Loading…
Loading…
801 live341 closing this weekmost from Public Works Department and Public Works Department (PWD)
801 results • Best match
Reconstruction of Existing ROB No. 108-A at Km 43/11-12 between Malerkotla and Kup Railway Stations on Ludhiana-Dhuri- Jakhal Section for Movement of Double Stack Containers
Bengaluru City-Jolarpettai-- Section: Instrumentation of cable stayed bridge (ROB No 832A) 1x45m+1x135m at Km 341/800-342/000 between Krishnarajapuram- Whitefield stations. Maintenance period is 3 months.
Maintenance and Payment of Electrical Consumption charges of Street Lighting on PWD North West Roads under NWED. (SH Providing Services of Lift Operator and Security Guard at Saraswati Vihar and Prashant Vihar FOB).
Re-development and renovation of Agartala station - provision of 12 m FOB with Lift, Escalator, station building and improvement to circulating area in connection with development of Agartala Station (phase-1) (Electric portion).
(1) Painting work of FOB, IRS PF Shelter, Water Tank Stagging, Small Shed and other structure steel with the required repair work of Profile Sheet wind lie, Protection screen and valley Gutter/ridge under the jurisdiction of Sr.ADEN/Dongargarh (DGG). ... of FOB , ...
Construction of bridge across Gangavali River at Ch. 0.00 Km of Gullapura - Kodlagadde Major District Road connecting Gullapura village to Heggar village in Yellapur Taluk, Uttara Kannada District.
CONSTRUCTION OF BRIDGE OVER KALJANI ON T04 FROM GOROM BRIDGE AT BANCHUKAMARI TO TAPSIKHATA BAZAR VIA TAPSIKHATA G.P OFFICE AND TAPSIKHATA KALJANI GHAT ROAD OF ALIPURDUAR DISTRICT. PKG.WB2196
Open e-tender for the work of Re-girdering of steel girder of major Bridge No.19 DN line of span (3x18.3)m at km 281/2-23, between stations Gour Malda - Jamirghata in the section Malda - New Farakka of Malda Division in the jurisdiction of Assistant Engineer/ BRL/ Eastern Railway/ Malda.
Formation of approaches and balance bridge work to the HLB across Sarada river at Km 0/10 near Kaligotla village of Vechalam - Khandivaram road in Visakhapatnam District
Technical Specifications The vessel GTV SAMUDRA SARVEKSHAK requires procuring of SAFE-273 Oil as per INDENT G-04-141 and supply of above mentioned Material/Service AT ONGC BASE NHAVA, IMR SHED No.11/PNV/ANCHORAGE,MUMBAI /MBPT, MUMBAI.
Construction of RUB in lieu of LC No. 28/C, 36/C and LC No. 31C on Phaphamau- Unchahar Section of Lucknow Division on Northern Railway under DyCE/C-V/LKO
Provision of Twin Box RUB/LHS at Minor Br. No. 778 at KM. 1068/35-37 in UTR-LKO section of SSE/W/LKO under ADEN-I-LKO (Near Pipraghat Bridge)
Sahu Bridge over Sahu river at ch. 6.10km on on Gondermore to Sahudangi Goramore approach side abutment protection work under Jalpaiguri Highway Division in the dist. of Jalpaiguri during the year 2026-27
Fatapukur to Gadra road at chainage 3.80km Karatowa Bridge Abutment Protection and river training works under Jalpaiguri Highway Division during the year 2026-27
GUNA-GWL: Part A)- Provisional of Additional Openings at LHS-81 (5.00 X 2.70 m) and LHS-56 (5.00 X 2.70 m) as RUB by pushing method (Using RH Girder), LHS- 116 (5.00 x 2.70 m) and LHS-03 (5.00 X 2.70 m) as RUB by Cut Cover method. Part B) Provision of Additional opening as water-way Bridge at km 1263/21-23 by Pushing Technique (Using RH Girder).
Re-Construction of Damaged Bridges at Km. 177.473, Km. 182.126, Km.186.754 and Km. 187.448 of Anoop shahar Branch Canal Under Aligarh Division Ganga Canal, Aligarh
Road restoration work for damaged surface due to cutting done by North Dum Dum Municipality at Western side Service road of Birati ROB on Madhusudan Banerjee Road under Kolkata North Division PWDte during the year 2026 2027
1) Proposed 1x3.0x2.75m RCC Pre-cast Box Pedestrian Subway in addition to ROB in lieu of exg LC No.137 at km 457/300-400 by air pushing method between Vanjipalaiyam and Somanur Stations. 2) Proposed 1x3.0x2.75m RCC Pre-cast box Pedestrian Subway in ... to ROB in ... pro. ROB in ...
(i) S&T Work: Utility shifting of LC Gate No. 01 between DBG-MHP and LC No. 28 between DBG-KKHT in connection with the work " Construction of ROB at LC No.- 01 between Darbhanga-Muhamadpur and LC No. 28 between Darbhanga- Kakarghati, (ii) S&T Work: ... of ROB at ... of ROB at ...
ADEN/HQ/II/JP sub division :-Repairs to misc . bridge work like Bridge tablet ,Water way cleaning, .Painting ,DL/HFL /Flood gauge ,painting and Making & Repair of stairs.
Associate Signaling work for provision of RUB/LHS in Lieu of Level Crossing No. EB- 12 at KM 13/9-10 in between EKI-BLGT under the jurisdiction of SSE/Works/OMLF
CONSTRUCTION OF BRIDGE ACROSS NETHRAVATHI RIVER FOR CONNECTING SAJIPANADU AND TUMBE VILLAGE IN BANTWAL TALUK, DAKSHINA KANNADA DISTRICT. (DESIGN, CONSTRUCTION & MAINTANANCE OF BRIDGE AND APPROACH ROAD WORK ON TURNKEY BASIS)
Conducting a UAV (Drone) based visual inspection and Terrestrial LiDAR based inspection of various bridges over Mumbai Pune and Solapur division under jurisdiction of AXEN(Str) Byculla.
Conducting a UAV (Drone) based visual inspection and Terrestrial LiDAR based inspection of various bridges over Bhusawal and Nagpur division under jurisdiction of AXEN(W/Br) Bhusawal.
Improvement of structural life Composite ROBs and TGBs by Metallising and Conventional painting over various sections (DW-PNVL ,MNKD-PNVL, KYN-LNL) of Mumbai division. (8 Bridges)
Preparation of Detailed Feasibility Report (DFR) and Transaction Advisory (TA) Services for Development of Foot Over Bridges (FOBs) at Madurai Corporation through Public Private Partnership (PPP) Mode
Request for Proposal (RFP) for providing Project consultant (PC) for providing "Comprehensive Consultancy services from the stage of Feasibility Study & DPR preparation for elimination of Level Crossing gates in NF Railway by constructing ROB and/ ... and/ RUB /LHS/Other ...
Request for Proposal (RFP) for providing Project consultant (PC) for providing "Comprehensive Consultancy services from the stage of Feasibility Study & DPR preparation for elimination of Level Crossing gates in NF Railway by constructing ROB and/ ... and/ RUB /LHS/Other ...
Modification of OHE due launching scheme for proposed ROB at Rly Km 317/29 - 318/01 in between station Goldenganj - Chhapra Gramin Junction and at Road Km 157+880 of NH - 19.
OHE modification work in connection with construction of ROB in lieu of level crossing gate No.69 at Km.92/41-42 in KSRA-IGP section of Mumbai Division of Central Railway
OHE modification work in connection with construction of ROB in lieu of level crossing gate No.34 at Km.130/7-8 in KYN-LNL section of Mumbai Division of Central Railway
Construction of RE Wall and Approach Road Both Side at 2 lane ROB in Lieu of L-Xing No 173 at Km 531/1-2 Bet Maghar-Khalilabad Station Distt.- Santkabir Nagar
25KV OHE Work in connection with Provision of passenger lifts connecting to FOB at ABKA, NDAE, KWAE, AZ,KGLE,HWH,DKAE,TAK,SNT,LLH,BDC,KQU,SALE,BOI,PDA & MYM over Howrah Division OF Eastern Railway.
25 KV Electrification work in connection with Provision of Ramp for FOB at various station of under jurisdiction of Sr.DEN-III/BSB (GYN, DLR, JKN, SDT, SRNT (total-05 station), BSB division of N. E. Railway.
GTL Div: Electrical Arrangements- 1.Raising of Platforms to High Level and Provision of New 3m FOB at LMD,TGL and JKO stations.2. Raising of Platforms to High Level at PDL, JUR and RLO Stations.
Provision of RUB in lieu of LC no. 13/B (Km 16.750), 37/C (Km 66.388) and 39/C (Km 69.197) on Ayodhya Cantt-Sultanpur-Chilbila Section of Lucknow Division on Northern Railway.
Provision of RUB/LHS in lieu of LC No. 55/C, 58/C, 57/C, and 59/C in the Maa Belha Devi Dham Pratapgarh Jn. - Phaphamau Section of Lucknow Division, Northern Railway.
Development of Link Connector Corridor between NH-19 and Varanasi Ring Road with Riverbank Connectivity along River Ganga for Decongestion of Varanasi City PKG2 from Km7.926-Km18.560 (TL 26.039Km MCW FOB Loop Ramp) in UP on HAM
Construction of ROB at LC 99 in Merta road Degana Section at Km. 519/9-8 and Merta road Mertacity Section at C1 IR Km. 1/0-1, District Nagaur. (BA 2026-27).
SR (Special Repair) work Providing safety railing on 2-lane ROB and its approaches in lieu of existing level crossing (LC No. C-61) at Km 165.550 on NH-89 in Nagaur City
Part A)-Guna-Gwalior section- Rehabilitation and improvement of bridges condition by repairing of RCC Slabs Pier/Abutments/Toe wall/wing wall/Return wall, inspection steps, flooring and bank pitching (Total 18 bridges) Bridges no 1098/2, 1101/1, 1116/1, 1118/1, 1143/1, 1152/1,1157/1, 1163/1, 1170/2, 1173/2, 1177/2, 1187/1, 1187/2, 1189/1, 1189/2, 1194/1, 1281/1, 1304/1. Part B)- Improvement to Approach road, Provision of sump well & Pump Room shed, Provision of Cross drain, Fixed barricading at various LHS in Guna-Gwalior section under ADEN/M/Shivpuri Section.
Repairing of CD, Shoulders various roads in Makhan Nagar section under Sub Dn. Narmadapuram. 1st Call, PAC Rs. 19.55 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
Collection of B.T. Patch repair material at Makhan Nagar under P.W.D. Sub Division, Narmadapuram. 1st Call, PAC Rs. 19.67 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 90 days i/c rainy season.
CONSTRUCTION OF BRIDGE OVER NAYA RIVER ON T01 FROM ALIPURDUAR FALAKATA ROAD NEAR TAPSHIKHATA BAZAR TO ALIPURDUAR FALAKATA ROAD AT BABURHAT MARKET NEAR UTTAR SONAPUR VIA MATHURA BAZAR AT ALIPURDUAR DISTRICT. PKG.WB2195
Estimate for shifting of 33KV Banjhinpali Filter plant feeder at Kaya ghat due to new Bridge construction under Raigarh Zone 2 of (O&M) Division-I Raigarh.
LNR - Provision of FOB with ramp at Lunirichha to eliminate deficiency in MEA and Thuria - Provision of FOB with ramp at Thuria to eliminate deficiency in MEA and KRLS - Provision of FOB with ramp at Kurlasi to eliminate deficiency in MEA and DKRA - ... of FOB with ...
S&T work in connection with provision of Ramp for FOB at KRND, MMA, SMZ, GYN, DLR, JKN, SDT & SRNT and Extension & Raising of platform for 24 Coaches at GYN, CC, GB, BTT & DHE stations of Varanasi division.
Engagement of Consultant for Providing Consultancy Services Including Survey, Detailed Investigations, Study, Soil Testing, Structural Design, Estimation, Preparation of Detailed Project Report for 10 no. bridges in Ramban Division
Improvement to various bridges by repairing of pitching, steps, protecting of piers, abutments, by scouring and other Misc. works in the jurisdiction of Sr. DEN/South of Jodhpur Division