Loading…
Loading…
10,870 results • Best match
Construction of link road from kathlag to Bharera km 0/0 to 2/180
Restoration of Rain Damages on link road Mayoth km 0/00 to 6/930
C/o Link road M/s Leo design and Veeline Media Bersan, Manjholi, Nalagarh.
C/o link road from Baba Bankhandi road to Dalit Basti W No7 G.P.Haroli
C/O LINK ROAD TO VILLAGE DROBI TO LOWER GHATRER ROAD 0.000 TO 1.625KMS
Construction of link road Anti Subhar to Harijan BastiDharkoti Serthi Km 0.0 to 2.750
CO Rain Shelter at Kotlu near link road Kotlu SH C O Rain Shelter
C/O Link road Harijan Basti Saloh Beri to Saloh in Gram Panchayat Saloh
R/R Damages of Link road from NH-105 Chikni bridge to village Plasra
Construction of Link road from Sisri to Takrasi Tharvi Km 0.000 to 4.350 HP06371
Improvement widening and laying of Paver on Link road to village Rajpura Distt. Chamba
C O link road Khatarwa to village Maira Km 0 00 to 3 00
C/o link road from Gothana to Koldu km. 0/00 to 1/100
CO jeepable link road from Sh Jamlu Rishi Parisar Soil to Seri Ri Dhar
RR Damage link road from Bautinalla to Barara road SH CO Grating over drain
C/o link road leading to M/s Yamada Automation, Vijay Industries Dherowal, Nalagarh.
Construction of link road from Pangi to Thopan Km 0.000 to 10.250 HP.05.63
Annual Maintenance Plan for the year 2022-23 on link road Arla to Naya Nagar road in Km 000 to 3500 SH Providing and laying renewal coat by providing 30mm thick Bituminous Concrete thermoplastic edge line in Km 000 to 200 Under PMGSY
construction of approach road and gate near indoor hatchery and boundary wall for residential quarters at carp Fish Farm Gagret Distt Una HP
Construction of approach road from Dadima to ITI Bharmour Distt Chamba (SH C/O R/Wall at RD 0/565 to 0/582.
Restoration wall and hume pipe culvert on approach road to tail race gate at El.602 mtr. of Power House Building at Chulla
C/o Helipad to Raindhar in GP Sharan Tehsil Thunag Distt Mandi (SH- Widening approach road Brest Wall Toilet block and M/T
Construction of Bus Stand at Lakkar Bazar Shimla Distt. HP (SH Balance work of Retaining wall below approach road to parking floor etc.)
Upgradation of Ganvi to Fancha road Km 0.000 to 9.500HP09723 PMGSY III
Upgradation of Nainavati Karad road Km 0.000 to 5.000 HP06358 PMGSY III
Upgradation of Taklech to Khanortu road Km 0.000 to 6.500HP09724 PMGSY III
Upgradation of Shakrela Karoli road Km 0.000 to 6.000 HP09729 PMGSY III
Upgradation of Luhri Jaon road Km 11.000 to 27.020 HP06356 PMGSY III
Improvement of road width by providing wire crate edge wall at Km. 0/30 to 0/270
Annual Maintenance Plan-I for the year 2025-26 on Thatharna to Thanga i.e link road to Village Devna km. 0/0 to 3/130 VR (Non PMGSY)(SH Repair of pot holes and Bitumenous Concrete 25 mm thick using plastic based from Km. 2/00 TO 3/130 ) 1.1
Special repair of road from CETP to MSW plant at Kenduwal
Construction of link road from Yol to 53 Mile (Yol Rajiana) road Km 0/000 to 10/555 in Distt. Kangra (H.P.). (Sh-Construction of road side Drain, both side Footpath and Steel work etc in Km 10/250 to 10/555)
Restoration of rain damages on link road Dangar to Lower Dangar via Kulsai km 0/00 to 0/800 SH ROFD , Construction of road side U-shape drain at RD 0/00 to 0/100 and Cement concrete pavement at Junction Zero point
Periodical Renewal coat 30mm thick bituminous concrete with paver on Link Road Patehar Spouri Road km 2000 to 2500 HP1204VR0093 and Link Road Jubehar Saroi to Harijan Basti Jubehar km 4000 to 4870 HP1204VR0135
Construction of link road from C/o link road from Kandhela to Dari Kirog km 0/0 to 3/800. (SH- Construction of 3.0x3.0 mtr RCC Box cell type culvert at RD 2/850)
Construction of link road from C/o link road from Kandhela to Dari Kirog km 0/0 to 3/800. (SH- Construction of 3.0x3.0 mtr RCC Box cell type culvert at RD 2/850).
Job 11 Periodical maintenance on Link road from Dulehar to Bathri Km. 0-0 to 0-340 HP1203VR124 and link road to Village Gondpur Bula km. 0-0 to 0-830 HP1203VR160 . Sub Head
C/o Bailey Bridge over Marathu Khad on Link road to village Lohat, Supplying and erection of 33.54 mtr span DSR Bailey Bridge at site over Marathu Khad on Link road to Village Lohat
Prepration of DPR for the Link road Langadhar to Sarot Jubbal in km 0/000 to 3/330. and ii Link road Kala Dhank to Battar Jubbal in km 0/000 to 2/450.
Construction of roads, road side drains and culverts at I.A. Pandoga Distt. Una (HP) (SH- Construction of septic tank).
SH-Providing and Laying bituminous concrete between Km. 0-0 to 2-0 Under Non PMGSY Rural road.
Job 3 A.R and M.O of link road Kuthar Kalan to Rakkar via Jalgran Road km. 0-0 to 3-0, Link road Behdala Chattara Pirnigah Road km. 5-700 to 6-700 and Link road GHS Behdala to Khinderian and Plasrian km. 0-900 to 3-0 Sub Head P.L Patch work in variou
Marking of road pavement with thermoplastic material, Reconstruction of road side damaged drains, strengthening of road berms in BBMB Colony Sundernagar area (Phase -II)
C/o link road to Gharsi Bramana SH P/L Gr-III and 20 mm thick premix carpet and seal coat in km 0/0 to 1/200
Construction of link road Guru Kund Talli road k m 0 0 to 12 200
Widening of road leading to Churat from Dhalli Tunnel RD 0 0 to 1 240 in ward No 21 Mashobra (SH Widening between RD 0 680 to 1 100)
Balance work Widening of road from Pump House to Hotel Palace RD 0 0 to 0 250 in ward No 17 Benmore (SH Cutting Retaining wall in different RD)
Widening of road leading from rain shelter to PWD road Bharari RD 0 0 to 1 500 (SH Construction of Retaining wall below RD 0 900 to 0 950
(SH Providing and Laying 30 mm thick Bituminous Concrete in Km 0/0 to 0/150 ) 0.150 km
Restoration of Rain Damages on link road to village Tarsooh km 0/00 to 1/200