Loading…
Loading…
17,005 results • Best match
Upgradation work for PHC Badaragoan of Niali Block under Ama Hospital initiative in the District of Cuttack for the year 2025-26
Laying of MV cable upto 25sqmm in ground (5.1.1)
Upgradation work for PHC Pahanga Niali Block under Ama Hospital initiative in the District of Cuttack for the year 2025-26
Laying of MV cable upto 25sqmm in ground (5.1.1)
Upgradation work for PHC Govindpur of Kantapada Block under Ama Hospital initiative in the District of Cuttack for the year 2025-26
Laying of MV cable upto 25sqmm in ground (5.1.1)
SW 1:-Construction of 2 lane ROB in lieu of LC no.1 as 1X30.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Amaravathy Nagar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Desihalli)(Approach Span)+ RE Blocks and Retaining Wall (Approach Portion)) at km 1/800-900 along with LHS between BWT-COL stations of BWT-MKM section of SBC division. (Composite work) SW 2:-Construction of 2 lane ROB in lieu of LC no.162 as 1x36.00m Composite Girder (Railway Span) + 3x18.71m PSC Girder+1x10.5m RCC Slab (Towards Kolar) + 2x18.71m PSC Girder+1x10.5m RCC Slab (Towards Bangarpet) (Approach Span) + RE Blocks and Retaining Wall (Approach Portion)at km 144/900-145/000 and construction of pedestrian subway between BWT-KQZ stations of YNK-BWT section of SBC division. (Composite work)
30.00 dia) for cable laying with offset at both ends... pipes with couplings and laying of cables is not included in this ...
A-Bhopal Division - Raising of existing platforms to High level at MSO (3), ODG (1) & PRKD (2) stations in BPL-ET section. B-Bhopal Division - Raising of existing platforms to High level at PAI (2), BET (2), KAH (2) MABA (3) & KIKA (2) in BPL-BINA section. C-Bhopal Division - Raising of existing platforms to High level at SUW (2), DWG (2), SMT (2), SUMR (2) & GLG (1) stations in BPL-BINA section
3 00403 Cable laying under concrete/road/Track in hume Metre 300.00 510.19 153057.00
Sabarmati - Kalol Section :- Replacement of existing 66 kV overhead power line crossings by underground cable
... installation of the power cable. Laying / installation of single ...
Improvement of illumination in yards of various stations over Nagpur division.
Provision of trench in all kind of normal Soil to depth 40x100cm & filling the trench (After laying cable) to bring the original condition.
as per nit.
... / stay/earth plate / for laying cable/ pipe & clearing the site ...
PROVISION OF PCC HARD STANDING AND SS BENCHES NEAR P-54 BUILDING AND PROVN OF TREATED WATER SUPPLY TO ARBOURICULTURE AT ICGS OKHA UNDER GE (I) CG PORBANDAR
... out excavated material for laying cable/GI tube, returning filling ...
Maintenance/repair/renovation of Indoor Hall and replacement of running/jogging Track of NMAK Pataudi Sports Complex, Jamia Millia Islamia, Sub-Head (B) Replacement of Conventional Metal Halide fitting into LED ceiling fitting in Indoor Table Tennis
MV CABLE LAYING
Providing, Supplying, Erection, Testing and Commissioning of Pole and Light at Gram Nagor Ward 66.File No.14/26X6/4.2nd Call.
CABLE LAYING Laying of one number PVC insulated and PVC sheathed power cable of 1:1 kV grade of size not exceeding 25 Sq.mm in the existing RCC Hume/Stone/Ware/G.I. pipe as required
PROPOSED BEAUTIFICATION AND STREET LIGHT POLE FIXING IN PRABHAG NO. 11 FROM BHARAT GAS AGENCY TO DARLUM POOL TO DARLUM MASJID, GEORAI, TQ. GEORAI, DIST. BEED
... / stay/earth plate / for laying cable/ pipe & clearing the site ...
EXECUTION OF WORK FOR SYSTEM AUGMENTATION/STRENGTHENING, AND CONSTRUCTION OF NEW LINE AND MISC. WORKS (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-CHAURI CHAURA, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2026-27
Laying of G.I. Pipe 6 " Dia pipe for laying of 11 KV 3X185 sq mm XLPE Cable with hdd method including cable laying
Work under Business Plan 2026-27 against approved Estimate (25 No.) 3rd under EDD-Kairana.
Cable laying by sand and bricks of Various type 33KV /11 KV XLPE cable.
Work under Business Plan 2026-27 against approved Estimate (14 No.) EDSD- 2 UNDER EDD-Shamli.
... 0.45Mtr. x1.05 Mtr. and Laying cable in trench and Providing ...
Supply and Installation decorative pole at IA. IIDC Baghpat with 03 year warranty and AMC
... complete in all respects cable laying in existing pipe. (Havells/Polycab/Grandley)
Comprehensive Electrical Maintenance for non resident building of (SDH) Hinjilicut, CHC Chikiti, CHC Digapahandi and other CHC in the district of Ganjam.
Cable laying on wall surface with steel shaddle 25sqmm
Supply and installation High Mast lighting at Different Industrial Areas at Ghaziabad with 01 Year AMC.
... complete in all respects cable laying in existing pipe. (Havells/Polycab/Grandley)
Replacement of 6 quad cable of various sections of Mumbai Division.
... plan and refilling after cable laying. This work includes covering ...
Repair of various ROBs and provision of ladder, inspection platform in ROBs over Jhansi Division under Dy.CE/Br/L/JHS.
... kg/sqm in footpath of ROB for laying cable with all contractor's materials ...
Signaling Work in connection with fencing work in KALYAN - IGATPURI section of Mumbai division.
... plan and 18 refilling after cable laying. This work includes covering ...
SPECIAL REPAIR TO BLDG NO.P-10 (04 QTRS) OF JCOs MD ACCN AT PREM BHAGAT COLONY AND BLDG NO. P-81, P-82, P-83, P-85, P-86 AND P-87 OF THE SIKH LI REGT CENTRE FATEHGARH CANTT
Supply and Laying cable XLPE Insulated screened ...
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/BPB/IC.
... Mtr. for track crossing of cables, laying of DWC/ RCC pipes with collar/coupling,... sleepers for track crossings. Laying of cables is not included in this ...
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/BPB/IC.
... Mtr. for track crossing of cables, laying of DWC/ RCC pipes with collar/coupling,... sleepers for track crossings. Laying of cables is not included in this ...
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/Hill/LMG/IC.
... Mtr. for track crossing of cables, laying of DWC/ RCC pipes with collar/coupling,... sleepers for track crossings. Laying of cables is not included in this ...
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/Hill/LMG/IC.
... Mtr. for track crossing of cables, laying of DWC/ RCC pipes with collar/coupling,... sleepers for track crossings. Laying of cables is not included in this ...
Reliability improvement by means of repairs, restoration/ maintenance of signaling assets under the jurisdiction of SSE/Sig/BPB/IC.
... Mtr. for track crossing of cables, laying of DWC/ RCC pipes with collar/coupling,... sleepers for track crossings. Laying of cables is not included in this ...
CONSTRUCTION OF SHRAMIK RESIDENTIAL SCHOOL (FROM 6TH STD TO 12TH STD) AT Udakeri Village, Bailahongala Taluk, Belagavi District
code277 Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff2.5 sqmm to 25 sqmm 0.10 Km
CONSTRUCTION OF SHRAMIK RESIDENTIAL SCHOOL (FROM 6TH STD TO 12TH STD) AT Kogganuru Village, Davanagere Taluk, Davanagere District
code279 Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff2.5 sqmm to 25 sqmm 0.10 Km
Electrical Installation work for proposed construction of Administrative Building and SITC of three glow sign boards at three entry points at Plasto Steel Park(PSP), Barjora in the district of Bankura.
... the hard metal road for laying the cable in underground trench by drill machine ...
PROVISION OF POWER SUPPLY FOR CHARGING STATION OF ELECTRICAL VEHICLES AT VSN NAGPUR
Supply, laying & testing cable XLPE insulated, screened, ...
PROVISION OF WALL WITH GRANITE AT THE ENTRANCE OF GATE AT 402 LT AD BTY COMP AND SPECIAL REPAIRS REPLACEMENT OF OLD DETERIORATED DBS AND POINT WIRING WITH CONNECTED ITEMS AT ARMY AD CENTRE UNDER GE I GOS
Taking up/down old unsv underground cable from existing locations and supply, laying and testing cable XLPE insulated,screened,PVC ...
Providing and fixing of 12.5 mtr High Mast 9 Mtr long Mini High mast at ward No-3 under limit of Municipal Corporation Gurugram.
... accessories for road crossing for laying of cables..
8716/E8- PROVN OF 08 NOS GARDEN LIGHT AND ALLIED WORKS FOR AOC RESIDENCE AT VAYU VIHAR BROOKSHABAD UNDER AGE E/M-II OF GE MINNIE BAY, SRI VIJAYA PURAM
Excavation in trenches not exc 1.5m in wide and not exc 1.5 m in depth and getting out in hard/dense soil for laying of cables all as specified and directed.
REPAIR AND MAINT OF LT EXTERNAL ELECTRICAL WORKS MCCBs WITH PANEL UG CABLE OF SECTOR A OF SHARIFABAD MIL STN UNDER AGE (I) CIF (K)
... in depth for foundation, laying of cables, erection of poles, stays ...
PROVN OF STORAGE ACCN IN ZONE-II AT JAIPUR FOR DAY TO DAY MAINT OF ALL UNITS UNDER AOR OF GE JAIPUR
... cohessive), 8 cm before laying cable and 15cm after laying and punned to 18cm after laying of cable complete all as specified ...
as per NIT
... for earth mat and 0.4m for laying of cable below fixed yard level and ...
Vadodara Division:- Improvement to Duty Bunk at Various Level Crossing under Jurisdiction of ADEN-ANND.
Laying of cable in trench
Replacement of damaged power cables of different size over SPJ Division.
... which will be required for laying of cable through it. The work shall ...
AMC of whole system at Environment Department 5th Floor ARDD Building Salt Lake Kolkata Repair and replacement of insulation of copper pipe line of existing VRF system and allied works
Laying of cable upto 3/4 core 25 sqmm on walVsurface incl. S & F MS saddles with earthing attachment in l0 SWG GI (Hot Dip) Wire, making holes etc. as necy. mending good damages and painting
Development of Koravi Layout Garden in Unkal village Hubli Tq
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staf
OHE modification and other allied work in connection with accomodation of 12 coach MEMU in Anand-Khambat section , rebuilding of bridge in Vadodara- Geratpur section , provision of ballast less track in platform 5 at Anand , converting Bayad station from D class to B class in Nadiad - Modasa section , provision of RUB in lieu of 5 LC in Anand-Khambat section and 07 RUB in Nadiad-Kapadvanj section and extension of platform no.1 at Anand.
7 07 Laying of cable: Details of work with schedule and Metre 500.00 25.00 12500.00
REPAIRING AND REPLACEMENT OF LIGHTING SYSTEM OF DIFFERENT UTTARAN AREAS IN WARD NO.43
... with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface ...
Withdrawal of B/D 4000GPM pump motor set from Jarlahi sump and installation of repaired 1000GPM pump motor set at Jarlahi sump of Phularitand, AMP Colliery.
Shifting & laying of cable for connection in starter and starter to motor (140 Mtr)
Fabrication and erection of a new glow sign board along with its mechanical structure and other allied works at Canal Road DPS under Kudghat Unit / S and D department.
... with Saddles / clamps.(a) Laying of cable upto 2 core 25 sqmm on wall/surface ...
Fabrication and erection of a new glow sign board along with its mechanical structure and other allied works at Keorapukur MPS under Kudghat Unit / S and D department.
... with Saddles / clamps.(a) Laying of cable upto 2 core 25 sqmm on wall/surface ...
Business Plan 2026-27 work at Baxipura and Kalpipara Sub Station under EDD-I, Bahraich
... standard depth and width for laying the cable are also attached (as per ...
Business Plan 2026-27 work at DPH Sub Station under EDD-I, Bahraich
... standard depth and width for laying the cable are also attached (as per ...
Business Plan 2026-27 work at CIVIL LINE Sub Station under EDD-I, Bahraich
... standard depth and width for laying the cable are also attached (as per ...
Urgent repairing work of damage compound lights at Bardhaman Division PWD Office Stack yard compound, Purba Bardhaman
Laying of cable as below, after cutting ...