Loading…
Loading…
646 results • Latest
Removal of silt and jungle clearance of Distributary-1 from Km 11.00 to 13.50 Km and lateral-13 & 15 of SLI in Selected Reaches.
Removal of silt and jungle clearance of BD-1 of Distry-1 from Ch. 3.00 to 6.50 Km & Lateral-1 & Lateral -3 of BD-1 Of Distry-1 Of SLI
Improvement to service road & repairs to canal lining portion including raincuts of Sonthi Main canal from Ch Km 10.00 to 18.00 in selected reaches.
Removal of silt and jungle clearance of Distributary-1 from 3.00 KM to 7.00 Km and lateral-3,4,5,6 &7 of SLI in Selected Reaches.
Removal of Silt and Jungle clearance of selected reaches coming under Sonthi Feeder canal & Sonthi main canal(Excluding Trough aqueduct portion)
Removal of Silt and Jungle clearanceof selected reaches coming under Distributory-5, Distributory-6 , Sonthi Main Canal, Lateral-1 &2 of Distributory-4 of Sonthi Main Canal of Sonthi LIS.
Dismentaling of CTs and Providing CTs to 220KV substation at Balakundi Village under Koppal LIS on Emergency Basis.
Providing Viewers Gallery at Narayanpur Dam
Providing Power Supply to Narayanpur Dam from Budihal-Peerapur LIS Sub Station, Shifting of existing DG sets provided at Spillway near to TC yard including construction of DG room and Providing new TC for dyke street lighting of Narayanpur Dam
Restoration of Installed Twin Tube Piezometers and standpipe Piezometer on LBED, RBED and Dyke at Narayanapur Dam
Modernization of Lateral No.9/2 from km 0.00 to 6.00 km of Dy-2 of SBC Including Structures.
BALANCE CC LINING WORK AND EXTENSION WORK OF DY5A OF SBC FROM CH2.00 TO 3.950 KM AND BALANCE CC LINING WORK FROM CH 0.00 KM TO 4.650 KM OF LAT1 OF DY8A OF SBC
Providing Furnitures and Cubics to New CE office Building at Narayanpur Camp
Arresting of joint leakages of Tidagundi branch canal viaduct from chainage 2.70 km to 17.43 km under Mulwada LIS stage - III
Appointment of Internal Auditor for the Financial Year 2025-26,2026-27 and 2027-28
Construction of Cross Regulator at Ch 41.00 Km of SBC Main Canal for diversion of Water to Shahapur Storage tank for drinking purpose during summer period
Filling up of Nagathan tank and Hunshyal Tank off taking from distributery No 1 of TBC comes under Bijapur Main Canal
Protection wall to escape nala at km 16.12 of distributary-11 of IBC at farmer land Sy No-5 in Kulekumatagi Village taluka Sindagi
Providing Man Power Typist, Peons, Drivers, Watchmans and House Keeping Labors to the Managing Director KBJNL Almatti office for the year 2025-26.
Providing Manpower (Typist, Peons, Drivers, Watchman & other house Keeping Labours) to the Dam Zone, Dam circle, Dam Division & its Sub division Offices alondwith New & Old IB at Almatti Dam Site for the year 2025-26.
Re-Drafting (Auto Cad), Scanning, Printing & Lamination of (in 80 micron) of the important Drawings and records of Almatti Dam
Removing PCC /Shahabad slabs from the side lining of canal, Providing cohesive non-swelling (CNS) soil lining to canals using soil from borrow area, Earth work excavation for Foundation by mechanical means, Providing and laying insitu vibrated M-15 grade cement concrete for side lining of canal, M10 for foundation, M20 for sub structures, Providing and filling Murrum/Gravelly soil (CNS soil) for foundation and Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class.
AME of AEE KLIS Sub Division No.2 Kushtagi office Building Maintainance for the year 2025-26
Improvements of Ayacut road from Ganganahalli to Sirakanahalli Km 0.00 to 2.00( Ganganahalli Village to Govt School) in Devarhippargi Tq, Vijayapur District.
AME of Joladadagi-Gudur bridge cum barrage operation of gates for the year 2026-27 (Manpower)
AME of Yadgir Bridge cum barrage operation of gates for the year 2026-27(Manpower)
Consultancy Services for Detailed Survey and Investigation Preparation of Designs Drawings Estimates Detailed Project Report (DPR), Package estimate and Draft Tender Documents for filling up of 19 Nos of MI/ZP tanks under Koppal lifting Irrigation Scheme in Ron Taluk of Gadag District.
Improvements to Road from Devar Hipparagi (NH-218) to Haranal Village in Devar Hipparagi Taluk of Vijayapura District under UKP
AME of Escape Channel from KM 0.00 to 4.00 km Offtaking at Ch26.00Km and tailend of BD-5 of NRBC Dy-18
Providing Man Power (Typist, Peons, Drivers, Watchmans) to the MLI-4 Division & its Sub Division offices for the year 2025-26.
Supply of Computers, Printers, Chairs, Almera, Racks and other office furnitures for Division and Subdivision offices under Zalaki Division for the year 2025-26
Providing and fixing of new xerox machine for circle office narayanapur
AME of AEE KLIS Sub Division Yalaburga Office building Maintenance for the year 2025-26.
Providing ManPower (Typist, Peons, Drivers for Office Jeep and Watchman) to the ALBC Division, Almatti for the year 2025-26
Removal of Silt and Jungle of Sonthi Main Canal of Sonthi lift Irrigation Scheme from Ch.5.00 to 10.00 Km
Construction of Protection Wall and Raising Embankment from Ch 6.200 to 6.500 km of Arakera Branch Canal of NRBC Distry 9 (A)
Construction of HR of Lateral no.03 at CH 25.780KM and Scour filling in Escape Channel from KM 0.00 to 0.030 and from KM 0.280 to 0.300 in lat no.3 of Dy 18
Scour fillling to service road of Distry-01 at Ch 11.00 km to 12.5 km of SLIS
Removal of silt and Jungle Clerance From km 2.00km to 3.00 km of Lateral no-07 of Sonthi Branch Canal of SLIS
Removal of silt and Jungle Clerance From km 0.00km to 1.00 km of Lateral no-02 of Sonthi Branch Canal of SLIS
REMOVAL OF JUNGLE CLEARANCE AND SILT OF LATERAL-24 OF BD1 OF NRBC DY-16 & LATERAL- 5 &6 OF SBD1 OF BD-1 OF NRBC DY-16. (IN SELECTED REACHES)
REMOVAL OF JUNGLE CLEARANCE AND SILT OF LAT-5 AT CH 0.00 TO 2.880KM OF BD-1 OF NRBC DY-15.
AME of SBD-1 of BD-1 of NRBC Dy-16 From Ch 0.00 to 12.00km & its Laterals for the year of 2025-26
REMOVAL OF SILT FROM CH 4.50 TO 6.50 KM (IN SELECTED REACHES) OF WADAVATTI BRANCH CANAL OF NRBC DY-9(A)
AME for the year 2025-26 and Re construction of Drop and CTC at 0.18Km of Lateral-2 of BD-2 of NRBC DY-16
AME Of SBD-2 and its laterals of BD-1 Of NRBC DY-16 for the year of 2025-26