Restoration of flexible pavement at Km 106.60 and Construction of Slope Protection work by Reinforced Earth Structure at 3 locations (i.e. Km 68.80, Km 71.50 and Km 71.55), in the UT of A N Islands on Item Rate basis in FY 2021-22 - 2nd Call
Loading…