Loading…
Loading…
8,549 results • Latest
CONSTRUCTION OF MULTI STORYED PARKING AT BAHU FORT GORKHA NAGAR WARD NO 48.
Provn of wing wall connecting from Gurudwara to B Mess area and Addn/Altn to Gate, Sentry Post alongwith boundary wall with allied other works near P-2 of CH (NC) under GE (Utilities) Udhampur
REPAIR OF BLDG NO P 240 MD ACCN AT KR VIHAR AT RATNUCHAK MIL STN UNDER GE KALUCAHK .
Provn of pathway and security lights alongwith the perimeter security wall at HQ Northern Comd under GE (Utilities) Udhampur
REPAIR MAINT OF LT PANELS, UPS STABILIZERS, OH ELECTRIC LINES, POLES PAINTING, INSULATORS, TREE TRIMMING ETC UNDER AGE E/M OF GE SATWARI
Provn of standby DG sets alongwith connected accessories for security near Sub Area Officer Mess and connected area under GE (Utilities) Udhampur
SPL REPAIR TO BLDG NO T-260 AT DRUGMULLA AND PROVN ANE POST AT LOWER BRAUB UNDER THE AOR OF GE 874 EWS.
SPL REPAIR FOR CONVERSION OF HT OH LINE INTO AB CABLES, AND CONNECTED ITEMS OF BANA ENCLAVE AND DIGIANA AND HT OH TO UNDER GROUND CABLE OF ASC PL AT BD BARI MIL STN UNDER GE KALUCHAK
REPAIR MAINTENANCE AND COMPRENHENSIVE MAINT OF HT BREAKER AND MISC ITEMS AT KALUCHAK MIL STN UNDER GE KALUCHAK
Electrical Works in c/w Provision of 07 Nos. Lifts at various stations in JAT division under ABSS and Electrical Execution Works including Upgradation of Power Supply of 4 nos escalators at MCTM Railway Station in JAT Division under ABSS.
Creation of 250KVA 100KVA Substations at transit accommodation for Kashmiri Migrant at Zewan
NIT 21 of 2026-27 Civil Repairs
Construction of Lane NHO Krishan Lal at w no 3, Pyt. Mawa Brahmana, Block Bhalwal Brahamana, under CD Pyt scheme for the year 2026-27.
Filling and Tile work at House of Babbu Ram to Meshu Bhagat at w.no 1. Pyt. C.K.Pur Block Bhalwal Brahmana under Scheme CD PYT. for the year 2026-27
NIT 21 of 2026-27 Civil Repairs
Executive Engineer JS PHE QCPD HMT SRINAGAR
Constt of Drain Siteryala NHO Ram lal and others W.no.9 Pyt Bandwal Block Bhalwal Brahmana, Distt.- Jammu Under CD-PYT for the year of 2026-27.
BALANCE WORK FOR CONSTRUCTION and MAINTENANCE OF ROAD FROM NEOCH TO SHIBRAS PACKAGE- JK14-211, STAGE- IandII COMBINE, PHASE- IX, BLOCK MAHORE, DISTRICT REASI, LENGTH-15.000 KMS
BALANCE WORK FOR CONSTRUCTION OF ROAD FROM L033- TULI TO PHAGOLI PKG NO JK14-563, JK14-564-40 MTR span through type steel bridge and JK14-645
Permanent restoration work of roads Sarthali Upper to Trapper and T01 to Balzedi, District Kathua
Mechanical repair works and replacement of old damaged bearing housing of Pumping Unit No. 03 at Lift Irrigation Scheme Marval Stage 4th.
Augmentation of 100KVA to 200KVA substation near sub centre Sebdan along with improvement of LT network near the house of Arshid Ahmad and Syed Firdous Ahmad under the jurisdiction of Electric Division Budgam KPDCL.
Balance work for Construction of PHC Building at Sangerwan (Ist Story)
Const. of residential accommodation for Revenue Office at Karnah
Constt of Drain at Wno2 Bheri Taryai Pyt Bheri Taryai Block Bhalwal Brahmana, Distt. - Jammu Under CD-PYT for the year of 2026-27.
Plantation/Gap Filling in Various Units of Catchment Area under Watershed Management Division of J andK LCMA
Licensing, Operation, Maintenance and Management of Sanjeevani Bhawan on as is where is and leave and license basis for a period of Five years.
Restoration of shade house at KVK Gwari, Bhaderwah, Distt. Doda
Reconstruction of parking at Main Campus, Chatha
Abbreviated eNIT for Supply, Installation, Testing and Commissioning of Automated Chemiluminescence Analyzer on Reagent Rental Basis for the Department of Microbiology and Blood Bank, SKIMS MCH Bemina
Design, Supply, Installation, Testing and Commissioning of Mechanical Equipment for Modern Slaughterhouse, at Gagadanji, Qazigund
Crate Protection work at different spots of various tributaries of River Jhelum (Boniyar-Uri Reach) Viz, Bugna Nallah, Reshawari Nilnag Nallah, Dara Gutliyan Nallah, Hapathkhai Boniyar Nallah, Salamabad Dachna Nallah, Limber Nallah and Choolan Kalsan
Construction of Record keeping rooms on the 1st floor of Administrative building at Main Campus, Chatha (Adjacent to Director Research Room)
MAINT OF EXTERNAL LT ELECTRIC SUPPLY NETWORK IN AKHNOOR MIL STN UNDER GE (S) AKHNOOR.
Replacement of damaged floor, fixing of PVC wall paneling, granite, plaster and other civil and finishing works etc. in the Ex Situ Gene Bank of Institute of Biotechnology at Main Campus, Chatha
Flood Protection work by way of construction of crate protection work on Nowpora Salamabad Nallah near Irrigation Flume (Uri reach).
Construction and Upgradation of Irrigation Khuls in Tehsil Uri
Construction of Double Circuit 132 kV Pampore Khrew Transmission Line
Development of Green Space at different spots of River Jehlum and Sherbagh Stream within the limits of MC Anantnag
GE/BAS-52/2026-27 Special repair to roof of building No P-88, 80, 66 and 75 (OTM Accn) at Madhopur under GE Basoli
De sludging/cleaning of the existing drains in the Research Farm at Main Campus, Chatha
Reconstruction of play field by way of repairs to the damaged stands, water supply and playing pitches at FVSc and AH Campus, R.S. Pura
Laying and fitting of pipes for providing water supply to newly established security instalment at Kongwattan under Regular District Capex 2026-27 Regular Sector (PHE)