Loading…
Loading…
2,216 results • Best match
Removing, replacing damaged wooden wall paneling with vitrified tiles at stair case of Admin Block main entrance lobby at NIT-Trichy
PROVIDING PVC TANK AND COVER REPAIRS TO STAIR CASE PLINTH PROTECTION FLOOR TILES WALL TILES IN TOILETS PLUMBING SANITARY FITTINGS AND ROOF REPAIRS TO INTERNAL WATER SUPPLY LINES CLEANING OF WATER TANK AND SHEETING FALSE CEILING WALL PANELLING
Providing and laying vitrified floor tiles and other minor
AR & MO AND SPECIAL REPAIR TO CGHS WELLNESS CENTRE AT KK NAGAR CHENNAI DG 22-23 PROVIDING AND LAYING VITRIFIED FLOOR TILES, WALL TILES REPLACEMENT OF WORN OUT STEEL WINDOWS WITH UPVC WINDOWS REPAIRS TO CRACKS IN WALL INCLUDING INTERNAL AND EXTERNAL ... VITRIFIED FLOOR TILES WALL TILES REPLACEMENT ...
REPAIRS TO FLOORING TILING ROOF TREATMENT SUNKEN FLOORS TREATMENT AC AND GALVALUME SHEETS AND CERTAIN ALLIED WORKS AT BALASORE AND NILGIRI
REPAIRS TO INTERNAL WATER SUPPLY LINES CLEANING OF WATER TANK AND PROVIDING PVC TANK AND COVER REPAIRS TO STAIR CASE PLINTH PROTECTION FLOOR TILES WALL TILES IN TOILETS PLUMBING SANITARY FITTINGS ROOF SHEETING FALSE CEILING WALL PANELLING INTERNAL E
REPAIRS TO INTERNAL WATER SUPPLY LINES, CLEANING OF WATER TANK, REPAIRS TO STAIR CASE, PLINTH PROTECTION, FLOOR TILES, WALL TILES IN TOILETS, PLUMBING, SANITARY FITTINGS AND ROOF SHEETING, ETC IN MD AND OTM ACCN IN ZONE A AT ARAKKONAM
VELLORE DISTRICT PROVIDING AND LAYING OF FLOORING TILES WITH WALL TILES AT VANDRANTHNAGAL CERMONEYSHED IN VANDRANTHANGAL PANCHAYAT KATPADI BLOCK GENERAL FUND 2024-2025 PACKAGE NO 24
Providing Aluminium framed mosquito proof stainless steel wire guage Aluminium sliding shutter (Balance portion) including vitrified tile flooring with epoxy joints for the GF toilet/ Warden room toilet in Old Boys hostel of IIHT, Salem.
Renovation of central excise and customs office, Bibikulam, Madurai Providing vitrified tile / granite flooring, renovating toilets, aluminium windows,false celing, internal and external painting, SH: providing inspection vehicle for madurai central subdivision-I, CPWD, Madurai for the period from nov-2024-may-2025
REPAIRS TO INTERNAL WATER SUPPLY LINES CLEANING OF WATER TANK AND PROVIDING PVC TANK AND COVER REPAIRS TO STAIR CASE PLINTH PROTECTION FLOOR TILES WALL TILES IN TOILETS PLUMBING SANITARY FITTINGS AND ROOF SHEETING FALSE ZONE B AREA AT ARAKKONAM
DISMANTLING OLD CLAY TILES IN TERRACE AND REPLACE WITH PAIN CERAMIC TILES AND NEW IRON STAIRCASE, HANDRAIL IN OUTER OF THE BUILDING AT STORE FEED HOUSE
PACKAGE NO.02 - Construction of houses for Combined House (4 Nos.) with Ceramic Tiles flooring at Aliyanilai Refugee Camp in Aliyanilai Panchayat (5 GROUP HOUSES 20 NO.OF HOUSES) in Aranthangi Panchayat Union, Pudukkottai District under SRI LANKAN RE
PACKAGE NO.01 - Construction of houses for Combined House (4 Nos.) with Ceramic Tiles flooring at Aliyanilai Refugee Camp in Aliyanilai Refugee Camp in Aliyanilai Panchayat (5 GROUP HOUSES 20 NO.OF HOUSES) in Aranthangi Panchayat Union, Pudukkottai D
RENOVATION AND ADDITIONAL FACILITIES PROVIDING FALSE CEILING, TOILET FLOORING AND WALL TILES, WATER SUPPLY AND SANITARY ARRANGEMENTS FOR COMMISSIONER QUARTERS IN SALEM CORPORATION AT DIVISION NO 15
Procurement of Multiple port outlet along with ceramic tiles 6mm thick for Unit IV HP 803 Bowl Mills
Supply and Fixing of Floor Tiles at IIM Tiruchirappalli
Provision for Kota stone Varadha area and ramp at PUM school Building (South facing) Valluvamabkkam H/O Valluvamabkkam Panchayat
Renovation of Boys hostel rooms, corridors etc., by replacement of old mosaic flooring with vitrified tiles flooring including renovation of toilet blocks flooring, fittings and damaged water lines of old boys hostel and providing aluminium framed mosquito proof stainless steel wire gauged aluminium sliding shutters including interior painting of walls and enamel painting of existing steel furniture items in old and new boys hostels and girls hostels at IIHT, Salem.
providing Bustand wall and plot form floor tiles in Adirampattinam Municipality
improvement work to the existing training centre room by replacing of damaged replacement of vitrified tiles works at central office building vallam road thanjavur
NCTPS II MI Circle MPM Unit I Mills 1A to 1J Fixing of ceramic tiles in the inner cone
PACKAGE NO.04 - Construction of houses for Combined House (4 Nos.) with Ceramic Tiles flooring at Aliyanilai Refugee Camp in Aliyanilai Pts (5 GROUP HOUSES 20 NO.OF HOUSES) in Aranthangi Block, Pudukkottai Dt under SRI LANKAN REFUGEES-2025-26 Phase-3
PACKAGE NO.03 - Construction of houses for Combined House (4 Nos.) with Ceramic Tiles flooring at Aliyanilai Refugee Camp in Aliyanilai Panchayat (5 GROUP HOUSES 20 NO.OF HOUSES) in Aranthangi Block, Pudukkottai Dt under SRI LANKAN REFUGEES-2025-26 P
PACKAGE NO.07 - Construction of houses for Combined House (4 Nos.) with Ceramic Tiles flooring at Aliyanilai Refugee Camp in Aliyanilai Pts (3 GROUP HOUSES 12 NO.OF HOUSES) in Aranthangi block, Pudukkottai Dt under SRI LANKAN REFUGEES-2025-26 Phase-3
PACKAGE NO.05 - Construction of houses for Combined House (4 Nos.) with Ceramic Tiles flooring at Aliyanilai Refugee Camp in Aliyanilai Pts (5 GROUP HOUSES 20 NO.OF HOUSES) in Aranthangi Block, Pudukkottai Dt under SRI LANKAN REFUGEES-2025-26 Phase-3
PACKAGE NO.06 - Construction of houses for Combined House (4 Nos.) with Ceramic Tiles flooring at Aliyanilai Refugee Camp in Aliyanilai Pts (5 GROUP HOUSES 20 NO.OF HOUSES) in Aranthangi Block, Pudukkottai Dt under SRI LANKAN REFUGEES-2025-26 Phase-3
RENOVATION AND ADDITIONAL FACILITIES PROVIDING TOILET FLOORING, WALL TILES, CUPBOARD SHUTTER, ALUMINIUM WINDOWS AND SANITARY PIPE LINE ARRANGEMENTS FOR DEPTY COMMISSIONER QUARTERS IN SALEM CORPORATION AT DIVISION NO 15
Providing kota stone flooring for front NSH entrance portion, back side hall and providing puff sheet roofing to 1st flr hall by replacing existing GI precoated sheet roofing and false ceiling at NSH in St Thomas Mt HO bldg under Fgn post
SPECIAL REPAIRS TO BASKETBALL CEMENT CONCRETE COURT TOILET AND KOTA STONE ON STAIR CASE OF KV SCHOOL WELLINGTON UNDER GE WELLINGTON
MAINTENANCE AND RENOVATION FOR PROVIDING TOILET FLOORING, WALL TILES, CUPBOARD SHUTTER, UPVC WINDOWS AND SANITARY PIPE LINE ARRANGEMENTS FOR CORPORATION NORTH SIDE QUARTERS IN SALEM CORPORATION AT DIVISION NO 15
Providing and laying vitrified tiles Painting inner and outer wall surface with emulsion and attending repair works at Residential Quarters Type - IV in V.O.C Port Trust.
NCTPS II MI Circle MPM Dn Unit I II Fixing of Ceramic Tiles in the Inner Cone filling of Ceramic Putty
Providing screed concrete to the roof slab and solar reflective ceramic tiles to the 110 KVSS control room building at Pallipalayam
Improvement works by providing Solar Reflective Ceramic Tiles and other allied civil works to the Mallur 110 / 22 KVSS Control Room
VITRIFIED FLOOR TILES OF SIZE: 600MMX600MMX8MM TO IS SPECN: 777 OF 1988, COLOUR: IVORY
Providing and laying kota stone floor drain line wall and floor tile sanitary works at Research and Development Laboratory buiding at Ambattur
REPAIRS TO FLOOR TILES AND WATER TANKS IN CERTAIN ACCN IN CVRDE AVADI
Providing Waethering Course and floor tiles at mittanamallie Primary School in ward 3.
SPECIAL REPAIRS TO COOLING APPLIANCES INCLUDING PROVN OF VITRIFIED TILES AND ALUMINIUM PARTITION IS ADM BLDG OF CQA (HV) AND CERTAIN OTHER MINOR WORKS UNDER GE AVADI
PROVN OF 81 BOUNDARY PILLAR AND INSTALLATION FOR A1 DEFENCE LAND AT MOUZA DALAN (3 MADRAS) AND PROVN OF WAITING SHED 6M X 5M WITH CHEQUERED TILE FLOORING AT SIRSA CAMP (STN HQ) FOR EX SERVICEMEN AT MIL STN KATIHAR (2ND CALL
Improvement works by providing double charged vitrified tiles, closing of door and window openings for expansion of SE/TEDC/METRO/TRICHY chamber in circle office building, Mannarpuram, Trichy
Laying of Vitrified Floor Tiles for 2nd Floor (Academic Office) corridors of Admin Building
Providing Paverblock Flooring for SWM Vehicl Shed in Thirukkattupalli Town Panchayat
Improvement works by providing double charged vitrified tiles, Dadooing with glazed tiles, doors, water sewer lines and electrification for expansion of SE/TEDC/METRO/TRICHY chamber in circle office building, Mannarpuram, Trichy.
Flooring work
REPAIRS TO ROOF TREATMENT SUNKEN FLOORS TREATMENT AC SHEETS FLOORING TILING AND CERTAIN ALLIED WORKS AT BALASORE AND NILGIRI AND REPAIRS TO DBS MCBSSUB MAIN AND POINT WIRINGSUMMER APPLIANCESEARTHING
Supply of MS Spool pipe fixed with 92 percent Al2O3 Ceramic tiles in the inner surface of the spool pipes for HP 803 Mills
SUPPLY OF MS SPOOL PIPE FIXED WITH 92 percent AL2O3 CERAMIC TILES IN THE INNER SURFACE OF THE SPOOL PIPES FOR HP 803 MILLS
Improvement work of Research and Development Lab building viz. laying of Vitrified tiles and providing UPVC windows and Doors, False ceiling in 110/230 KVA Substation premises at Tatabad, Coimbatore.