Loading…
Loading…
2,187 results • Best match
Construction of Approaches, Drainage facilities, including land acquisition, Shifting of utilities for Railway Under Bridge (RUB) at KM 175-8-9 at Railway Kodur in YSR Kadapa District, Est. cost Rs.500.00 Lakhs
Widening & Strengthening of road from Appaiah Gate to MP road from Km. 0/0 to Km. 16/920 in SPSR Nellore District. SUB-WORK:- Construction of Minor Bridge at Km. 14/10 and Road dam at Km. 12/2 of Road from Appaiah gate to M.P. Road in SPSR Nellore
Package No.AP20PIII-LSB19, Construction of Bridge across Pedda Gedda on the road from Garividi to D Kanapaka via Geddapuvalasa in Gurla mandal of Vizianagaram District. Est.Cost Rs.Rs.520.00 Lakhs and Rs.14.30 Lakhs for Routine Maintenance.
Maintenance of Old Raw Water 240 HP Pump Houses, Old and New Filter Beds Flacculator Bridges etc., at SS Tank in Guntakal Municipality under General Funds 2020-21
Improvements to Darsi - Chimakurthy Road from Km.9/0 to 25/6 including Construction of three bridges in Km.27/4, 33/8 & 35/4 in Prakasam District.
E tender for RC for Removal replacement cleaning and Painting of Oxy-Acetylene Pipe Line System and Supporting Towers Bridges at NDV for a period of three years
Removal of silt in canal bed and repairs to DP's ande painting to foot bridges in identified reaches in between km 0/000 to 22/000 of RBLLC
Removal of wet silt in CC Out fall drain from 3 Bridges to Arundelpet 10th line via Donka Road in Div. No.45 & 49 under AE-8 Section
NUDA - Providing Art Work/Figurative/Non figurative /Stencils/Letter Writing/ on walls with Enamel Paint to Railway Under Bridges at Atmakur Bustand and Ramalingpuram in Nellore Municipal Corporation
Construction of R.C.C. Cantilever Retaining wall to L/S bank of Swarnamukhi River in between two Road bridges (Ramasetu and Baktha Kannappa) near Srikalahasti Town of Chittoor District
Guntakal Division: Provision of of escalators (Up & Down) for 12m Foot Over Bridges at Anantapur, Sri Kalahasti, Kadapa, Tadipatri, Mantralayam Road, Dhone & Dharmavaram Railway stations - Power supply arrangements.
Provision of permanent central inspection pathways, metalizing of girders along with replacement of corroded members of various bridges under SSE/Br/WAT under Jurisdiction of ADEN/Br/WAT.
Repairs to Bridges i.e.., retaining walls at approaches, Inspection steps, flooring, drop and curtain walls, Br No plaques, foundation detail plaques, ventway clearances in ADEN/West/GNT section
Vijayawada Division - Additions and alterations to OHE in connection with Proposed construction of 4 lane ROB at Loc 342/25-29 between Chirala and stuartpuram stations of GDR-BZA section of Vijayawada Division.
Construction of ROB in Lieu of L.C No. 98 of SWR at Rail way Km 241/700-800 of Chennai - Bangalore line at Km 8/100 of Kuppam - Patchur road in Chittoor District
Urgent Repairs to Right Side service road of ROB at Milk Project in view of diversion of traffic due to the construction of Kanaka Durga Fly OVer in Vijayawada City in Krishna District
Supply of water tanker 4500 Ltrs capacity for watering the central median along K N Road Eluru Road Bhimavaram Road Tanuku Road and Road from New RoB to Housing baord junction inTadepalligudem Municipality
Construction of 3 arms ROB in lieu of L.C.No.381 at Nidadavole at road Km 16/240 of Prathipadu to Nidadavole road and at Railway Km 556/15-17 in West Godavari District.
CONSTRUCTION OF ROB IN LIEU OF L.C. NO. 158 (KAVALI YARD) AT RAILWAY KM 225/14-16 OF GUDURU - VIJAYAWADA SECTION AT KM 0/0-6 OF KAVALI - PEDAPAVANI ROAD IN NELLORE DISTRICT
Urgent Repairs to Right Side service road of ROB at Milk Project in view of diversion of traffic due to the construction of Kanaka Durga Fly OVer in Vijayawada City in Krishna District
Urgent Repairs to Left side service road of ROB at Milk Project in view of diversion of traffic due to the construction of Kanaka Durga Fly over in Vijayawada City in Krishna District
Construction of 3 Arms ROB in lieu of LC No 381 at Nidadavole at road Km 16/240 of Prathipadu-Nidadavole road and at Railway Km 556/15-17 in West Godavari District
De-silting of outfall drain to both sides of Nunna Road from DP Station to Pipula Road Junction and SOuth side from DP Station to ROB at Ajith Singh Nagar (Rc.E11-105301/2021)
Construction of ROB in Lieu of L.C No. 98 of SWR at Rail way Km 241/700-800 of Chennai - Bangalore line at Km 8/100 of Kuppam - Patchur road in Chittoor District
Construction of Foot Bridge in Hindu Burial Ground in Chinapulivarru(V) of Kolluru (M) Est Cost Rs 7.00 Lakhs
Preparation of Detailed Project Report of Construction of Bridge at ch.1/800 mts on the Road from Magathapalem (Vedurupalli) to Akuthota in G.Madaugula Mandal of ASR District Est.Cost Rs 5.00 lakhs.
Construction of minor bridge with 3V of 6.0 M at Km 11/8 of Kuppam to Chigurugunta Gold mines road under the main work Improvements to Kuppam Chigurugunta Gold mines road (via) Gundlanayana palli from Km 0/0 to 12/7(Working reach from Km 1/4 to 12/7) in Chittoor District.
Widening of Existing Minor Bridge with 4Vx5.37 (eff span) at Km 70/2 under the main work of Improvements to Palamaner - Krishnagiri road from Km 69/750 to 70/250 of Kandaswamy hotel to Palace road Junction (2nd reach) by providing central divider and lighting in Kuppam town limits in Chittoor District
Widening and strengthening of Road Pakivalasa to Jamachakaram from Km 5/8 to 12/6 and C.P road to Jamchakaram from Km 0/0 to 3/5 in Srikakulam District. Sub work- Reconstruction of Weak and Narrow Minor Bridge at Km 5/8-10 of Pakivalasa to Jamachakaram road in Srikakulam District
Desilting of outfall drain along North side of Nunna Road from Macca Maszid Road to R&B culvert at D.P.Station and along west side of Nunna Road from Macca Maszid to Singh Nagar ROB
Urgent Repairs to ROB service roads on either side of the approach road towards Kurnool side in Km 289/2-4 of old NH-18 (Maintained by (R&B) Division, Nandyal) in Kurnool district.
Presurvey for construction of ROB in Km 0/8 of Mangalagiri - Pedaparimi road near Mangalagiri in lieu of LC.No.14 of Railway Km 19/7-9 in Guntur - Krishna canal junction in Guntur District
Preparation of DPR for the work Construction of ROB in lieu of L.C.No.40 at Railway Km 9/4-5 of Sattenapalli - Reddygudem and Km 1/4-6 of Sattenapalli - Madipadu in Guntur District.
Construction of ROB in lieu of LC.No.183 at RAilway Km 258/0-1 of Guntur - Nandyal section and Km 0/6 of Nandyal - Atmakur road in Kurnool district, SW:- Providing road safety work
Supply, Delivery and fixing of LED Strip light for Electrical poles at Suryalaka Beach road, Cheel Road Junction to Guntur ROB , Spun poles along GBC Road , Radham Bazar, Clock tower Road in Bapatia Municipality
Construction of ROB in lieu of LC.No.183 at RAilway Km 258/0-1 of Guntur - Nandyal section and Km 0/6 of Nandyal - Atmakur road in Kurnool district, SW:- Providing road safety work
CONSTRUCTION OF ROB AT PALASA IN LIEU OF L.C.NO.373 AT RLY KM 676/37-39 AND ROAD CHINAGE AT KM 177/800 AT VISAKHAPATNAM - BHUBENESEWAR ROAD ( OLD NH5 ) IN SRIKAKULAM DISTRICT ( BALANCE WORK)
Construction of ROB At Palasa in Lieu of LC.No.373 at Rly Km 676/37-39 and Road chinage at Km 177/800 at Visakhapatnam - Bhubaneswar road (Old NH5) in Srikakulam District (Balance work)
Presurvey for construction of ROB at Km 13/8 of Pulladigunta - Perecherla road near Guntur in lieu of LC.No.6 of Railway Km 9/4-5 in between Guntur - Nadikudi section in Guntur District
Presurvey for construction of ROB at Km 13/8 of Pulladigunta - Perecherla road near Guntur in lieu of LC.No.6 of Railway Km 9/4-5 in between Guntur - Nadijudi section in Guntur District.
Providing Hot Mix BT Road and Thermoplastic Road Marking to Sanakkayala Road from Three Bridges to Nehru Nagar Road in Div No.5&6 under AE-5 Section LLR
Supply, Delivery and Fixing of 100W LED Flood Lights at Railway under pass (Low Bridges) both sides near Rajiv Gandhi Park and K.G. Market side in Circle-1 area.
Painting to old foot bridges, Security rooms and Providing new Height arrestors from Km.72/000 to Km.88/000 in HLC No.3 Section, Ballari of RB HLC.
CONSTRUCTION OF MINOR BRIDGE AT KM 20/2 OF KANDUKURU-GUDLURU-TETTU ROAD IN NELLORE DISTRICT
Package No.AP10 PIII HLB 03- Construction of High Level Bridge Across Paleru Vagu on the Road from T12 - Akumalla to Banaganapalli of Sanjanamala Mandal of Kurnool District, Estimate Cost Rs.796.11 Lakhs.
Strengthening of SPVBR Left Canal by constructing new foot bridge at Narasanapalle in B Mattam Mandal of YSR Kadapa District
Strengthening of SPVBR Left Canal by constructing new foot bridge at Mallepalle in B Mattam Mandal of YSR Kadapa District
Construction of Bridge across Sarada River at 2/5 Km on the R/F GPY Road to OLD NH-5 via Kattupalem, Somalingapalem, Jampapaplem,Thurangalapalem, Ramaraidupalem in Yellamanchilli Mandal, Estimate Cost:Rs.120.00 Lakhs
Construction of Bridge across Sarada River at 2/5 Km on the R/F GPY Road to OLD NH-5 via Kattupalem, Somalingapalem, Jampapaplem,Thurangalapalem, Ramaraidupalem in Yellamanchilli Mandal, Estimate Cost:Rs.120.00 Lakhs
Construction of Bridge across Sarada River at 2/5 Km on the R/F GPY Road to OLD NH-5 via Kattupalem, Somalingapalem, Jampapaplem,Thurangalapalem, Ramaraidupalem in Yellamanchilli Mandal, Estimate Cost:Rs.120.00 Lakhs