Loading…
Loading…
2,187 results • Best match
Package No APGNT PRR SCC 2018-014 1.Construction of Single lane Bridge at KM 34-000 of BM Drain near Akkivaripalem Ho Pedapulivarru(V) of Bhattiprolu (M) Est Cost Rs72.30 Lakhs 2.Construction of Foot Bridge across K. W Bank canal at km 55.600 in Pedapulivarru Village of Bhattiprolu Mandal in Guntur Dist Estimate Cost Rs 25.85 Lakhs.Est cost Rs.98.15 Lakhs
Package No APGNT PRR SCC 2018-014 1.Construction of Single lane Bridge at KM 34-000 of BM Drain near Akkivaripalem Ho Pedapulivarru(V) of Bhattiprolu (M) Est Cost Rs72.30 Lakhs 2.Construction of Foot Bridge across K. W Bank canal at km 55.600 in Pedapulivarru Village of Bhattiprolu Mandal in Guntur Dist Estimate Cost Rs 25.85 Lakhs.Est cost Rs.98.15 Lakhs
GTL Div: OHE Modifications in lieu of Raising of platforms to high level and provision of new 3m FOB at Rayalacheruvu (RLO), Juturu (JUR), Kalamalla (KMH), Obulavaripalli (OBVP), Nandalur (NRE), Pullampet (PMT) & Hastavaram (HAQ) Stations in GY-RU Section
GTL Div: OHE Modifications in lieu of Raising of platforms to high level and provision of new 3m FOB at Rayalacheruvu (RLO), Juturu (JUR), Kalamalla (KMH), Obulavaripalli (OBVP), Nandalur (NRE), Pullampet (PMT) & Hastavaram (HAQ) Stations in GY-RU Section
Construction of ROB in lieu of LC N0. 158 (Kavali Yard) at Railway Km. 225/14-16 of Guduru - Vijayawada Section at Km. 0/0-6 of Kavali - Pedapavani road in Nellore District. (2nd call)
Construction of ROB in lieu of L.C No.249 in Guntur town limits at Railway Km 22/10-11 of Guntur - Tenali section and at Km 1/6 of Guntur - Hanumanpalem road in Guntur District
Construction of ROB in lieu of LC N0. 158 (Kavali Yard) at Railway Km. 225/14-16 of Guduru - Vijayawada Section at Km. 0/0-6 of Kavali - Pedapavani road in Nellore District. (2nd call)
Vijayawada Division: Additions and alterations to OHE in connection with "Replacement of corroded, over aged girders and Bridges which have exceeded their fatigue life with new girders" in BZA division.
WIDER PRESTRESSED CONCRETE SLEEPER FOR SHARP CURVES ON BRIDGES WITH CHECK RAIL (52kg) & GUARD RAIL (52kg) ARRANGEMENT FOR B.G. 60kg (UIC) /60E1 RUNNNING RAIL FOR MORE THAN 5 DEGREE CURVES
Construction of R.C.C. Cantilever Retaining wall to L/S bank of Swarnamukhi River in between two Road bridges (Ramasetu and Baktha Kannappa) near Srikalahasti Town of Chittoor District (2nd Call)
Vijayawada Division: Additions and alterations to OHE in connection with "Replacement of corroded, over aged girders and Bridges which have exceeded their fatigue life with new girders" in BZA division.
Guntakal Division-Provision of lifts on the Foot Over Bridges of Dhone, Tadipatri, Pakala, Anantapur, Adoni, Rajampeta, Gooty, Mantralayam Road, Sri Kalhasthi, Dharmavaram and Yerraguntla railway stations - Power supply arrangements.
Preparation of DPR for the work of Construction of RUB in lieu of L..No.2 at Railway Km 1/4-5 of Guntur - Krishna Canal section at Sanjeev Nagar in GMC limits in Guntur District
Consultancy services for preparation of Detailed Project report for the work Construction of 2 Lane ROB & approaches as one time improvement in Lieu of LC No.8E/SPL3 at Km.7/01-02 and Km.91/2 & LC No.114 T/SPL3 at Km.105/5-6 and Km.81plus400 of NH165 ... section ROB ).
Under the main work of Construction of Proposed 4Lane ROB and its approaches in lieu of existing level crossing No.124E SPL 3 at Km.1.800 on NH 205 between Prasannayapalli and Jangalapalli railway stations on Anantapuramu Dharmavaram Railway section ... of ROB at ...
Urgent Repairs to Minor Bridge at Km 12/4 of Buchi - Dagadarthi road in SPSR Nellore District
1. Preparation of Detailed project reports for Bridge works in respect of Rural connectivity of PVTG habitations under PM-JANMAN Programme of Chintapalli, G. Madugula and G.K. Veedhi mandals in Alluri Seetharamaraju District Est. Cost. Rs. 17.60 lakh (Tentative).
Preparation of Detailed Project Report for the Construction of Bridge across Nagavali River connecting Gandredu-Belamam road Muddadapeta village at Km 7/2 of Ragolu - Palakonda R&B road, Amadalavalasa constituency in Srikakulam District
Detailed surveying, Soil Investigation and Bridge designs including DPR preparation for the work Construction of Bridge on the Road from Chowduwada to Mallampalem of K.Kotapadu Mandal in, Visakhapatnam District Estimate cost :Rs.3.60 Lakhs
Detailed surveying, Soil Investigation and Bridge designs including DPR preparation for the work Construction of Bridge on the Road from Chowduwada to Mallampalem of K.Kotapadu Mandal in, Visakhapatnam District Estimate cost :Rs.3.60 Lakhs
Providing of hand railing painting of ROB at Alamanda in lieu of LC No.2 at Railway km.843/3 between Alamanda-Kantakapalli railway station at km.23/8-10 of Vizianagaram-Kothavalasa road in Vizianagaram.
SPECIAL REPAIRS TO PALAMANER - KRISHNAGIRI BYE PASS ROAD FROM KM 129/085 TO 130/150 (ROAD TAKEN OVER FROM (R&B) NH AS ROB IS HANDED OVER TO NH IN KUPPAM TOWN LIMITS) IN CHITTOOR DISTRICT
Construction of ROB inlieu of L.C.No.183 at Railway km 258/0-1 of Guntur-Nandyal section and km 0/6 of Nandyal - tmakur road in Kurnool district . Sub work: Construction of Side drains (3rd call).
Construction of 2 Nos of Bridges across Buggavanka in lieu of Low-Level Cause Way from Nagarajupeta to Ravindra Nagar and at Gurralagadda to Shamirya Masjid (Ravindra Nagar) in Kadapa Town
MW:- Improvements to road from Km 281/300 to 292/100 of Old NH-18 in Nandyal town limits in Kurnool district SW:- Repairs to parapet walls and painting to bridges
Construction of 2 Nos of Bridges across Buggavanka in lieu of Low-Level Cause Way from Nagarajupeta to Ravindra Nagar and at Gurralagadda to Shamirya Masjid (Ravindra Nagar) in Kadapa Town
Providing Hot Mix BT Road and Thermoplastic Road Marking to Sanakkayala Road from Three Bridges to Nehru Nagar Road in Div No.5&6 under AE-5 Section LLR (2nd call)
Construction of 2 Nos of Bridges across Buggavanka in lieu of Low-Level Cause Way from Nagarajupeta to Ravindra Nagar and at Gurralagadda to Shamirya Masjid (Ravindra Nagar) in Kadapa Town
Construction of 2 Nos of Bridges across Buggavanka in lieu of Low-Level Cause Way from Nagarajupeta to Ravindra Nagar and at Gurralagadda to Shamirya Masjid (Ravindra Nagar) in Kadapa Town
Construction of 2 Nos of Bridges across Buggavanka in lieu of Low-Level Cause Way from Nagarajupeta to Ravindra Nagar and at Gurralagadda to Shamirya Masjid (Ravindra Nagar) in Kadapa Town
Construction of High Level Bridge across Kundara Vagu on road from Kondupalli to Uyyalawada via R.Papampalli in Uyyalawada (M) of kurnool District, Package No AP10 P III HLB 01, Estimate Cost Rs.500.00 Lakhs.
Package No.AP14PIII LSB19 - Construction of high level bridge on Rallavagu at 9/1 Km on Madhavaiahpalem PR Road to Pangili in Rapur Mandal Est. Cost. Rs. 585.00 lakhs and MTC Cost. Rs.16.09 lakhs
Bridge zonal (Steel works) contract for execution of Bridge works under SSE/Br/RGDA sections on DMNJ - SPRD on KR line and THV-LDX section on RV Line under the jurisdiction of ADEN/Br/WAT for the period ending 30.06.2027.
Shifting of 11KV/LT line at SS-2 and SS-3, Chandrampalem, Madhurawada in favour of M/s. Commissioner GVMC, Visakhapatnam for construction of Foot Over bridge on existing highway road, Madhurawada in Madhurawada Section in Madhurawada Sub-Division of Zone-III Division, Visakhapatnam Circle
Reconstruction of Four Lane Minor Bridge (1V x 10.00 Mtrs Span) at Km 1.230 of Krishna Circle to Devuni kadapa Road in Y.S.R Kadapa District". Under the main work of - Krishna Circle to Devuni Kadapa " ( Widening and Strengthening of Road from Krishna Theatre to Devuni Kadapa Road via Market Yard from Km 0/0 to 2/2)
Pre survey estimate for construction of ROB at Km.0/8 of Yerramukkapalli circle to Viswanathapuram road in lieu of LC gate No.120/Spl.T@ Railway Km.260/11-12 of Madras-Guntakal section in Kadapa District
Pre survey estimate for construction of ROB at Km.0/8 of Yerramukkapalli circle to Viswanathapuram road in lieu of LC gate No.120/Spl.T@Railway km.260/11-12 of Madras-Guntakal section in Kadapa District
Construction of ROB in Gudur twon limits at Km.135/2-4 of Chennai -Vijayawada section in lieu of L.C No.99 A & 99B on Municipal road Sub Work :- Dismantling of existing structures in Gudur town side
Urgent Repairs to Central divider from km. 394.550 to 395.550 and panting to ROB at Km. 404/10 of NH 544D (Ananthapur to Guntur Road) in (R&B) NH Division, Vijayawada in the state of Andhra Pradesh
Urgent Repairs to Central divider from km. 394.550 to 395.550 and panting to ROB at Km. 404/10 of NH 544D (Ananthapur to Guntur Road) in (R&B) NH Division, Vijayawada in the state of Andhra Pradesh
Construction of ROB At Yellamanchili in lieu of LC No 475-A at Railway Km 723/8-10 at Km 332/8 of old NH5 road in Visakhapatnam District. Sub work:- Providing Electrification to the above Bridge.
Development of Greenary and maintenance of Plantation in Traffic Park in Housing Board Colony in 34th ward & Maintenance of Landscape works (Central Median) from Housing Board Colony Junction 2nd RoB Bridge for 1 Year in Tadepalligudem Municipality.
Construction of approaches to the existing 2Lane ROB in lieu of L.C. No. RV 324 at Km.436.12 13 between Komatipalli and Gajapathimagaram station at km 515.200 NH26 in the state of Andhra Pradesh on EPC mode
Construction of ROB in Gudur twon limits at Km.135/2-4 of Chennai -Vijayawada section in lieu of L.C No.99 A & 99B on Municipal road Sub Work :- Dismantling of existing structures in Gudur town side
Pre survey estimate for construction of ROB at Km.0/8 of Yerramukkapalli circle to Viswanathapuram road in lieu of LC gate No.120/Spl.T@Railway km.260/11-12 of Madras-Guntakal section in Kadapa District
Providing road safety interventions under the construction of ROB in lieu of LC No.127 at railway Km.210/1-2 of Gooty - Dharmavaram section at Km.1/4-6 of Anantapuramu - Thogarakunta road in Anantapuramu District
Widening and Strengthening of Marteru - Koderu Road from Km 0.000 to 13.440 in W.G.Dist. Sub-Work:-Providing Painting to the Bridges and Deviders on Marteru - Koderu Road from Km 0.000 to 13.440
Preparation of DPR for Strengthening of 6 Bridges on Vakalapudi - Edatam road at km 3/2, 7/1, 7/2, 8/6, 15/1, 18/2 in Kakinada in E. G. District
Preparation of DPR for Strengthening of 6 Bridges on Vakalapudi - Edatam road at km 3/2, 7/1, 7/2, 8/6, 15/1, 18/2 in Kakinada in E. G. District
Widening and Strengthening of Marteru - Koderu Road from Km 0.000 to 13.440 in W.G.Dist. Sub-Work:-Providing Painting to the Bridges and Deviders on Marteru - Koderu Road from Km 0.000 to 13.440