Loading…
Loading…
4,215 results • Best match
Providing and installation of 475 Nos. India Mark-III 65mm and 32mm Mark-II deep well Hand Pump in different divisions under Dharamshala Zone DZ of Himachal Pradesh.
Rectification of seepage issue in the pump room of the swimming pool, rebound hard plaster for squash court in A-06 building at North Campus of IIT Mandi
A R M O of LWSS GIRI SH Complete Repair Rewinding of 80 KW KRTK Pump KSB make installed at Bed No 7 at Raw water stage Balyog
Restoration of rain damages of Providing WSS to various Villages in Kasauli Constituency from Giri River SH Providing and fixing of submersible and monosubmersible pump at LWSS Mangoti
Restoration of rain damages of LWSS Salnoo Tehsil Sadar District Bilaspur (SH Providing minor repair of pump houses with white washing and painting 1st 2nd and 3rd stage).
Restoration of rain damages of various LWSS under JSV Sub Division Kandour in Tehsil Sadar District Bilaspur (SH Providing white washing and painting to pump houses section Talyana).
Purchase of spares parts of Mather platt pump Model no 100/125GST installed in HVAC system of Power House, chamera-III Power station, Dharwala ,Chamba (H.P.) PR-605
Oil Sampling Kit consists of Socket-36, Socket-50, Foot Pump with pipe, PRD blanking Plate, Pressure Gauge, Sampling arrangement with valve for Vande Bharat Trainset. Make- JSTI
RMO of Electrical installation fans electric sub station water supply pumps street light split Hot and cold inverter based AC CCTV lift at R and T wing production wing and RMO of 2 x 750 KVA sub station at DPT for year2025-26 SH Miscellaneous EI work in conference room and allied office room
Repair of 9 Nos. Hand pumps at different location under Jal Shakti Sub Division Kaffota and Rohnat
SH C/O Recharging structure at 29 Nos. defunct Hand pumps at various locations under Solan Division
Drilling by hand pumps with DTH ODEX Percussion Calyx Portable Rigs 87 mtrs deep ) UNDER DC Deposit
.
Turbo Charger, Fuel Pump, Water Pump, Air Filter, Release Bearing
SH- C/O Pump house cum attendant qtr, C/O P/well, C/O S/well of 191600 ltrs. cap., C/O main S/tank of 380000 ltrs cap , C/O Sectoral S/Tank of 5500 ltrs. cap, Provd. barbed wire fencing around the civil structure, P/L and Jointing API pipe etc
Sub Head Construction of 2 No. Percolation well 6 Mtr. Dia and 10 Mtr. Deep, 1 No. pump house at Puar (91.08 Sqm), 1 No oHSR main collection tank at Puar 230000 Liter Cap., 1 No. RCC U/G main storage tank at Node-1, 750000 Liter cap. , 1 No. RCC s
SH C o Site Development C o 1No Pump House attendent quarter and C o of Sump well at stage 1st 72000 ltr cap C o RCC spring intake C RCC sed Tank 18000 ltr cap C o filter bed 89833 ltrs 32 97sqmt small nalla source C o 1No 72000ltr cap Delivery
Const. of Head weir, Const. of Intake Chamber 1 No, Const. of Semp well at Node 3 200000 ltrs cap. Const. of RCC Storage Tank at Node Q 1 No. 67000 ltrs cap. Const. of RCC Storage Tank Node N 1 No. 46000 ltrs. cap. Const. of Pump house for 1 and II
Sub Head Construction of Pump House, Collection Tank of 95000 ltr. Cap at Node No. 2. Over Head S/Tank 120000 Ltr. Cap 15 mtr. Stagging Ht. At Node No. 3 Over Head S/Tank 60000 ltr. Cap 15 Mtr. Staggging Ht. at Node No. 4 (PH-I) Over Head S/Tank of
C/O Head weir at Matyara Khad C/O Collection Chamber C/O Pump House C/O Main Delivery Tank Main Channel of 5010 Rmt C/O Nallah Crossing of 20 Mtrs 1 No C/O Nallah Crossing of 5mtrs 7Nos C/O Protection of Head weir Removal of Debries R/WALL
SH CO 1 No RCC Intake Tank CO 1 No Pump House Cum Attendant Quarter CO RCC Filter Bed as per standard design at Node 1 43.37 sqrm 2 Units CO RCC Sumpwell of standard design at 1st Node 1 56000 ltrs cap C/O RCC Storage Tank as per Standard design Nod
CO RCC Manhole Chamber from Sain Curve to LIS Sain Pump House 24 Nos CO Retaining wall to protect the DI pipe 600mm dia RD 0 to 30 30 Rmt 60 to 80 20 Rmt 120 to 130 10 Rmt Laying Jointing and testing of DI pipe 600mm dia K7 Sain Curve
Custom Bid for Services - Repair or calibration of FIP inline pump assembly along with 06 injectors in respect of Ashok Leyland Tipper 1616 Similar Category Repair and Overhauling Service
Installation of Hand Pump at Village Lower Gankhetar house of Smt Sheetal, Rekha and Anu Rani Ward No. 3 Gankhetar in Tehsil Baijnath District Kangra HP under Deposit Work
Construction of Car Parking near Hand Pump Bye pass road Jiwnoo Colony (SH Site Development and fram structure) Phase III in ward No 27 under Shimla Smart City Mission
Restoration of rain damages to LWSS Tourkhola and Multivillages water supply scheme in Tehsil Dharampur Distt. Mandi HP Energisation of various hand pump borewells under JS Sub Division Tihra
Tender for SOP to energization of hand pump at village Bhadroun from existing 100 KVA 11/0.4 KV S/Stn. Bhadroun in (E) section Talyana under ESD HPSEBL, Kandrour.
AR and MO LWSS Kiari and Baghar Dhalli in GP Kiari Tehsil Kotkhai Distt Shimla HP SH Repair of Kirlosker brother Movi pump RKB 40/14H13 Sr No 113301140150
Repair, testing, commissioning and balancing of VT Pump including fabrication of different parts of cooling water system of 3x40MW SVP Bhaba Power House under Electrical Mtc. Division HPSEBL Bhabanagar
Purchase of Minova Rappas Mortar and Supply of LOVA REED Pump on hire basis for use at TBM site at Parbati HE Project Stage-II (Package No. PROC-1810)
C/o Link road from Hand Pump near School to village Dabla House of Sh.Brij Lal,Raj KumarGP Dabla SH Providing and laying cement concrete pavement etc under VKVNY
Development of Micro Hydro Power Project (2X82KW) utilizing mandatory environmental- flow at exit location of Dam site of Parbati-III through the most economical PAT (Pump As Turbine) technology
R_R of LWSS Jabal Kothi Kanwal 1st stage in Tehsil Arki District Solan HP SH Repair of KSB make pump 50 HP Sr No 12105298132_10 stage in 1st call
R_r of LWSS Punnu ka nallah 1st stage in Tehsil Arki District Solan HP SH Repair of KSB make pump 50 HP Sr No 9610641_751_14 stages in 1st Call
R_M of LWSS Behlli Bagain 1st stage in Tehsil Arki District Solan HP_ SH Repair of Mathar platt pump 75 HP Sr No_81219070_100_02_12 stages under CRF in 1st Call
R_R of LWSS Behli Bagain 2nd stage in Tehsil Arki District Solan HP SH_ Repair of KSB make pump 50 HP Sr No 210572_11 stages under SDRF SDF_2025_151 R_o
Digital Survey and soil investigation for c o VRDL Lab at AIIMS Bilaspur Chargeable to contingency of construction of 2 Nos RCC Water storage tank 4 Nos pump room
RM of LIS Gumma in GP Gumma Tehsil Kotkhai Distt Shimla HP SH Repair of KSB make pump KSB WL-50/7 and rewinding of 50HP crompton make motor
groz 15 tonne Hydraulic Jack / Bottle Jack with integral pump Brand: groz (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687775282626 dt.24/07/2026)
LAVAKA 20 tonne Hydraulic Jack / Bottle Jack with integral pump Brand: LAVAKA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687701390589 dt.24/06/2026)
REPAIR/ MAINTENANCE OF VARIOUS TYPES OF PUMPS, MOTORS, CHLORINATION PLANTS, MOTOR PROTECTION PANELS AND CONNECTED WORK AT DALHOUSIE
A R M O of LWSS Shimla Town from River Giri SH Repair of 90KW 120HP KSB make KRTK pump installed on bed No 3 at raw water stage LWSS Giri
SH Site development for all CiVil Structures C O RCC intake chamebr 1 no C o RCC Storage Tank 4Nos of 10000 ltr cap each C O Sump well 1Nos 10 000 Litrs Cap C O RCC delivery tank 3 Nos 10000 ltr cap C o of 1 No Pump house cum attendant qua
C/o Balance Work of Path from Hand Pump road at Sharma House onwards and from the H/o Dr. Dheeraj Kapoor to Sh. Anil Khanka in ward No.13
Repair/ Rewinding and reconditioning of 2 Nos. 150 HP, 3 Phase Induction motor of vertical cooling pump of machine of 3x40 MW SVP Bhaba Power House, complete in all respect.
Repair ,testing and commissioning of 1No. of VT Pump including fabrication of different parts of cooling water system of 3x40MW SVP Bhaba Power House. under Electrical Maintenance division HPSEBL, Bhabanagar.
M C Ambulance road from Hand pump to Govt Primary School Majiath RD 0 00 to 0 370 SH G I G II and M T etc Ward no 7
AR MO of LWSSLIS under Jal Shakti Sub Diviaion Joginder Nagar in Tehsil Joginder Nagar Distt Mandi HP SH Providing and fixing various mechanical and electrical material in pump houses
Repair ,testing assembling and complete commissioning of VT Pump including fabrication of different parts of cooling water system of 3x40MW SVP Bhaba Power House. under Electrical Maintenance division HPSEBL, Bhabanagar
Electrical Renovation / Repair work of House Allen Bank Annexes, Sector-III, Shimla (H.P.). (SH:- Wiring / Rewiring points and installation of LED batten, Bulkhead, 2x2 LED fitting, down lighter, Booster pump).