Loading…
Loading…
2,187 results • Best match
Neeru Chettu Programme-Somasila Project-SFC-Strenghthening of canal banks duly providing lining of South Feeder Channel in between D/S side of Superpassage at Km.25.063 and Foot bridge at Chinthala atmakur village.
Neeru Chettu-Somasila Project-Strenthening of Canal banks duly providing lining in between down streem of foot bridge at Chinthala Atmakur Village and up stream of Acqueduct at Km.25.435 of South Feeder Channel.
Removal of silt and Nachu in selected reaches including painting to foot bridge, gauges & Hiring of machineries for removal of cross bunds, syphon points closing from Km.204/000 to 220/000 of RBLLC.
Replacement and restoration of damaged 900mm dia PSC water supply pumping main with DI pipe line near low bridge beside flower market foot bridge in Canal road in 37th division in Circle-I area
Neeru Chettu Programme-Somasila Project-SFC-Strenghthening of canal banks duly providing lining of South Feeder Channel in between D/S side of Superpassage at Km.25.063 and Foot bridge at Chinthala atmakur village.
Taking trial bores for construction of ROB in lieu of LC No 187 at Railway Km 263 Mts200 of Gudur Vijayawada Section and road at Km 0Km 400 Mts of ROB to meet Singarayakonda Pakala road in Prakasam District
Construction of ROB at Seethanagaram in lieu of LC No.204 at Railway Km 402/4-5 of Raipur -Vizianagaram Section at Km 92/6-8 of Chilakapalem-Ramabadrapuram -Rayagada road in Vizianagaram District. Sub work:Providing Lighting to ROB
Guntakal Division: OHE modification works in connection with the proposed construction of Road Over Bridge in lieu of manned LC 201 @km 508/7-8 in Kuppagal Yard and manned LC 207 @km 529/3-4 in Iranagallu Yard.
Raising of CONOCARPUS Plantation West side of the ROB from Reliance Smart to Ramanuja Circle at Tirupati
Providing CC Road Raising from Gopi General Stores to ROB at Vegetable Market area at Bapatla Municipality
Desilting of outfall drain from Excel Plant to Ajith Singh Nagar ROB along Railway Track.E11-116836/2018
Desilting of outfall drain from Excel Plant to Ajith Singh Nagar ROB along Railway Track.E11-116836/2018
Removal of Silt at Vijayawada Road West Side from ROB to Agathavarapadu Vagu in AE - VII Section.
Removal of Silt at Vijayawada Road East Side from ROB to Agathavarapadu Vagu in AE - VII Section.
Removal of Silt at Vijayawada Road east side from ROB to Agathavarapadu Vagu in AE-VII Section
Providing wall art paint at Collector Office road from ROB to Municipal TB in AE-4 Section
Urgent repairs to ROB approaches at Km 5/0-4 of Veparalla Bhupasamudram road in Anantapuramu District
Providing Water Proof Painting to the Guntur ROB at 8th and 10th Ward side in Bapatla Municipality
Providing Water Proof Painting to the Guntur ROB at 10th and 13th Ward side in Bapatla Municipality
Providing Water Proof Painting to the Guntur ROB at 10th and 13th Ward side in Bapatla Municipality
Providing Water Proof Painting to the Guntur ROB at 8th and 10th Ward side in Bapatla Municipality
Providing Central Lighting in Rastrapathi Road from ROB to Entrance Arch at Pydiparru area in Tanuku Municipality
Construction of bridge near Vadapalem Gedda in Ommivanipalem village in ward no. 06 of Zone - I.
Construction of bridge on road from P.Kothuru to Kothavedurupalem,Korapalli via Bonangipalli village of Visakhapatnam District
Construction of Bridge at Mathsyapuri road to Bypass road (near Chainage 200 Meters) in 30th ward
Construction of Bridge on the road from Kodaputtu to Pantharaputtu in Munchingiput mandal of Visakhapatnam District
Construction of Bridge at Sarabannapalem village of Koyyuru mandal of Visakhapatnam Est. Cost Rs.80.00 lakhs
Construction of Bridge at Ginjarthi village of Koyyuru mandal of Visakhapatnam Est. Cost Rs.80.00 lakhs
Construction of Bridge on Syamala kodu drain in Gudivada Municipality under MPLADS & General Fund 2017-18
Construction of Bridge at Mathsyapuri road to Bypass road (near Chainage 200 Meters) in 30th ward
Construction of bridge on road from P.Kothuru to Kothavedurupalem,Korapalli via Bonangipalli village of Visakhapatnam District
Construction of Bridge on NSP Caanal at YSR Hospital at Ward No.23 of Narasaraopet Municipality.
Construction of Bridge across Peter Canal near Kovur Village in Kovur Mandal of SPS Nellore District
Construction of Bridge at Mathsyapuri road to Bypass road (near Chainage 200 Meters) in 30th ward
Construction of Bridge across Peter Canal near Kovur Village in Kovur Mandal of SPS Nellore District
Rerouting of Gannavaram-Puttagunta road from Km. 2/069 to 2/913 by forming new road for 3.500 Kms along proposed compound wall of Gannavaram Airport in Krishna District-Sub work:Construction of High level bridge across Eluru Canal @Km.2/8 of Rerouting of Gannavaram-Puttagunta road in Krishna District
Construction of 4 Lane Road from Km 2/500 of Vakalapudi-Edatam Road to the New Beach Festival Area, including High Level Bridge 3 vents of 16.50 Mt on Salt Creek on Shore of Bay of Bangole, in East Godavari District" Sub work:- Providing Ornamental Protection Railing to Bridge portion.
Reconstruction of Four Lane High level bridge at Km 1.440 0f Krishna Circle to Devuni kadapa Road in Y.S.R Kadapa District Under the main work " Widening and Strengthening of Road from Krishna Theater to Devuni Kadapa Road via Market Yard from Km 0/0 to 2/2 in YSR District
Rerouting of Gannavaram-Puttagunta road from Km. 2/069 to 2/913 by forming new road for 3.500 Kms along proposed compound wall of Gannavaram Airport in Krishna District-Sub work:Construction of High level bridge across Eluru Canal @Km.2/8 of Rerouting of Gannavaram-Puttagunta road in Krishna District
Presurvey Estimate for the work of Construction of High Level Bridge in Km 3/6-8 of Inner Ring road ARM II to Kuppam town Under the Main work of Improvements to Inner Ring Road ARM II to Kuppam town from Km 2/4 to 4/8 in Chittoor District
Rerouting of Gannavaram-Puttagunta road from Km. 2/069 to 2/913 by forming new road for 3.500 Kms along proposed compound wall of Gannavaram Airport in Krishna District-Sub work:Construction of High level bridge across Eluru Canal @Km.2/8 of Rerouting of Gannavaram-Puttagunta road in Krishna District
1) Godavari Pushkarams-2027 Arrangements: Development of New platform ( PF No. 6) on the other side of station at RJY and improvements to Road surfaces of level crossings, RUBs and LHS s in the Vicinity of Pushkaram handling stations (GVN, KVR & ... 2nd Foot over Bridge with ... nd Foot over Bridge with ...
Re-construction of Minor Bridge at Km.5/8 of Gondiparla - Devamda road. Sub work: Procurement of computers and its peripheral to (R&B) Circle office ,Kurnool (2 nd call)
Construction of Minor Bridge on Rallagedda at km.3/6-8 of Gurivinaidupeta to Pudi road from km.6/1 of Saluru Municipal Limits to Pachipenta road in Vizianagaram District.
Construction of Minor Bridge on Rallagedda at km.3/6-8 of Gurivinaidupeta to Pudi road from km.6/1 of Saluru Municipal Limits to Pachipenta road in Vizianagaram District.
Permanent Restoration to collapsed Minor Bridge at km.2/8-10 of Donubai to Neelakantapuram Road damaged due to Mosoon heavy rains in Parvathipuram Manyam District (SH 088) (2nd call)
Reconstruction of Minor Bridge in Km. 1/8 of Edarapalli Bridge to Ambajipeta Road (via.) Indupalli, Sakurru from Km. 0/000 to 7/600 in Dr.B.R.Ambedkar Konaseema District (Indupalli Bridge)
Construction of Minor Bridge in Km 2/2 of Edarapalli Bridge to Mukkamula lock to connect Black bridge to Mukkamula lock PR road (Near Nadipudi lock) in Dr.B.R.Ambedkar Konaseema District
Construction of Slopes to SP at Km 71.600, L-Class Bridges at Km 70/800, L-class Bridges at Km.69/015, L-class bridge at Km 62.200, near railway bridge at Km 61.500, SP at Km 61.200, near DP-5 at Km 59.000 and L-Class Bridges at Km 58.700 of RBHLC
Construction of ROB at Yerraguntla in lieu of L.C.No 138 at Rly.Km 298/4-5 of Renigunta section corresponding to road Km 0/4-8 of Yerraguntla-Proddatur road in Kadapa District (link road)Sub work:- Providing Lighting to the ROB