Loading…
Loading…
2,186 results • Best match
Conducting pre survey for Reconstruction of minor bridge at Km 5/2-4 of CK road to meet Rudravaram (via) Yerragudidinne road in Nandyal District
Reconstructions of Minor Bridge with 3 Vents of 6.37 Mts Span at Km 114/10 of Machilipatnam-Nuzvid-Kallur road (SH-028) in NTR district
Reconstructions of Minor Bridge with 3 Vents of 6.37 Mts Span at Km 114/10 of Machilipatnam-Nuzvid-Kallur road (SH-028) in NTR district
Removal of wet Silt from Kankaragunta RUB to Medical Club in Div. No.26
Providing UGD rider pipe line East side of Madhura Nagar main road near RUB
[PH.No.44012] CHLORHEXIDINE 1.5% W/V + ETHYL ALCOHOL 70% HAND RUB 500 ML BOTT.
Supply of Quality Control equipments for R ad B Sub Division Proddatur North in YSR district under the main work of Construction of High level bridge across Penna River in Km 0000 to 1200 of Proddatur Rayalaseema Thermal Power Project RTPP road in YSR district
Shifting (by heightening) of 0.17kms of 11KV line and 1 No. DTR with connected material under 11KV Burjupalli feeder which obstructing construction activities of High level Bridge near Kuppamrajupalli(V) taken up by the R&B authorities under Turnkey basis in Operation Section, Chakrayapeta.
Providing damaged Road Safety Interventions to the existing Major Bridge at Km 9/0-2 of NH 44 to NH 44 (Via) Gooty Town limits in Anantapuramu District (MDR)
Development of Greenery & beautification of Eluru Canal bund from Madhura Nagar Foot bridge to Pappula Mill bridge (15th Finance Commission Grant Air Quality for the year 2021-22) 3rd Call
Development of Greenery & beautification of Eluru Canal bund from Madhura Nagar Foot bridge to Pappula Mill bridge (15th Finance Commission Grant Air Quality for the year 2021-22) 4th Call
Construction of Bus Shelter at Bapatla to Pedanandipadu ROB Opp in Ward No.26
Development of Eat Street and Sport Arena under Rayachoty ROB in Kadapa Municipal Corporation
Construction of Public Toilet at Bapatla to Paddananipadu ROB opp in Ward No.26
Development of Park under ROB at Chirdrens Park in 2nd Ward of Bapatla Municipality
Providing Central divider from Prakasham chowk to ROB along PP Road in Bhimavaram Municipality
Construction of bridge on road from Kotagunnala to Gosayugondi, Artanapalli village Chintapalli mandal.
Construction of Bridge and Bridge cum Regulator over PBC and Ubanda in Gollaprolu
Construction of Bridge across Gunderu Drain at Pollatithippa of Machilipatnam Mandal, Krishna District
Construction of Bridge at Surannagondi (v) in Chinturu (M) of East Godavari District.
Construction of bridge on road from Kotagunnala to Gosayugondi, Artanapalli village Chintapalli mandal.
Construction of bridge on road from Kotagunnala to Gosayugondi, Artanapalli village Chintapalli mandal.
RTPP - Stage IV - Extension of CC Diversion road from Sunnapurallapalli (Road under bridge) to Highway leading to Muddanur, YSR Dist.
Conducting Soil investigation sub soil exploration and soil testing for Reconstruction of Minor Bridge at Km 2/6 of Mantralayam to Nagaladinne road in Kurnool district
Conducting soil investigation sub-soil exploration and soil testing for reconstruction of minor bridge at 235/0 of Mypadu - Nellore - Bellary - Bombay road in Nandyal District
Emergent Repairs to weak and narrow Minor Bridge Across Local Vagu at km 0/2 of Kalangi (R&B) Road to Adaram road in Chittoor District.
Conducting soil investigation and sub-soil explration soil testing for reconstruction of minor bridge at Km 22/8-10 of Panyam - Banaganapally road in Nandyal District
Repairs Rehabilitation of Bridges and Culverts along SHAR to SULLURUPETA Road.
Strengthening of Steel foot bridges at Km 73 700 of RBLLC
Beatification of the Margine of Fly-Overs and Bridges in EUDA
Beatification of the Margine of Fly-Overs and Bridges in EUDA
Providing 9mtrs Octagonal poles Single armed lighting for newly constructed low level Submersible bridge across Hundri river near Anand theater in Kurnool Municipal Corporation, Kurnool.
Providing 9mtrs Octagonal poles Single armed lighting for newly constructed low level Submersible bridge across Hundri river near Anand theater in Kurnool Municipal Corporation, Kurnool.
Construction of Queue line from existing FOB to existing Luggage shed at ATC car parking at Tirumala
Construction of Queue line from existing FOB to existing Luggage shed at ATC car parking at Tirumala
Guntakal Division-Dharmavaram:-Provision of 6 no. of Escalators (Up & Down) for New 12m FOB. (Escalators Portion)
Presurvey estimate for conducting preliminary survey for minor bridges at Km. 64/8, Km. 66/6, Km. 67/2, 73/2, 74/8 & Km. 75/6 (total 6 No.s) for the work of "Widening & Strengthening the road from Km. 59/4 to 80/3 of Kadapa-Porumamilla road in YSR District under the main work Widening & Strengthening the road from Km. 59/4 to 80/3 of Kadapa-Porumamilla road in YSR District
Providing of NTR Ghat Pedastal Near RUB at Station Road in Narasaraopet Municipality.3rd call.
Providing temporary UGD rider pipe line East side of Madhura Nagar main road near RUB
Repairs to L Class bridges at Km.167/734 and repairs to and painting to foot bridges in between Km.151/000 to 168/000 of RB LLC.
Repairs to L Class bridges at Km.167/734 and repairs to and painting to foot bridges in between Km.151/000 to 168/000 of RB LLC.
Presurvey Estimate for Construction of High Level Bridge in Km 3/6-8 of Inner Ring Road (ARM-II) to Kuppam town Under the Main work of Improvements to Inner Ring Road (ARM-II) to Kuppam town from Km 2/4 to 4/8 in Chittoor District
Pre survey estimate for the work Construction of High Level Bridge across River Vamsadhara between Geddavanipeta village to Purushottapuram Village i.e LK Road in Narasannapeta Constituency to 11/0 of AB Road to 3/8 of AB Road via Purushottapuram road in Amadalavalasa Constituency in Srikakulam District
Shifting (by heightening) of 0.17km's of 11KV line and 1 No. DTR with connected materials under 11KV Burjupalli feeder which obstructing construction activities of High level Bridge towards Kuppam side near Kuppamrajupalli(V) taken up by the R&B authorities under Turnkey basis in Operation Section, Chakrayapeta.
Construction of 4 lane ROB at Renigunta in liu of LC NO.111 on NH 205 at Km 84/25-27 between Renigunta-TPT .Subwork:-Prov.RSI to ROB at Renigunta towards Renigunta side in CTR.
ENGINEERING PROCUREMENT AND CONSTRUCTION EPC OF BRIDGES
Improvements to Riding surface Allagadda- Ahobilam from km 15/0-10 including minor bridge (3V x 10m) at km 15/4-6 in Nandyal district(2nd call)
Conducting survey investigation designs and drawings for Construction of Minor bridge at Km 4.600 to 4.800 of Khajipeta to CK road Via Pushpagiri Temple in YSR district
Conducting Sub Soil Exploration Soil testing and Pre survey for Construction of Minor Bridge at Km 3/6.8 of Rayachoty Vempalli road to Kasthurirajugaripalli in YSR District
FDR to the existing road dam at Km 1/2 by providing reconstruction with Minor bridge 2 Vents x 6m of Uppalapadu Kaza road in Guntur District