Loading…
Loading…
4,014 results • Latest
MTPSI ES Circle CI FSSS 3 4 Annual overhauling of Retractor Assembly of HEA Ignitors, Flame scanners, Pr. Gauges and switches, DP switches, Temp gauges and switches, transmitters, SADC positioners, HAG solenoid valves etc in Unit-IV for the year 2
MTPS-I ES Circle EMII SD-III Cleaning of ESP Unit-IV High voltage rectifier Transformers, scrapping , cleaning and painting of Kninfe chambers, support insulator chambers, Negative bushing chamber after providing Rubber beading in the Knife chamber d
MTPS-I ES Circle EM-II SD-II Complete overhauling of 4 Nos 75 KW capacity, 3 phase , 415V 1440 RPM - LT motors, complete painting of 6 Nos 75KW LT motors replacing of all the corroded CT fan motor local start stop push button box and its support s
MTPS-I ES Circle EMI Unit-IV Complete overhaul of 1 No 3500 KW 6.6KV HT motor BFP -4C Sl.No 40921-T-421-01-01 during AOH 2025 26
ROLL DRIVE II INTER Z MILL (FORGED)
MTPS-I ES Circle EM-I Unit IV Annual maintenance works of critical LT modules and LT breakers in USSG-4A and 4B, SSSG-4, N E-4, BMCC-4A and 4B, VMCC-4A and 4B and SBMCC-4 LT buses during the AOH-2025-2026 in Unit IV
Supply of Consumables for Pennwalt Sharples Super Centrifuge Model AS 26 V as per the specification 10 items
Supply of Spares for KG Khosala Make Air Compressor Model 2HA2QT Tube Nest for Inter and After Cooler 2 items as per the specification
Manufacture and Supply of Flash Tank I with steam collectors for 210 MW LMW Design Turbine as per drawing 1 No
MTPS-I ES Circle EM-I Unit-IV Complete overhaul of 5 Nos Various Capacity of LT Critical motors and bearing replacment work in spare HDP Motor and Barring gear motor during Unit IV AOH 2025-26
Supply of Food Plant Operations Laboratory Equipment for B.Tech - Food Technology and Dairy Technology
Supply of Dairy Chemisty Laboratory Equipment for B.Tech - Food Technology and Dairy Technology
Supply of Dairy Engineering and Technology Laboratory Equipment for B.Tech - Food Technology and Dairy Technology
Works Contract for Disconnection, Removal, Unloading & Loading, Fixing and connection of equipment's (J1, J2, CTF1, Servomotors of CTF 2, 3, Line contactors, shunting contactors, C145 & Cab Fans) of electric locomotive available at Electric Loco Shed, Southern Railway, Salem Division, Erode.
Works Contract for Trench Plate opening and blowing of trenches, HT compartments/Machine Room and Cabs, closing the trench plate and unloading and loading of batteries, SL Covers, Smoothing Reactors etc. in electric locomotive available at Electric Loco Shed, Southern Railway, Salem Division, Erode.
Renewal B.T road from Vaikuntham B.T Road to Koothadipalayam via Kundalpatti road Km 0/0-1/700H/o Erumaipatti Panchayatat Konganapuram Block at Salem District RRMS-2025-26 work No.01
MTPS I - Civil Circle Up keeping of the residential quarters of MTPS I in Thermal Nagar 1 to 10 by periodical cleaning of Man Holes, Inspection Chambers and up keeping of in the residential quarters area in Thermal Nagar 4 and 5 by providing water
MTPS I - Civil Circle Up keeping of Drains by removal of ash deposits, silt and other waste materials from the drain adjacent to the power house building on the southern side and along the 58S road leading from Unit IV to canteen and from inside
HRM-MOTOR AC SQ-415V-30KW/225SM-6P-B3001, HRM- MOTOR AC-SQ-415V-90KW/315SM-6P-B3001
MTPS I - Civil Circle Upkeeping of the residential quarters in Thermal Nagar 11 by periodical cleaning of Drains, Man holes, Inspection Chambers and Sewer lines for the period of one year from the date of commencement
MTPS I - Civil Circle Up keeping of the service building and power house building by cleaning of Toilets, sweeping and cleaning of floor and staircases of Unit I, II and III (0.00mtr to 13.50mtr) of power house building and mopping of all floors
attending leak works in ward 18 to 33 in attur municipality
attending leak works in ward 1 to 17 in attur municipality
MTPS I ES Circle MRT Division Provision of 1 No TATA SUMO or equivalent Diesel driven of seating capacity 8 1 including driver on hire basis for the official use of EEMRTMTPS-I for a period of one year from the date of execution of agreement.
MTPS-I ES Circle EM-II SD-I Releasing of Fan cover and Fan for grease hose inspection and refixing of fan and Fan cover after cleaning the existing PA, FD and Coal Mill motors works during Unit-I, II,III IV AOH COH 2026-27
MTPS-I ES Circle EM-I Unit I-Rewinding of one number 5.5KW,3 Phase, 50Hz,415V,NGEF make-released from OLCTCS-1B bed.
Supply of Food Preservation Laboratory Equipment for B.Tech - Food Technology and Dairy Technology
MTPS-I ES Circle EM-I SD IV Cleaning , complete overhaul and checking of IR value of all the 9 Nos LT buses during the capital overhaul of Unit-IV in 2026
Supply of Advanced Food Processing Laboratory Equipment for B.Tech - Food Technology and Dairy Technology
MTPS-I ES Circle EM-IUnit-IV Scrapping ,Cleaning and painting of Turbo Generator casing ,H2 CO2 gas pipe lines, Seal oil lines ,Expansion Tank, Damper Tank,Reserve Tank, SWC 4A 4B, Polishing Unit, Hydraulic seal Tank and all the pipe lines leading t
Supply of Food Process Engineering Laboratory Equipment for School of Food Technology and School of Dairy Technology
MTPS-I ES Circle EM-I SD-I Complete overhauling of 17 Nos. various capacities of LT critical motors during the Annual overhaul of Unit-I
MTPS-I ES Circle EM-1 DM plant Annual Maintenance ,checking of IR Value of 4 nos LT buses,cleaning of its modules in DM plant stage -I II durng the year 2026.
ENERGY EFFICIENT BLDC CEILING FAN
MTPS-I ES Circle EM-I UnitIV Dismantling and Reassembling of HTLT Terminal links of Generator Transformer-IV, UAT 4A UAT 4B for conducting statutory testing of TG GT-IV and and attending oil leak in PRV Bottom gasket in GT IV during capital overha
Supply of Mother board with processor _ 15 Nos LED Monitor _ 10 Nos and RAM - 10 Nos
MTPS-I ES Circle EM-I Rectification of lighting circuit wiring from LP boxes to Light fitting Plug Socket point Replacement of existing damaged phase, neutral, earth leads, worn out Junction boxes and fixing and satisfactory commissioning of RCCB
MTPS-I ES Circle EM-I RWPH Annual maintenance, complete cleaning, tightness checking of horizontal, vertical bus bars, Bus bar Joints, OG terminals and checking IR value of RWPH HT buses C1 C2 during the year 2026.
MTPS I Mill Plant Unit I Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2025 26
MTPS-I ES Circle EM-I Complete cleaning ,Tighness Checking of horizontal,vertical bus bars,Bus-bar joints, O G terminals and checking IR value of HT buses US 4A 4B and its Bus ducts the COH-2026-27 in Unit IV
MTPS I Mill Plant AC Plant Unit III AOH 2025 26 Air Washer System Epoxy painting of blowers and its auxiliaries enamel painting of AWCW Pumps pipe lines Spray nozzles flushing works Overhauling the Blower 3A 3B Damper box AWCW Pumps and gate valves
MTPS I Mill Plant AC Plant AC Cooling tower stage I II sump tank overflow water drain line laying rerouting to Bottom Ash Hopper Unit I trench for Zero discharge of A Zone area and providing an accessories of water level indicator for Sump tanks
MTPSI ES Circle EM-I Unit IV Complete overhaul of 1 no.3500 KW, 6.6 KV HT Motor BFP-4B Sl.no.40921T421 01 06 during COH 2026 27.
MTPS I Mill Plant Unit I Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 1A to 1F and Dismantling of seal air fan motor and overhauling reassembling setting the alignment
MTPS I TM I Unit III Inspection and Overhauling of Oil Vapour Extraction Fan assembly and SOC Coolers during 2025 26
MTPS-I ES Circle EMI SD-IV-DM Plant -Rewinding of 1 No. Crompton Greaves make,3 Phase,415V,11 KW Effluent water transfer pump motor No.1Sl.no.ADH 27681DV in DM plant stageII
Fabrication and Supply of Cooling Tower ID Fan gearbox base frame channel base plate and its auxiliaries in Cooling Tower StageII
MTPS I TM Unit IV Complete overhauling and painting of Instrument Air Compressors IAC 4A 4B 4C
MTPS I TM Stage I II Units I II III IV BFPs BFBPs CEPs Voith Hydraulic Couplings and HDPs Preventive Break down Maintenance for a Period of one year from the date of commencement of Work
MTPS-I ES Circle EM I SD I Complete overhauling of Indo Tech make , 2000KVA 6.6 KV 433V UST 1 A Sl.no 8311 UST 1B SL.No 8313 and crompton greaves ltd make 2MVA 6.6KVA 433V of station service Transformer-I Sl.No 34943VF at Unit I transformer Yar