Loading…
Loading…
10,870 results • Best match
Construction of V-Shape drain at RD 0/180 to 0/210 0/470 to 0/490 0/660 to 0/680 and 0/960 to 0/990 and Providing and laying interlocking Paver block at RD 0/190 to 0/205 and 0/470 to 0/480 on Link road to village Kehdroo km 0/0 to 1/0 VR-130
Repair of road to deodhar w. no. 2 N.P. Arki
C/O link road from Jaukhala to Kandala in km. 0/0 to 1/0(SH-Widening of road in km. 0/045 to 0/195,C/O R/wall at left side km. 0/0 to 0/024 and Right side km. 0/0 to 0/034) and p/l cement concrete, pavement in km. 0/0 to 0/415 and 0/463 to 0/583).
(Sh - P/L 30mm thick Bituminous concrete in KM 2/00 to 3/00)
(Sh - P/L 30mm thick Bituminous concrete in KM 3/00 to 4/050)
Periodical Renewal for the year 2023-24 on Link road Bhaderkali to Abheypur (SH. Providing and laying 30mm thick Bituminous Concrete in Km. 0/0 to 1/0, 1/0 to 1/330 and 1/380 to 2/0 and 2/0 to 3/0) HP1204VR0025523-PMGSY road
Channelization of Nallah between RD 720 m to RD 735 m near Satya Sai School on approach road to Regional Office Banikhet
PROVN OF SINGLE RAMP APPROACH ROAD INCLUDING PLATFORM AND 01X SENTRY POST IN MT AREA UNDER AGE BR-I AT YOL CANTT
Restoration Rain damages to LWSS Shimla City from Chair SH C O PCC R Wall for approach road of Chair Pumping Station
Tarring work/cement concrete pavers of approach road to main hotel Palace, Rajgarh Cottage and Log Huts at Chail Distt. Solan (H.P).
Restoration work to protect the 132/33Kv Sub-station yard and approach Road to Electrical Sub-division No.1 under ED Hamirpur
M/R to DPRA under Lower Summer Hill, Shimla during 2022-23. SH: Repair of Roads near D-Block & E-Block at Summer Hill, Shimla (H.P.) Subwork/Packages: M/R to DPRA under Summer Hill, Shimla during 2022-23. SH: Repair of Roads near D-Block & E-Block at Summer Hill, Shimla (H.P.)
Periodical Renewal coat 30mm thick bituminous concrete with paver on Link Road Bharwain to Aranwal Km 000 to 0870 HP1204VR0114 and Link Road Mirgoo to Amokla Sidhu Km 2330 to 3850 HP1204VR0066
Restoration of rain damages on link road to Village Kahe Ra- Ban G.P Dharmana and link road to Village Baddu G.P Ramshehar (SH Hiring of JCB on hour basis) Under D.C Deposit
REPAIR/ MAINTENANCE OF INTERNAL ROAD, FURNITURE AND ROAD PAINTING AT 14 GTC SUBATHU UNDER GE KASAULI
Repair to internal road furniture items and sign boards under AGE (I) R and D Manali.
REPAIR/ MAINTENANCE OF INTERNAL ROAD, FURNITURE AND ROAD PAINTING AT DAGSHAI MIL STATION UNDER GE KASAULI
C O Link road to Gharshi Brahmana SH PL 20mm thick premix carpet and Seal coat in Km. 000 to 1 120 Under MMGSY
SH Providing and laying 20 mm thick Premix carpet with Seal coat in km 0-0 to 0-300 0.300 km
Job1 Construction of link road Umrali to Beetan to Gahua in tehsil Haroli Distt.Una
Providing and Laying Bituminous Concrete in Km. 0/0 to 2/200 Under Non PMGSY Rural road
Providing and Laying bituminous concrete in Km. 0/0 to 5/500 under Non PMGSY Rural Road.
Providing and Laying Bituminous Concrete in Km. 0/0 to 2/0 Under Non PMGSY Rural road
Providing and Laying Bituminous Concrete in Km. 11/0 to 22/645 Under Non PMGSY Rural road
Providing and Laying Bituminous Concrete in Km. 0/0 to 2/0 Under Non PMGSY Rural road
Providing and Laying Bituminous Concrete in Km. 0/0 to 2/0 Under Non PMGSY Rural road
(SH- P/L 30mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 1/600) and Rural Road Balla Badiara Harizan Basti road (HP0406VR098) km. 1/0 to 2/0 (SH- P/L 30mm thick bituminous concrete in km. 1/0 to 2/0)
Maintenance/Repair of roads and paths of DPRA at Longwood Shimla during 2022-23. SH: Repair of existing road and path at Craigdhu Longwood Shimla (H.P.) Subwork/Packages: Maintenance/Repair of roads and oaths of DPRA at Longwood Shimla during 2022-23. SH: Repair of existing road and path at Craigdhu Longwood Shimla (H.P.)
Job 6 Periodical Maintenance on link road to Tahliwala Chowk km. 0-0 to 0-280 VR123, link road Panjuwana to Baliwal via Bhanewal km. 0-0 to 0-900 VR140, Link road from GSS Palkwah to Pangoli Sudhre Mohalla to Swan Km 3-0 To 3-680 VR166 Sub Head Patch
Annual surfacing on link road to village Churat Renewal coat 30 mm thick Bituminous Concrete in Km 2/000 to 3/000 and Annual surfacing on link road to village Shalota Km 1/000 to 2/000 and km 2/000 to 3/000 and Annual surfacing on link road to vill
P/F 80 mm thick ISI Mark tiles on internal roads of HBC Colony, Phase 1 and 2 # 26 to #21, #495 to #453, #431 to #434 , #397 to #407, Baddi
P/F 80 mm thick ISI Mark tiles on internal roads of HBC Colony, Phase 1 and 2 # 230 to #233 , #243 to 245, #65 to #102, #65 to #73,Baddi
Widening of road from Pump House to Hotel Palace RD 0 0 to 0 250 in ward No 17 Benmore (SH Cutting Retaining wall in different R D)
C/o road from Jyog to Nalwad km. 0/00 to 2/00 (SH Widening of road jeepable to motorable standard in km. 0/00 to 2/00)
Periodical Maintenance on Link road Damod Arloo in km. 0000 to 1750 and Link road Charara Arloo via Baggi in Km 3000 to 4500 SH PL 30mm thick Bituminous Concrete including Profile Correction
Periodical Renewal coat 30mm thick bituminous concrete with paver on Link Road Marwari to Bakhawa Km 200 to 2600 HP1204VR0101 and Link Road Prithipur Dadhwala mohalla Rampurian Mohalla Km 000 to 0750 HP1204VR0108
Re-carpeting of link road from Salewal to Rajpura Harijan Basti km 0/00 to 0/960, Re-carpeting of link road from Jhiriwala Dabota to Ratyor Km 0/00 to 1/000.
Re-carpeting of link road from Glenmark factory to Manguwal.(Rd 0/00 to 0/800), Re-carpeting of link road from Mahadev Bridge to Bela-Majri. (Rd 0/00 to 1/00).
C/o boundary wall, approach road, c/o shed, protection work, RCC culvert and other miscellaneous works).
including five year maintenance PMGSY-II Batch-I 2019-20 RRP-II HP-03-150
P/L 30mm thick bituminous Concrete in Km 3/360 to 5/000)Under PMGSY
Implementation of periodic renewal of PMGSY road through PMGSY incentive received from Govt of India (SH Metalling and tarring Bharari to Bhont road RD 1/840 to 4/00
Improvement of road from allied Industries towards Solid Waste Site Sector 5, MC Parwanoo 0/0 to0/48mtr
Improvement of road from allied Industries towards Solid Waste Site Sector 5, MC Parwanoo 0/48 to0/96mtr
Improvement of road from Plot No 32-35 Sector -1, MC Parwanoo R/D 0/0 to0/48mtr
Metalling /Tarring of link road Paliur to Drabbar Km. 0/0 to 1/500
C/o link road from Kathand to Kutwa km. 0/00 to 1/400
C.O LINK ROAD TO BALIYANA WARD NO 5 GP BALIYANA KM 0.0 TO 1.0
Construction of link road from Kiyod to Malwan km. 0/0 to 3/210
Annual Maintenance Plan for the year 2023-24 on link road to PWD complex