Loading…
Loading…
4,014 results • Latest
MTPS I Mill Plant AC Plant Unit I AOH 2025 26 Air Washer System Epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows W type eliminator chemical cleaning Overhauling the AWCW Pumps
MTPSI TM Unit I Overhauling of TLOCBPs H2CBPs Hydrazine Dozing Pumps Phosphate Dozing Pumps and Heater drip Pumps during AOH of 2025 26
MTPS I TM UNIT I Complete Overhauling of HP Bypass LP Bypass Spray Valves Oil Supply Unit during AOH 2025 2026
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS RHS of condenser tubes in Unit I condenser during AOH of 2025 26
MTPS I TM Unit I Removal and Reinsulation of HP IP control Valve area Spindle leak off lines Gland steam pipes of LP front rear in Main Turbine during Annual Maintenance work 2025 26
MTPS I CHP I Removing wornout damaged rails dismantling the PSC concrete sleepers with fittings removing coal powder on the track line providing bed PCC mix WT V inhaul
MTPSI TM UNIT I Renewal of piston seal piston rod packing in HP LP Bypass Valves and its Spray valves Actuators including servicing of Oil filters during AOH of 2025 26
MTPS TM Unit I Removal of insulation and providing re insulation to pipe Lines valves Deaerator main flange Gland steam cooler Low pressure heater Flash tanks and its accessories and disposal of waste insulation materials during Unit I Annual overhau
MTPS I Mill Plant Unit I Fabrication of Vertical shaft lock Nuts and keys for XRP 803 coal mills
MTPS I CHPI Deep screening through packing Lifting the Track line ballast deficiency makeup work with 40mm hard broken stone ballast check rails at Wagon Tippler IV inhaul etc
Demolition of Dilapidated 96 TNGRHS (12-A type, 36 -B type, 36-C type and 12 -D type) flats at Collector Bungalow Compound in Salem District .
MTPS I TM I Unit I Annual Maintenance work in Main Turbine and its Auxiliaries during 2025 26
MTPS I CHP I Replacement of wornout Tongue rails Stock rails CMS crossings Check rails and PSC sleepers with fitting related and deep screening through packing of point crossings No 50 Power point 100 and 103
MTPS I M II Circle OAHS Retrieving the accumulated ash over and under the 08 Nos ash slurry pipe streams and removing piled ash on both sides of the ash slurry pipeline streams from B4 to UAD area
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) (3 (3 ))
MTPSI Mill Plant I Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc and Releasing the journal spring assy
MTPI Supply of 1 No diesel Petrol driven Tata Indica Tata Indigo or equivalent car on hire basis for the official use of SE M II
MTPS I TM Unit I Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 3 4 GC 1 Ejector 1A gasket renewing of Feed water tank connected lines flanges
MTPS I TM I Unit I Dismantling Inspection and Overhauling of Alfa Laval Centrifuges 1A 1B during AOH 2025 26
MTPS1 TM Stage II Unit III IV Overhauling and Load testing of 2 ton capacity EOT crane movable 1 ton chain block trolleys and 1 TON Capacity Electrical Hoists in pumps Compressor and LP Bypass valves area for the year 2025 2026
MTPS I TM Revisioning of gearboxes in Auxiliary hoist Cross Travel Long Travel and attending the defects in the Control Panels Resistance Boxes of 2 Nos.125 30 Tonnes Station EOT Cranes during 2024 2025
MTPS I TM UNIT III Complete Overhauling of HP Bypass and LP Bypass Spray Valves Oil Supply Unit during 2025 2026
MTPS I MM CI Procurement of HEA IGNITOR Spares 3 Items
MTPS I TM UNIT III Renewal of piston seal and piston rod packing in HP LP Bypass Valves and its Spray valves Actuators including servicing of Oil filters during 2025 26
Supply of 150NB Carbon steel Seamless pipe
MTPS I TM Unit III Transporting Lifting and reassembling of Vent condenser tube nest modification of 4 syphon line into 6 syphon line and providing 6 flanges in vent condenser by pass line during Unit III 2025 26
MTPS I TM Carrying out Bullet cleaning by specially designed Phosphor Bronze Bullet shot of LHS RHS of condenser tubes in Unit III condenser during 2025 26
supply of MS Chequered plate 6 mm Thickness 10 MT and MS plain plate 6 mm Thickness 12 MT
Job contract for providing Security Services in the Periyar University,Salem
DISC ASBESTOS (LONG FIBRE)
Servicing of ELGI make TRC1000 MN, TRC1000 MNUG, compressors of electric locomotives available at Electric Loco Shed, Southern Railway, Salem Division, Erode.
COMPRESSOR ZR19M3-TWD-551 FR AC-SPM
Ferro Nickel
DC DRIVE CONTROLLER FOR LENZE MOTOR
CUTTING NOZZLE PB0400N-PM-O6-TCM
MTPS I TM Unit III Overhauling and gasket renewing of Valves in Feed Water Main Condensate Heater drain drain water and Auxiliary Steam during the year 2025
Boiler Suits -Jacket-Sl. No. 1 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 1 in Annexure-1 of SOW, Boiler Suits - Jacket-Sl. No. 2 in Annexure-1 of SOW, Boiler Suits -Trouser- Sl. No. 2 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 3 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 3 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 4 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 4 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 5 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 5 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 6 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 6 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 7 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 7 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 8 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 8 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 9 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 9 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 10 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 10 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 11 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 11 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 12 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 12 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 13 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 13 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 14 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 14 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 15 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 15 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 16 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 16 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 17 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 17 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 18 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 18 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 19 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 19 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 20 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 20 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 21 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 21 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 22 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 22 in Annexure-1 of SOW, Boiler Suits -Jacket-Sl. No. 23 in Annexure-1 of SOW, Boiler Suits -Trouser-Sl. No. 23 in Annexure-1 of SOW
MTPS I TM I Unit III Overhauling of Control valve columns cam shaft arrangements of HPCV and IPCV Replacement of sheared HPCV 3 renewal of spindle leak off pipe lines of IPCV 3 and 4 cleaning of MOT tank and other related works during 2025 26
supply of manpower for the production and packing of khoa, sweets and karam
MTPS I TM Unit III Cleaning Hydraulic Testing of Lub oil Coolers Working oil coolers Dismantling cleaning and assembling of Suction Strainers of BFPs CEPs Renewal of BFP leak off line and suction discharge flange Gaskets etc
supply of HP Control valve stem with Nut suitable for 210 MW LMW Design Turbine 8 Nos as per specification
Supply of Various sizes of soft iron sealing rings for valves 7 Items as per specification
Sealing Rings for 210 MW LMW Design Turbine 23 items as per the specification
Supply of Manpower for Packing of Ghee in jars, 15kg ghee tin packing,20kg butter packing, BUtter melting for ghee and reconstitution,retail packing of butter, curd, buttermilk and flavoured milk packing and paneer prepration and packing For 2 years
MTPS I TM Unit III Overhauling and renewal of worn out spares and Bearings and commissioning of Heater Drip Pump 3A and 3B during 2025 26
Distribution Transformer, 3 Phase, Up to and including 200 KVA (Q3) (3 (3 ))
NOZZLE ASSY OF WESMAN 6514-7-BURNER, BLOCK FOR BURNER ASSY WESMAN 6514-7
Monthly Basis Cab & Taxi Hiring Services - SUV; 5000 KM X 300HRS; Outstation
REFRACTORY MANAGEMENT OF TUNDISH-COST/HEAT (S&A)