Loading…
Loading…
16,935 results • Best match
CSW works for SCADA/HMI Integration of MOVs and Installation of Pressure Monitoring System for refinery headers at PPL, Paradip
Cable Laying - Laying of all type of ...
REPAIR REPLACEMENT OF EXTERNAL ELECTRIC SUPPLY INCLUDING UG CABLE LT PANEL BOARD STRUCTURES AND OTHER MISC WORKS ETC AT 257 SU AF MUKKUNIMALA SAC AFSC AND 340 TRU MUTTATHARA COMPLEX UNDER GE AF TRIVANDRUM
Excavation in trenches not exc 1.5m wide and not exc 1.5m in depth for laying UG cable not exc 1.5m in depth and getting out in hard/dense soil complete all as specified and directed
PROVN OF STANDBY POWER SUPPLY THROUGH 63 KVA DG SET FOR SERVER AND SIGNAL COMMUNICATION FACILITY AT HQ PUPSA, MEERUT CANTT UNDER GE (U) MEERUT CANTT
Supply, laying, jointing, testing and commissioning LT underground cables, 1100 volts grade, XLPE ...
SPECIAL REPAIR TO BLDG NO P 36/2 AND 3 COOK HOUSE AND DINING HALL AT RAIWALA MIL STN
... sand 80 mm thick before laying of cable and 150 mm thick after laying of cable in trenches complete all ...
Electrification Work at Suraj Kund Scheme Pushkar, Ajmer.
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable. (d) Lay the protective Common burnt ...
S&T work for Construction of Bridges and other associated works for Drainage improvement of TATA East Yard.
... nos. of labours for proper laying of cables into the bore. Cable shall... shall be made only after laying of the cables into DWC/HDPE/GI pipe.
Provision of balance signalling indoor and outdoor works in connection with Electronic interlocked station at Vashind station on HDN route of Mumbai division, where Kavach is sanctioned.
... Width as per Drg. No. SDO/Cable laying/ 007 (Annexure-10), as detailed... 'Guidelines on signalling cable laying'(Inspection Agency-Consignee) ...
S&T work for provision of shifting of Electronic Interlocking equipment from Khurja ASM old building to Khurja ASM new building.
Important: The laying of OFC cable independently or along with ...
Repairing and Renovation of Electrical Installation work at Ajodhya PHC under Bagmundih Block Purulia in the District of Purulia RN24002527 Project ID HF252639020S000
Laying of cable upto 2 core 25 sqmm on wall/surface ...
Repairing and Renovation of Electrical Installation work at Koreng PHC under Bagmundih Block Purulia in the District of Purulia RN24002525 Project ID HF252639027S000
Laying of cable upto 2 core 25 sqmm on wall/surface ...
Construction of New Sub station Katarari Deoria (2x5) with new 33 kv line and construction of new 04 no. 11 KV Feedrs
... bricks around and top of the cable or laying in cable trench and covering with ...
REPAIR MAINT INCLUDING REPLACEMENT OF DAMAGED WATER SUPPLY DISTRIBUTION OF GI PIPES AND CONNECTED ITEMS AT MH, REPAIR MAINT OF LT DISTRIBUTION NETWORKINCL REPLACEMENT OF US DAMAGED CONDUCTORS CABLES AND CONNECTED WORK AT NAMKUM AND KHOJATOLI AN
M & L for Sand cushioning trenches using fine sand to under ground cable, laid in two layers 15cm before laying the cable & 8cm after laying the cable complete all as specified and directed.
Strengthening of Power Supply distribution system with replacement of old and obsolete LT panel/Feeder pillar with other associated works at Old Delhi station.
... to IS:4984 or latest, for cable laying by trenchless Horizontal ...
MAINTENANCE AND REPAIRS/REPLACEMENT TO LT CABLES, ACBs MCCBs, EARTHINGS, APFC PANELS, LT FEEDER BOXES AND CONNECTED ACESSORIES AT NSTL TECHNICAL and RESIDENTIAL AREA UNDER AGE(I) RnD NSTL VISAKHAPATNAM
... road/ hard standing for laying cable through GI pipe and returning,... layers not exc 25cm after laying the cable complete including provision ...
SPL REPAIR TO BLDG NO. P-1141 AGAINST JOB NO 81 SA/BTD/SR(P-1141)-01/2024-25) UNDER GE NORTH BATHINDA AT BATHINDA MIL.STN.
... clean fine river sand for underground cable 8 cm before laying cable and 15 cm after laying and... and punned to 18 cm after laying of cable complete all as specified. ...
SITC of CCTV Camera System for Security purpose at malviya Nagar Ward No 151, Moti Park Moti Marg Bapu Nagar Malviya Nagar Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
SITC of CCTV Camera System for Security purpose at K-Block Mahveer Nagar Tonk road Malviya Nagar Word No 128 Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
SITC of CCTV Camera System for Security purpose at malviya Nagar Ward No.125, Gokul Vatika Malviya Nagar Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
octagonal pole and lighting work from railway phatak to Shiv mandir , purohit ji ki dhani sikar
... item no. 60.1 to 60.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
SITC of CCTV Camera System for Security purpose at malviya Nagar Malviya nagar Block-A Malviya Nagar Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
STREET LIGHT RATE CONTRACT (ARC)
... item no. 60.1 to 60.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
SITC of CCTV Camera System for Security purpose at Love Kush Nagar Tonk Road Malviya Nagar Word 145 Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
SITC of CCTV Camera System for Security purpose at S-Block Mahveer Nagar Tonk road Malviya Nagar Jaipur
... item no. 11.1 to 11.4 for Laying Charges for cable through Manual Boggi by... repairing the pit after laying of cable with PCC/ Bitumin as required.
Capital work of 220 kV S/S Edappon- Installation of 3 Nos. 20MVA 110/11kV Transformers-Phase II Works
... back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable).
Vadodara station: Electrical works in connection with providing one additional 6.0 meter wide FOB towards Ahmedabad end on deposit terms for NHSRCL - Vadodara.
Laying of cable in trench - The price shall... as site in-charge after laying of cable. Cables shall be supplied ...
Vadodara Division: Electrical works in connection with improvement to allied facilities of various existing Track Machine sidings over BRC Division.
... original position after laying of 24 cable in 50 mm HDPE pipe - The... refilling/ plastering after laying of cable in 50 mm diameter HDPE pipe ...
Vadodara Division: Electrical works in connection with improvement to allied facilities of various existing Track Machine sidings over BRC Division.
... original position after laying of 24 cable in 50 mm HDPE pipe - The... refilling/ plastering after laying of cable in 50 mm diameter HDPE pipe ...
125 H(F)(W)/2025-26
Laying of HDPE Pipe laying of 11KV, 3x70/3x/120/3x185Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying.
126 H(F)(W)/2025-26
Laying of HDPE Pipe laying of 11KV, 3x70/3x/120/3x185Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying.
Replacement of overaged AFTC with MSDAC in DN line between KRJ-CPYZ section of Prayagraj Division.
... as per RDSOsketch No. SDO/CABLE LAYING/003,issued vide RDSO document... per the RDSOdrawing no.SDO/Cable laying/008, issuedvide RDSO document ...
127 H(F)(W)/2025-26
Laying of HDPE Pipe laying of 11KV, 3x70/3x/120/3x185Sq.mm, XLPE Cable with HDD (trenchless) method including cable laying.
SPL REPAIR TO SEWAGE LINE IN SOUTHERN SECTOR AT MIL STN KOTA
... pier holes, etc. or for cable laying or not exceeding 10 sqm ...
53/EDCS/2026-27
CABLE LAYING BY Manual METHAD in trench (11 KV XLPE CABLE Provide by department )
Construction of New 33 KV Lines
33KV 3x300SQ.M.M XLPE Cable laying after Digging of trench of size (750x1050)mm with sand & Brick in open cut.
REPAIR/ REPLACEMENT AND MAINTENANCE OF HT SWITCHGEAR, VCB, RMU, LBS AND TRANSFORMER, CABLES, EARTHING AND OTHER CONNECTED ITEMS AT GANDHINAGAR MILITARY STATION
Supply and laying sand cushioning for cable protection in trenches 8 cm before laying cable and 15 cm deep over the cable all as specified and directed by Engr-in-charge.
Construction of New 33 KV Lines
33KV 3x300SQ.M.M XLPE Cable laying after Digging of trench of size (750x1050)mm with sand & Brick in open cut.
Reliability improvement of the power supply system of signalling gears and data logger servers in the Mumbai division.
... plan and refilling after cable laying. This work includes covering ...
Providing Borewell Flushing of Existing Borewell Pumpset Erection under CWSS to Old Jayamkondam Mpty
Supply and delivery of 50mm dia PVC Pipes for the encasing purpose of electrical cable laying works from borewell to Pump room etc complete as directed by TWAD Board officers.
ANNUAL PLAN PRO.NO.351/25-26CHALAKUDY MUNCIPALITY SWACHH BHARATH MISSION URBAN 20MCF RENNOVATION
OD537231/2025-2026:Supplying and fixing 3 H.P Submersible water pump with all accessories , fitting including wiring ,earthing. cable laying, over head works and line work etc. complete
Balance work for the Construction of Multistory Parking at Ramleela Ground Reckong Peo in District Kinnaur (HP) (SH- Providing and fixing WPC Decking board in sitting steps
... Pipe (Medium B-Class) For Cable laying & Fixing of light fixure ...
PROVN OF CERTAIN SANCTION WORKS OF WATER SUPPLY UNDER GE (AF) JAMNAGAR NO.2
... soft/loose soil for taking up/laying cable/pipe etc completed all as ...
Please Refer Tender document
... as per RDSO Sketch no SDO/CABLE LAYING /003 including marking of... and consolidation after laying of cables complete to the finished ...
REPAIR AND MAINT OF HT INSTALLATION AND CONNECTED WORKS UNDER GE JORHAT
Re-laying /Re-routing of HT underground cable aluminium conductor of size 95/120 sqmm 3 core in trenches / pole etc, all as specified and directed.
Provision of 3 phase supply to proposed 2x25 kV TSS at Badnera i.e. (A) Supply & erection of EHV equipments for proposed 3rd phase of TSS-I & II bay at 220 kV Badnera S/Stn under EHV O&M Division, Amravati. (B) Stringing of 3rd phase for existing 220 kV Badnera TSS - I & II line (C)Conversion of existing 2-phase to 3- phase of 132kV Akola-TSS DCDC line along with replacement of existing 132 kV TSS I & II Bay equipment's under jurisdiction of EHV Line Maint. Sub Division - II, Akola & 220 kV S/Stn Akola under EHV (O&M) Division, Akola & 400 kV R.S. Division, Akola respectively, in connection with Up-gradation of Electric Traction System from 1x25 kV to 2x25 kV Traction System in Bhusawal division of Central Railway to meet 3000 MT loading target.
central control cabinet, cable laying,
Provision of 3 phase supply to proposed 2x25 kV TSS at Badnera i.e. (A) Supply & erection of EHV equipments for proposed 3rd phase of TSS-I & II bay at 220 kV Badnera S/Stn under EHV O&M Division, Amravati. (B) Stringing of 3rd phase for existing 220 kV Badnera TSS - I & II line (C)Conversion of existing 2-phase to 3- phase of 132kV Akola-TSS DCDC line along with replacement of existing 132 kV TSS I & II Bay equipment's under jurisdiction of EHV Line Maint. Sub Division - II, Akola & 220 kV S/Stn Akola under EHV (O&M) Division, Akola & 400 kV R.S. Division, Akola respectively, in connection with Up-gradation of Electric Traction System from 1x25 kV to 2x25 kV Traction System in Bhusawal division of Central Railway to meet 3000 MT loading target.
central control cabinet, cable laying,
REPAIR MAINT OF STREET SECURITY LIGHTS PERIPHERY LIGHTS POST TOP LANTERNS HIGH MAST LIGHTS GARDEN LIGHTS AT NSBIII PANCHWATI 15 GR DCN PALAM TIGRIS 69 MED REGT 512 LT AD 972 TPT 261 ARTY BDE 8 ENGR SHO DHRUV MESS 3 JAK RIF ECHS
... of damaged unserviceable underground cable and Supply, laying or fixing or passing through ...
Vadodara Division: Electrical works in connection with construction of new 80-bed running room at New Makarpura station of DFCCIL.
... original position after laying of 29 cable in 50 mm diameter HDPE pipe... refilling/ plastering after laying of cable in 50 mm diameter HDPE pipe ...
Electrical Utility Shifting of 33/11 KV HT LT Line Ganesh Hotel Circle to Cement Factory (Rud Baba Circle) hote Hue Durga Mandir Tak Distt Sawai Madhopur
... item no. 11.1 to 11.4 for Laying Charges for cable through Vermeer machine... repairing the pit after laying of cable with PCC/ Bitumin as required.
Signaling work in connection with Extension of DN and UP loop lines by 75 each at Neral station and development of Goods shed at Khopoli station in North section of Mumbai division.
... specifications. This also includes laying & termination of cable, if any from panel Room ...
UPGRADATION AND BEAUTIFICATION WORK OF ROADS UNDER (CM GRID) SCHEME FROM BKD CHAURAHA-AYURVEDIC COLLEGE-GIRLS POLYTECHNIC-ATAL CHOWK (ANSAL COLONY) GANESH CHAURAHA ROAD, JHANSI, UTTAR PRADESH
HDPE Pipe For Laying of Underground cable