359854N/ 87.727534 under Tamluk(A-M) Sub-Division under Tamluk(A-M) Division
Supply of 150 mm dia Blank Pipe and 150 mm dia Flange and Fabrication of 150 mm dia Z Bend under Jhargram-I (A-M) Sub-Division in the District of Jhargram under Non-Plan Programme 2024-25.
Supplying, Fabrication, Erection on suitable RCC foundation and Commissioning with 3 (three) months Trial Run (including cost of routine testing of water sample for performance evaluation) of pressure type Iron removal plant as per design norms of th
Fabrication, galvanizing, testing, supply and delivery of different substation structures and matching G.I bolts, nuts and washers i.r.o. Construction of 132 KV 2nd Main Bus along with 132 KV Bus Coupler Bay at NBU 132 KV Substation, WBSETCL
Design erection fabrication testing and commissioning of 1 Ton hydraulic Goods Lift for small can filling shed mezzanine floor and 400-450 KG hydraulic passenger lift and 400-450 KGS counter-weight type passengers Lift for LBP Kolkata
Balance work of construction errection ,fabrication ,installation of MS structural bridge and laying 150 mm dia MS water carrying pipe with making necessary bend and others allied works at Jemua piped W/s Scheme under DWSD ,PHE Dte
Design, engineering, manufacture, fabrication, assembly, testing at works of supply, delivery including complete erection, testing etc of 1 (One) No, 4 Stop, Eight (8) Persons Capacity (544 kg), 1.0 MPS minm speed Lift with Lift License including 12
Transportation, installation, necessary fabrication, commissioning and trial run including extension of one no. 1000mm width, 1x90kW, 550V, single drive belt conveyor along 5D from 80L to 91L after dismantling of 79L. belt at R-VIIA seam, 3N4 Incline
Transportation, installation, necessary fabrication, commissioning and trial run including extension of one no. 1000mm width, 1x90kW, 550V, single drive belt conveyor along 17D from 78L to 80L including two pillar extension upto 17D/82L in R-VII seam
Extension of 1400mm 3rd belt thrice for 70 mtr and 45 mtr length twice , Dismantling Transportation, Installation, Commissioning Trial run including necessary fabrication jobs Extension of 1400mm 3rd belt thrice for 70 mtr and 45 mtr length twice ,
Transportation, Installation, Fabrication, Commissioning n Trial run including Civil works of one 1000mm width, 1x90kW, 550V, Single Drive Belt Conveyor from 72L/15XD to 72L/17XD A and nine times extension in RVIIA seam of 3n4 Incline,JPC
Supplying, Fabrication, Erection on suitable RCC foundation and Commissioning including 3 (three) months Trial Run and 5 (five) years O M (including cost of routine testing of water sample for performance evaluation) of Pressure Type Iron Removal Pla
Assisting in the round the clock shift duty, in the fabrication and maintenance of power supply units, in the experiment in Physics Laboratory, in the maintenance of Fire Alarm System, EPABX IPPBX System at VECC and its campuses.
Fabrication of one numbers of complete Drive Head with loop structure for installation of 1200mm Belt Conveyors for evacuation of coal from LW-13 panel in R-VI Seam located at 5D/13L at MIC, under Jhanjra Area.
Transportation, installation, necessary fabrication, commissioning and trial run including extension of one no. 1000mm width, 1x90kW, 550V, single drive belt conveyor along 74L from 5R to 11R after dismantling of 5D belt for development of Panel-10 i
Supply and Fitting of Misc Items for different installation of electrical and mechanical PandM machineries at Madhaipur and Laskarbandh Colliery, FABRICATION, SUPPLY and FITING OF NEW PISTON HEAD and PISTON RING FOR WINDING ENGINE at SOUTH SAMLA COLL
Transportation, Installation, Fabrication, Commissioning n trail run including civil works and extension of 1000mm width, 1x90kW, 550V single drive belt conveyor along -8D from 76L to 83L at Sector F in RVII seam at 3n4 Incline, J.P. Colly.
Fabrication of one number of complete drive head with loop structure for installation of 1200 mm belt conveyor for evacuation of coal from panel-5 at CM2 section in R-V seam located in MIC, under Jhanjra Area
Fabrication, galvanizing, testing, supply and delivery of different 132 KV Substation structures including G.I nuts, bolts and washers matching with the second main bus at Behala 132 KV Sub-station under Behala Area Office, WBSETCL under A.C.E, KTZ
Supply, designing, fabrication, fitting, fixing of Iron 2 Inch. Hollow section pipe display stand. Display Stand make with 2 Inch Squire 18 SWG 6.5 Ft. height 02 Nos. Legs and top side 4 Ft. X 3 Ft. d
Fabrication and supply of 1 in 8.5 Diamond Crossing with Double Slips [Curved Switch] BG for 60 Kg. Rails [UIC] on PSC sleepers layout complete with CMS Acute X-ings to RDSO Drg. No. T-4967/latest alt
Manufacturing fabrication and supplying of assembly for Improved Switch Expansion Joint to RDSO Drg. No. T-6902 (Alt-5) conforming to IRS-T-10-2023 for long welded Rail with 80 mm max. Gap B.G 60 Kg U
Manufacturing fabrication and supplying of assembly for Improved Switch Expansion Joint to RDSO Drg. No. T-6922 (Alt-4) conforming to IRS-T-10-2023 for long welded Rail with 65 mm max. Gap B.G 60 Kg U
Fabrication and Supply of 10125 mm Thick Web Switches as per RDSO Drg. No T-6155 Alt. 13 (with latest alterations) with Zu-1- 60/60E1A1Grade 880 Class A prime quality Tongue rails and UIC 60 Kg Grade
Supply, design, fabrication of LT outdoor panel board having 63 Amp, 4 Pole MCCB, 16 KA as incoming and 8 Nos 32 A MCB DP, 10 KA as outgoing complete with copper bus bar and other allied accessories.
Fabrication and Supply of 6400 mm Over-Riding Derailing Switches 60 Kg 1 in 8.5 on PSC Sleepers as per RDSO Drawing No. T-6068 with Alteration 4 and conforming to IRS Specification No. T-10- 2025, (co
[Goods, Fabrication and supply of 6400 mm overriding Derailing Switches (LH/RH) for 1 in 8.5, BG 60 Kg rail for fan shaped layouts on PSC sleepers to RDSO Drg. No. T-6068 Alt. 4 and IRS specifications
3130-60-10-005-E, 3130-66-20-301-E, 3130-66-20-302-E, 3130-66-20-304-E, 3130-66-20-052-E, 3130.66.21.003-E, 3130-66-20-203-E, 3130-66-20-204-E, 3160-66-10-010- D1-E, 3130-66-23-001-E, 3160.66.10.037.20-E, 3160-66- 10-038-20-E, 3160-66-00-009-1-E
3130.12.10.056-E, 3130.12.10.064-E, 3160-12-10-012-E, 3130.12.10.104.1-E, 3130.12.10.105.1-E, 3130-12-30-301- E, L22420-140BCL-E, 3130.12.00.006.1-E, 3130.12.00.010-E, 3130.12.00.018-E, 3130.12.10.058-E, 3130.12.10.059.2-E, 3130.12.20.054-E, 3130.12.20.202-E, 3130.12.30.067-E, 3160.12.10.008-E, 3160-12-10-010-E, 3160-14-10-145-E, 3160-14-10-149-E, 3160-14-50-003-E, 3130.12.10.954-E, 3160.14.10.143-E, 3130.12.20.106-E, 3160.12.10.003-E, 3160.12.10.807-E, 3160.14.10.118.1-E
Electrode Holder as per IS 2641 (Q3), Welding Cable (V2) as per IS 9857 (Q2), Welding Helmet as per IS 5983 (Q3), Gas Cutting Nozzles (Q3)
Painting of steel tubular pole including repairing of damage pole through welding and supply and erection of new pole with changing of faulty cable at DMC toll tax (near Iskon Mandir) to Parulia end (near Nachan Bus stand) within ward-01 under DMC
complete repairing and rewinding of (A) 400 Amps ESSAB make welding machine (B)complete repairing and rewinding of Bharat Bijlee make 15KW 20HP, 550V 2900 RPM Auxiliary fan motor (C) ABC Make 2.5 KVA/110 Drill panel at 3n4 pit of Shankarpur Colliery
Supplyof 6in dia M.S. Flange Table -D with fittings by welding 6in dia M.S. pipeand 6in dia M.S. bend making as per proper size for diversion of pipe line and new delivery range installation (approx -1286 mtrs.) for domestic purpose, raw water sup
Dismantling two nos. pump with motor set dismantling and shifting with reinstallation of 02 nos. pump motor set with extension by 8inch dia MS pipe with 8inch dia flange welding with fixing to 8inch dia delivery side pipeline and repairing of pontoon
Transportation of 800 m 3 inch MS pipe from Area Store to 3n4 Incline Unit, transportation,fitting of the same from surface to subpanel-1A after welding the flanges and handling HT 6.6KV armored cable for depillaring subpanel-1A in 3n4 Incline Unit
Procurement of FLUX CORED MIG/MAG WELDING FILLER WIRE WITH SHIELDED GAS, CLASS-I AS PER SPECIFICATION NO. IRS : M-46/2020 AND STR : RDSO MC STR W 02 REV-03, GRADE AS PER AWS-A5.20/A5.20M-2005 (R2015), SIZE-1.2 MM DIA.
Push / Pull rod (Traction Bar) for WAP-7/WAG-9 to CLW Drg. No. 1209-01.113-006, Alt-5 or latest consists of : 1. Flange should be as per CLW Drg. No. 1209-01.113-007, Alt-7 or latest. 2. Tube welding
SOLID MIG/MAG WELDING FILLER WIRE, CLASS VI SIZE 1.2 MM (SPEC.NO.IRS M-46/13 WITH AMENDMENT NO.1 GRADE ER 308 L AS PER AWS:A5.9-10)IN SPOOL OF 12.5 KGS/ROLL as per Specn. (SPEC.NO.IRS M-46/13 WITH AME
Push / Pull rod (Traction Bar) for WAP-7/WAG-9 to CLW Drg. No. 1209-01.113-006, Alt-6 or latest consists of : 1. Flange should be as per CLW Drg. No. 1209-01.113-007, Alt-7 or latest. 2. Tube welding