Loading…
Loading…
3,486 results • Recent activity
MTPS I Mill Plant Unit IV Coal flow system to boiler Rotating the existing eroded straight coal pipes of mills 4A 4B 4C 4D 4E 4F for 180 rotation at 16 meter level above the mill and below the 18 meter floor and Dismantling rectification
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Maintenance of Burners and replacement of worn out fasteners at cover plates
MTPS I CA CWS I Overhauling of 1600 mm BFV including actuator GB overhauling checking and renewal of Nitrile rubber seal painting of Intake screen of Cooling water Pumps 1A 1B and 1C and allied works
MTPS I CA CWS I Renewal of the existing damaged PVC fills with new fills rearranging the hanging fills along with SS GRP grid in Cooling Tower I during AOH 2025 2026 of Unit I
MTPS I Mill Plant Unit IV Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc in mill 4A to 4F during AOH 2025 26
MTPS I CA CWS I Fabrication of Stop Log gate 2 Nos to provide in outlet canal of Unit I Cooling tower